Rajiv Agarwal, Senior Site Architect

Rajiv Agarwal

Senior Site Architect

SSH International

Lieu
Koweït - Hawali
Éducation
Baccalauréat, Architectural engineering
Expérience
30 years, 8 Mois

Partager Mon CV

Empêcher usager


Expériences professionnelles

Total des années d'expérience :30 years, 8 Mois

Senior Site Architect à SSH International
  • Koweït
  • Je travaille ici depuis novembre 2008

The present Project is the construction of Bid Pack 5A& 5B - Roads, Site Utilities, Street Lighting, Surface Parking, Hard / Soft Landscaping, Water Features, Gardens and Oasis Works with a cost US$ 300 Million for Kuwait University. The project is located in Sabah Al-Salem University City-Shadadiya.

The 2nd Project was the construction of Bid Pack 6A& 6B - 13 Decked Parking, 25 Shelters and Associated 5 Ancillary Buildings with a cost US$ 250 Million. The projects in Sabah Al Salem University development are focused on sustainability principles and the buildings are designed intuitively.

The 1st Project was construction of 36 Story Building Tower for Al Saud United Real Estate Company with a cost US$ 40 Million. The Tower consists of two Basement, Ground Floor and Mezzanine Floor for retail, a Service Floor, 32 Office Floors divided by a Mechanical Floor at 15th floor level, a further 3 Office Floors and 2 Service Floors at the top. The scope of the work comprises structural, architectural, MEP Services & other associated works.

Senior Site Architect à Dar Al-Handasah
  • Koweït - Al Koweït
  • janvier 2007 à octobre 2008

The project was Construction of Special Forces Facilities for MPW, Kuwait with a cost US$ 200 Million.The project comprise of 50 Buildings for Command, Administration & Accommodation, Military Training and Sports Provisions, Infrastructures and Environmental Services. Due to vast area and its diverse functional requirements; the project is divided in to 5 Units namely ‘Main Entrance Buildings’, ‘Special Forces Departments’, ‘Education and Military Training Fields’, ‘Sports and Communal Facilities’ and ‘General Support Services’; each of which accommodates a group of compatible functional buildings.

Senior Site Architect à The Associated Engineering & Partnership / JSBP JV
  • Koweït
  • octobre 2004 à octobre 2006

The project was the construction of State Audit Bureau New Headquarters for SAB, Kuwait with a cost US$ 90 Million. It is a combination of concrete, steel and glass curtain wall, consists of Head Quarter Building (Built up area 48000) & Car Park structure (Built up area 60000). The Head Quarter building consists of two atria and three parallel office buildings each 8 storey high having offices, conference center, cafeteria, library, VIP offices, health club, six storey high entrance loggia. Demountable partitions and raised floor are used throughout the building with the space under, being used for distribution of all services.

Site Architect à Bonyan Design
  • Koweït
  • août 2002 à septembre 2004

The project was the construction of College of Health Science for PAAET, Kuwait with a cost US$ 21 Million. It consist Main Building of 3 floors with an area of 7000 sqm administration building and amphitheater.

Site Architect à Pan Arab Consulting Engineers
  • Koweït
  • novembre 2000 à octobre 2001

The project was the construction of Hilton Resort for Touristic Enterprises Co with a cost US$ 50 Million. It is a 5-star enterprise constructed to international standards on 250, 000 sqm of sea front property.

Site Architect à Jassim Qabazard Engineering Consultants
  • Koweït
  • juin 1998 à octobre 2000

The project was the construction of Computer Center/Lecture Hall in Kuwait-University with a cost US$ 42 Million for MPW Special Projects. The building comprises of two units with built up area 34000 sqm and are linked by a plaza area. The complex represents Gate to the University.

Architectural Engineer à Hyundai Engineering & Construction Co
  • Koweït
  • janvier 1997 à avril 1998

The project was the construction of Sabiya Power Station 2400mw for MEW, Kuwait, with a cost US$ 350 Million. It consist turbine generator units, chimney, and 20 supporting buildings including administration & control building, connected to turbine units through bridge.

Architectural Engineer à Sehgal Jatia & Associates
  • Inde
  • octobre 1993 à septembre 1996

The project was the construction of Residential Housing Complex at Panchkula for AWHO with a cost US$ 3 Million. It consists 23 blocks with 332 flats & stilt car parking at GF.

Architectural Engineer à Architect’s Forum
  • Inde
  • juillet 1992 à septembre 1993

The project was Lord’s resort for Suman Motels Ltd, Mumbai with a cost US$ 0.3 Million. It consist 50 guest rooms, 20 detached guest bungalows, restaurants, swimming pools, complete with sauna & Jacuzzi, landscaping, play area for children and sport /recreational facilities.

Éducation

Baccalauréat, Architectural engineering
  • à National Institute of Technology Calicut
  • juin 1992

Specialties & Skills

Construction Engineering
CONSULTING
ENGINEERING
Construction

Langues

Anglais
Expert

Adhésions

Kuwait Society Of Engineers
  • Member ID 18735
  • January 2005
Project Management Institute- PMI, USA
  • Member ID 2664103
  • January 2013
Institution of Engineers, India
  • Life Associate Member ID 088361-4
  • January 1993

Formation et Diplômes

PMP-Project Management Certification from PMI, USA (Certificat)
Date de la formation:
June 2013
Valide jusqu'à:
May 2017