Ram Ji Tiwari, Engineer-Production

Ram Ji Tiwari

Engineer-Production

Cairn India Limited, Rajasthan

Lieu
Inde - Kanpur
Éducation
Baccalauréat, Chemical Engg
Expérience
13 years, 7 Mois

Partager Mon CV

Empêcher usager


Expériences professionnelles

Total des années d'expérience :13 years, 7 Mois

Engineer-Production à Cairn India Limited, Rajasthan
  • Inde
  • Je travaille ici depuis août 2012

Production Controlling, Daily Production Report, MPFM well testing, Babble fish server, Coil tubing operation, Slick Line Operation, Well intervene, work over, Pigging, Preventive maintenance, Enhanced Oil Recovery Process -Operation, Commissioning of new oil well pads etc.

Assistant Manager (Commissioning/Operation) à ESSAR OIL LIMITED
  • Inde
  • août 2010 à mai 2012

➢ ESSAR OIL LIMITED, Jamnagar: Working as Commissioning/Operation Engineer (Oil & Gas) in Refinery Expansion Project (Vacuum Gas Oil Hydrotreater Unit) Since August 2010. An ESSAR group oil company having crude Processing capacity of 14 MMTPA and revamped to 18 MMTPA.
➢ Designation:- Assistant Manager (Commissioning/Operation)

KNOWLEDGE IN:-
➢ Process operations
➢ Pre-Commissioning & Commissioning
➢ Process & instrument drawings
➢ Mechanical drawings and layout
➢ System markup on P&ID for Hydrotest & flushing plan
➢ System markup on P&ID for leak check and plant startup

PROFESSIONAL SYNOPSIS:-

ASSISTANT MANAGER à Major Units of Refinery
  • Inde
  • novembre 2010 à avril 2011

➢ 1yr & 8 Months of rich experience in Major Units of Refinery. Such as SRU/ARU/SWS/SPU as a Production Engineers from Nov 10 to April 11 & in VGOHDT from April 11 to present as an commissioning/Production engineer for smooth start up of plant.
➢ Worked as Production Engineer in SRU/ARU/SWS/SPU Units of Base Refinery Operation from Nov 2010 to April 2011. & given ideas for improving the efficiency of MCC (Main Combustion Chamber) & Roto-formers steel belt operation.
➢ As of Now working as Commissioning/Operation Engineer In VGHODT after successful commissioning of VGOHDT from Scratch to Full fledge Plant, during the Phase of Commissioning I've Carried out several tasks being related to Precommissioning/Commissioning Project of Vacuum Gas Oil Hydrotreater Unit such as the job of deviation finding (Punch Points) in erected system, making SLD (Single line diagram), Isometrics & flushing plan, Catalyst loading (Sock & Dense method) of Reactors, leak test of system, alkali boil out of heat exchanger, Circulation of feed, Pre-wetting of Reactors, Sulfiding of Catalyst etc.
➢ Worked as Safety Officer in Refinery Mega Turn Around Project (17 sep to 25 oct. 2011) & proficiently executed safe confined space entry work permit, hot work permit, cold work permit PSSR ( Pre Safety Start-Up Review) as well.

HIGHLIGHTS:-

➢ Working for Essar Oil Refinery Expansion Project, VGOHDT ( UOP Model, 6.14MMTPA)
➢ Commissioning of HYDROTREATER UNIT, having Capacity of 6.14 MMTPA at ESSAR OIL LTD.
➢ Familiar with Work permit systems, S.O.Ps, Hazard Identification and Risk Assessment, PSSR.

Production Engineer in SRU/ARU/SWS à SPU Units of Base Refinery Operation
  • Inde - Kanpur
  • novembre 2010 à avril 2011

➢ Worked as a Production Engineer in SRU/ARU/SWS/SPU Units of Base Refinery Operation from Nov 2010 to April 2011.
➢ Current CTC- 4 LPA. & Expected CTC- Negotiable
COMMISSIONING (SAFE & SMOOTH COMMISSIONING OF VGOHT UNIT): -

Éducation

Baccalauréat, Chemical Engg
  • à SRM University
  • mai 2011

➢ B.Tech (Chemical Engg.): 87.43% (SRM University, Chennai)

Baccalauréat, CHEMICAL ENGINEERING
  • à SRM UNIVERSITY, CHENNAI
  • mai 2010

➢B.TECH: 87.43 (SRM UNIVERSITY, CHENNAI) ➢HSC (Mathematics): 84.20%(B.N.S.D Siksha Niketan, Kanpur) ➢ SSLC (State Board): 68%(S.J.Vidya Niketan, Kanpur)

Specialties & Skills

Production Support
Commissioning
Production
Troubleshooting
Well Testing
ABSORPTION
CATALYST
CENTRIFUGAL PUMP
CIRCULATION
ENGINEER
OPERATIONS
PRE-COMMISSIONING
PRODUCTION ENGINEER
REFINERY

Langues

Hindi
Expert
Anglais
Expert

Formation et Diplômes

YELLOW BELT IN SIX SIGMA OPERATION (Certificat)
Date de la formation:
May 2011
Valide jusqu'à:
May 2011

Loisirs

  • Reading Motivational Books, Making New Friends, Networking and Socializing
    Proficiently handled back to back Commissioning and Start-up project of Aishwariya Well Pads,Enhanced Oil Recovery (EOR)and Artificial lift (Jet Pump, Gas lift, ESP, LRP) in Cairn India Limited, Rajasthan Ops being as a Production Engineer Proficiently handled Concept to Commissioning project of Vacuum Gas Oil Hydrotreater unit in Essar Oil Limited being as an Assistant Manager, Ops.