Rami Ibrahim, Implementation manager

Rami Ibrahim

Implementation manager

Huawei

Location
Jordan - Amman
Education
Bachelor's degree, Electronics And Communications
Experience
16 years, 3 Months

Share My Profile

Block User


Work Experience

Total years of experience :16 years, 3 Months

Implementation manager at Huawei
  • Saudi Arabia - Riyadh
  • July 2019 to August 2020

Manege Tawal project
Progress - deliverable are being completed within the baseline time scales.
• Cost - deliverable are being completed within the baseline cost plan.
• Quality - deliverable are being completed to defined expectations, first time.
• Performance (Value) - progress is being earned for the expected cost.
• Cash flow - net project cash flow is being achieved as the defined expectations.
• SHE - the required Safety, Health & Environmental standards are being achieved.
• Regulatory - all required statutory and regulatory conditions are being met.
• Reporting - regular and timely reporting of project progress to the sponsors.
• Risk - to proactively manage foreseen project risk, mitigating as necessary.
• Change - managing changes to the project without unduly affecting the stated objectives and benefits.
• Review weekly progress reports of Team Principals.

Project Manager at AL-RASHED COMATEC SAUDI ARABIA CO. LTD
  • Saudi Arabia - Riyadh
  • April 2013 to May 2019

• Progress - deliverable are being completed within the baseline time scales.
• Cost - deliverable are being completed within the baseline cost plan.
• Quality - deliverable are being completed to defined expectations, first time.
• Performance (Value) - progress is being earned for the expected cost.
• Cash flow - net project cash flow is being achieved as the defined expectations.
• SHE - the required Safety, Health & Environmental standards are being achieved.
• Regulatory - all required statutory and regulatory conditions are being met.
• Reporting - regular and timely reporting of project progress to the sponsors.
• Risk - to proactively manage foreseen project risk, mitigating as necessary.
• Change - managing changes to the project without unduly affecting the stated objectives and benefits.
• Review weekly progress reports of Team Principals.

MW Progress Controller (Whole Area in KSA) at Seoul Commtech Company Limited (one of the family companies of Samsung electronic)
  • Saudi Arabia - Riyadh
  • July 2009 to January 2013

- Receiving the survey request for microwave links to connect Samsung RAS to Mobily network.
- Issuing the site survey order to the subcontractor to perform the survey and collect the LOS data
- Receive the survey report and check it then give the approval.
- Issuing the work order and sending it to the subcontractor to initiate the work.
- Following up on the deployment phase.
- Performing the PAT and testing the link to receive it from the contractor.
- Issuing activation request to the NOC and IP team’s in order to integrate the IP system with the MW equipment
- Operation and maintenance for the installed links.
- Managing Site microwave implementation of more than 700 links in Riyadh, Jeddah & Dammam for Samsung and Mobily.
- MW Engineer in survey, implementation, and Configurations (NERA & HARRIS)
- Samsung RAS Engineer in configuration and integration the new system for Mobily WiMAX.
- Inspection and controlling for the quality installation Mobily WiMAX sites.

Project Supervisor at Nour Communications Co. Ltd
  • Saudi Arabia - Riyadh
  • December 2007 to July 2009

Link upgrade ''cut over'' to transfer current traffic (E1s) from old circuits to ADM\DXX system and to newly installed M-Link TN of sites.

Telecom Engineer at Nour Communications Co. Ltd.
  • Saudi Arabia - Riyadh
  • December 2006 to December 2007

Since 1year : Nour Communications - Bayanat Company, Riyadh & Jeddah, K.S.A
2006 Dec—Presents Worked as Telecom Engineer for the projects:- WiMAX .
Working with NOUR Communications Company and Bayanat company in WiMAX Project in Riyadh, Jeddah and Dammam as a WiMAX Engineer in survey, implementation, and Optimization departments with the following capabilities:
• Site acquisition as an initial contract between the company and the owner.
• LOS test between two candidate sites.
• Site implementation as a supervisor for the technicians and riggers teams includes Civil, Earthing, Electrical, HVAC, and Telecom work (Microwave and Communications equipments installations) in the site under construction in Riyadh city.
• Mobile and BTS power budget calculations.
• Calculation for the whole process of CDMA expansion includes civil, power and tower and antennas height, azimuth calculations with Huawei Company project.
• Working in RF and Optimizations Department in creating new sites plans for proposed area which will be included in the coverage area using Google Earth or depending on the site-site distance recommendations.
• Supervision of tower, cable tray, and shelters design in the new sites planning, design and then implementation.
• Site commissioning, assigning IP address for the sites (IDU and ODU), Sites Remote Access using RIP and OSPF protocols and working on the site from A-Z up to put it on air.
• Site integration including configuration for the WiMAX BTS, IP and frequency channels assignment, and RF test for all sites.
• Creating, modifying and filling SID (Site Installation Document), PAT (Preliminary Acceptance Test), OIL (Outstanding Items List) and BOQ (Bill of Quantities) which they are needed before and after Sites construction.
Throughput Test for the link after commissioning to test Stability and capacity of the link.

Area Supervisor at Nour Communications Co. Ltd.
  • Saudi Arabia - Medina
  • March 2004 to December 2006

Telecom Engineer for (Base station and Base station control_ BTS)
Worked as Telecom Engineer for the projects:- Nokia GSM E-6, E-7 .
The Nokia project involved the Installation, Commissioning, Integration and Drive testing of New Sites and Expansion and Swapps from Lucent to Nokia in the regions Makkah, Taif, Yanbu, Madinah K.S.A.
Responsibilities
•Commissioning and Integration of Ultrasite and Metrosites Nokia BTS.
•Commissioning Nokia Microwave Flexihopper and Metrohopper for Transmission.
•Preliminary Acceptence Test(PAT).
•CWO circuit wire order from BTS to BSC.
•Rehomming and Rebalancing of Nokia BSC.
•Drive testing for New and Expansion sites for Nokia with TEMS.
•Verification Tests (VSWR).
•Connect and testing alarms.
•Currently I’m involved in Medina Area supervising since May 2006.
Transmission Engineer: Nokia, Pcom, Harris, Ericsson Minilink..
The project involved the Installation Ericsson Minilink Transmission links of High apacity and Medium capacity Microwave sites in Madinah regions K.S.A
Responsibilities:
•Commissioning of Nokia Microwave
•Pcom, Harris maintenance.
•Commissioning of Ericsson Minilinks MW.
•Commssioning for High Capacity Link MW.
• Troubleshooting of the Ericsson MinilinkTransmission.

Education

Bachelor's degree, Electronics And Communications
  • at Arab Academy for Sciences and Technology and Martine Transport
  • September 2003

Specialties & Skills

Capacity
Integration
Installation
Commissioning
Testing
Microsoft Office XP, Microsoft Windows and Applications, Pascal and other basic Programming Language

Languages

Arabic
Expert
English
Expert