Submitting more applications increases your chances of landing a job.

Here’s how busy the average job seeker was last month:

Opportunities viewed

Applications submitted

Keep exploring and applying to maximize your chances!

Looking for employers with a proven track record of hiring women?

Click here to explore opportunities now!
We Value Your Feedback

You are invited to participate in a survey designed to help researchers understand how best to match workers to the types of jobs they are searching for

Would You Be Likely to Participate?

If selected, we will contact you via email with further instructions and details about your participation.

You will receive a $7 payout for answering the survey.


User unblocked successfully
Ramil  Makiling, QA/QC Mechanical-Piping Supervisor

Ramil Makiling

QA/QC Mechanical-Piping Supervisor ·Technical Contracting Company

Saudi Arabia

Bachelor's degree, Mechatronic and Mechanical Engineering

Work experience

Total years of experience: 25 years, 1 months

QA/QC Mechanical-Piping Supervisor

May 2013 - Present

Technical Contracting Company

Jubail, Saudi Arabia

May 2013 - Present

1. Developed and implement internal Quality Control Plans (QCP), Quality Work Procedures, Inspection and Test Plan (ITP), including customer- and project-specific QCPs.
2. Participated in design reviews and criticality assessments of processes as input to QCP development and Hydro test Packages.
3. Developed, implemented and maintained procedures for inspections and testing in compliance with the Quality Management System (QMS)for the satisfaction of our client.
4. Ensured compliance with internal and external management systems.
5. Contributed to Quality Improvement Plans internally, raising proactive notifications to avoid non-conformance in the process.
6. Strong ability to conduct inspections of all installed equipment based on the general plant layout and arrangement.
7. Strong ability to conduct inspections based on the engineering design and standard specifications.
8. Ability to read and interpret P&ID and isometric drawing of process piping.
9. Conducted inspection based on the quality standard and specifications.
10. Conducted walk down process and Pre-start up safety review (PSSR).
11. Generated reports based on a master punch list and punch items.
12. Strong ability to perform piping materials inspections based on material list, specification and Standards. ASME API, ANSI, ASTM.
13. Performed for the monitoring of schedules for the installation, fabrication, construction and erection of piping and mechanical equipment for the status and update of the projects.
14. Strong ability to perform mechanical completion, pre-commissioning and commissioning.
15. The ability to fill-up all documentation related to the pre-commissioning and commissioning process.

Company industry:
Oil & Gas

QA/QC Mechanical-Piping Inspector

November 2010 - January 2013

Madarij Project Development Co. Ltd.

Jubail, Saudi Arabia

November 2010 - January 2013

1. Conducted hydro-testing and commissioning.
2. Issued Punch list that is not match in the standard and As per general drawing.
3. As-built drawing any changes in the line.
4. Coordinated by the Welding inspector any welding joints that are missing in the Daily Welding Report Summary.
5. Conducted piping inspections based on the location drawing (IFC).
6. Coordinated with the welding and piping inspector to raise RFI for the inspection.
7. Coordinated for the third party for NDT activities: MPI, PT, RT.
8. Coordinate the construction in-charge, closing the punchlist
9. Prepared related documents for the Test Package.
10. Reviewed the test package before submitting it to the client.
11. Coordinated by the Engineering Department, any changes in the drawing are based on the current condition of the site.
12. Checked the welding joints on the site based on the welding manager data and weld mapping in spool drawing

Company industry:
Petrochemicals & Refined Petroleum Products Manufacture

Project Mechanical Engineer

January 2009 - November 2010

PTT Engineering & Consultants PTE. LTD

Cebu City, Philippines

January 2009 - November 2010

1. Supervised and coordinate the construction engineer for any engineering concern.
2. Monitored the status of the project based on schedule.
3. Received and verifies materials and equipment as per design requirements.
4. Coordinated related site activities regarding work schedules and material issues.
5. Inspects construction work for compliance with drawings, specifications and codes.
6. As-built drawings any deviations from site.
7. Prepared the requisition of material for purchasing.
8. Estimated the quantities and material takeoffs of the field purchases of materials.
9. Monitored installation of materials and equipment to assure conformance with drawings and specifications.
10. Prepared daily progress reports and keeps superiors informed on progress of assigned tasks.
11. Reviewed project design and engineering documents.

Company industry:
Maritime & Marine Engineering

Mechanical Engineer

February 2001 - January 2009

Taiyo Yuden (Phils.), Incorporated

Cebu City, Philippines

February 2001 - January 2009

c1. Conducted training and awareness regarding the Preventive Maintenance Working Standard (PMWS) and Equipment Control Standard (ECS) for all rotating equipment.
2. Trained and educate the process operator regarding the ISO standard and other related documents.
3. Analyzed machine and equipment problems that will not compromise the quality of product during the production.
4. Performed Measuring Systems Analysis (MSA) and correlated all measuring devices that are used in the production line.
5. Verified the heating profile and checked the standard settings of drying machines,
6. Confirmed the modification of existing electronic and programmable controlled equipment based on its standards settings and procedures.
7. Designed a pokayoke (countermeasure) of the equipment to minimize the non-conformity during the production process.
8. Designed a part of the machine for safety and increase efficiency.
9. Designed machine apparatus from manual to automatic
10. Appraised the condition of technicians based on their performance.
11. Carried out inspections regarding the Preventive / Predictive Maintenance Activities
12. Carried out visual checking of vacuum pressure;
13. Supervised the replacement of equipment parts to ensure the correct specifications.
14. Raised corrective and preventive action to avoid recurrence of non-conformity.

Company industry:
Manufacturing

Education

CEBU INSTITUTE OF TECHNOLOGY UNIVERSITY

May 1999

May 1999

Bachelor's degree, Mechatronic and Mechanical Engineering

Philippines

Degree in Bachelor of Science in Mechanical Engineering
View attachment

Cebu Institute of Technology University (C.I.T.U.)

May 1999

May 1999

Bachelor's degree, Bachelor of Mechanical Engineering

Philippines

Santos City National High School (GSCNHS) GS City Phils.

March 1994

March 1994

High school or equivalent, High School General

Philippines

Cahilsot Central Elementary School. (HNCCES)

March 1990

March 1990

High school or equivalent, Graduated

Philippines

Skills

Project Management
Expert
Project Management
Expert
PowerPlant
Expert
PowerPlant
Expert
Design Engineering
Expert
Design Engineering
Expert
Quality Control
Expert
Quality Control
Expert
QA QC Engineering
Expert
QA QC Engineering
Expert
 Flexible
Expert
 Flexible
Expert
FABRICATION
Expert
FABRICATION
Expert
PREVENTIVE ACTION
Expert
PREVENTIVE ACTION
Expert
SYSTEMS ENGINEERING
Expert
SYSTEMS ENGINEERING
Expert
PREVENTIVE MAINTENANCE
Expert
PREVENTIVE MAINTENANCE
Expert
CONSTRUCTION
Expert
CONSTRUCTION
Expert
PREDICTIVE MAINTENANCE
Expert
PREDICTIVE MAINTENANCE
Expert
SYSTEMS ANALYSIS
Expert
SYSTEMS ANALYSIS
Expert
COMMISSIONING
Expert
COMMISSIONING
Expert
NON-DESTRUCTIVE TESTING (NDT)
Expert
NON-DESTRUCTIVE TESTING (NDT)
Expert
 The ability to use Microsoft Office (Project, Excel, Word, Power point and Outlook)
Expert
 The ability to use Microsoft Office (Project, Excel, Word, Power point and Outlook)
Expert
 The ability to control and monitor the work environment
Expert
 The ability to control and monitor the work environment
Expert
 Computer design and modeling (Elite Pressure vessel design, Quad log Safety PLC, Auto Cad 2D/3D mo
Expert
 Computer design and modeling (Elite Pressure vessel design, Quad log Safety PLC, Auto Cad 2D/3D mo
Expert
 The ability to conduct inspection to satisfy international standards and client specifications
Expert
 The ability to conduct inspection to satisfy international standards and client specifications
Expert
 Able to build relationships
Expert
 Able to build relationships
Expert
 Able to analyze and troubleshoot the mal-functionality of equipment
Expert
 Able to analyze and troubleshoot the mal-functionality of equipment
Expert
 Able to stand under pressure
Expert
 Able to stand under pressure
Expert
 Loyal and Discreet (maintain confidentiality)
Expert
 Loyal and Discreet (maintain confidentiality)
Expert
 Time Management
Expert
 Time Management
Expert
Project Management
Expert
Project Management
Expert
PowerPlant
Expert
PowerPlant
Expert
Design Engineering
Expert
Design Engineering
Expert
Quality Control
Expert
Quality Control
Expert
QA QC Engineering
Expert
QA QC Engineering
Expert

Languages

English
Expert