Total Years of Experience: 10 Years, 11 Months
November 2017
To Present
Electrical engineer
at AL WAJEN Electrical & Sanitary Contg
Location :
India
Roles & Responsibility:
* Carrying out new project works, design and installation
* Carrying out electrical installation and maintenance work
* Knowledge in erection of MDB, Capacitor bank, SMDB and sub DB’s
* Preparing load schedule as per UAE standards
* Handled electrical erection from 100 KVA to 1200 KVA
* Knowledge of selecting MCB, ELCB, MCCB, Isolator as per UAE
standard with connected load details
* Knowledge of cable selection from 4 core 16 sq.mm to 300 sq.mm
and
* single core cables as per FEWA regulation
* Strong knowledge of reading the drawings and schematic diagrams
* Creating load balanced circuits and selection of different wires for
connected loads such as 2.5, 4.0, 6.0 sq.mm in sub DB’s
* Knowledge of conducting earth insulation resistance test
* Creating load cards for multiple projects for FEWA
inspection and made project successful
* Handling some fit out projects by adding additional loads with
existing
* load by considering the load balance
* Knowledge in routing of cable based on the building structure
* Manpower management for different site and making schedule
for site work
* Maintain daily site report and handling material movement
* Ability to read and interpret wiring diagrams and floor plans
* Able to communicate effectively at all levels and willing to learn new
* skills
* Proficient in electrical code
* Knowledge of HSE rules and regulation for working standards
* Carrying out new project works, design and installation
* Carrying out electrical installation and maintenance work
* Knowledge in erection of MDB, Capacitor bank, SMDB and sub DB’s
* Preparing load schedule as per UAE standards
* Handled electrical erection from 100 KVA to 1200 KVA
* Knowledge of selecting MCB, ELCB, MCCB, Isolator as per UAE
standard with connected load details
* Knowledge of cable selection from 4 core 16 sq.mm to 300 sq.mm
and
* single core cables as per FEWA regulation
* Strong knowledge of reading the drawings and schematic diagrams
* Creating load balanced circuits and selection of different wires for
connected loads such as 2.5, 4.0, 6.0 sq.mm in sub DB’s
* Knowledge of conducting earth insulation resistance test
* Creating load cards for multiple projects for FEWA
inspection and made project successful
* Handling some fit out projects by adding additional loads with
existing
* load by considering the load balance
* Knowledge in routing of cable based on the building structure
* Manpower management for different site and making schedule
for site work
* Maintain daily site report and handling material movement
* Ability to read and interpret wiring diagrams and floor plans
* Able to communicate effectively at all levels and willing to learn new
* skills
* Proficient in electrical code
* Knowledge of HSE rules and regulation for working standards
December 2015
To March 2017
Facilities coordinator
at CBRE South Asia Pvt. Ltd
Location :
India
Preparation of MMR(Monthly Maintenance Report)
* Vendor management
* Cost saving technique
* Segregating Planned Preventive Maintenance (PPM) for different team
such as Electrical, HVAC, BMS etc..
* Handling issue stationery, Processing Identity cards & access cards
* Maintaining access card inventory report and access card reconciliation
report
* Escalating and resolving client issues through remedy tool
* Periodically review-Vendors, management committee
* Preparing cost sheet for stock management
* UPS reading-taken to find out the load percentage
Topics covered under Vendor management:
• Scheduling AMC visit for different types of machines include Chiller plant, Transformer, Dynamic
generator
• Maintaining the report of periodic frequency maintenance for Elevators and escalators available in
the site
• Arranging vendor for STP cleaning periodically in the site as per the schedule (for every quarter of
the year)
• Arranging vendor for interior damage and panel damage if arise in the site
Work support given to organization for the assigned secondary site:
• Collecting snag list documents for the site if needed
• Assigning sub contract work by comparing minimal quote if needed for correcting snag points
• Knowledge of doing pre and post inspection of subcontractors work as per the quotation on
Behalf of landlord
• Implementing proper manpower for subcontract work
* Vendor management
* Cost saving technique
* Segregating Planned Preventive Maintenance (PPM) for different team
such as Electrical, HVAC, BMS etc..
* Handling issue stationery, Processing Identity cards & access cards
* Maintaining access card inventory report and access card reconciliation
report
* Escalating and resolving client issues through remedy tool
* Periodically review-Vendors, management committee
* Preparing cost sheet for stock management
* UPS reading-taken to find out the load percentage
Topics covered under Vendor management:
• Scheduling AMC visit for different types of machines include Chiller plant, Transformer, Dynamic
generator
• Maintaining the report of periodic frequency maintenance for Elevators and escalators available in
the site
• Arranging vendor for STP cleaning periodically in the site as per the schedule (for every quarter of
the year)
• Arranging vendor for interior damage and panel damage if arise in the site
Work support given to organization for the assigned secondary site:
• Collecting snag list documents for the site if needed
• Assigning sub contract work by comparing minimal quote if needed for correcting snag points
• Knowledge of doing pre and post inspection of subcontractors work as per the quotation on
Behalf of landlord
• Implementing proper manpower for subcontract work
June 2012
To August 2015
Electrical engineer
at Hofincons infotech & Industrial services Pvt. Ltd
Location :
India
Electrical Maintenance of Substation in the site
* Knowledge of segregating power DB, Light DB, UPS DB
* Handling Changeover panel based on the power supply available
* Handled 600 KVA UPS in the site and its maintenance
* Knowledge in handling 725 KVA DG and conducting A-check & B-check etc.
* Electrical reading report-every one hour reading is taken to find out what is the consumption
* UPS reading-taken to find out the load percentage
* Knowledge of segregating power DB, Light DB, UPS DB
* Handling Changeover panel based on the power supply available
* Handled 600 KVA UPS in the site and its maintenance
* Knowledge in handling 725 KVA DG and conducting A-check & B-check etc.
* Electrical reading report-every one hour reading is taken to find out what is the consumption
* UPS reading-taken to find out the load percentage
at ANNA UNIVERSITY
Location :
India
Modelling of transformer differential protection & fault rectification using
PLC & SCADA - April, 2012.
It is a new approach for transformer fault checking that ensures security for external faults and
over excitation temperature conditions and provide dependability for internal faults by
using PLC & SCADA. It is presented to the “
PLC & SCADA - April, 2012.
It is a new approach for transformer fault checking that ensures security for external faults and
over excitation temperature conditions and provide dependability for internal faults by
using PLC & SCADA. It is presented to the “
Share on Facebook
Share on Twitter
Share Via Email