rammer arroyo, Civil & Structural &Architectural Inspection Engineer

rammer arroyo

Civil & Structural &Architectural Inspection Engineer

BECHTEL / APPLUS VELOSI CERTIFICATION LCC

البلد
الفلبين
التعليم
دبلوم, BS Architecture
الخبرات
20 years, 5 أشهر

مشاركة سيرتي الذاتية

حظر المستخدم


الخبرة العملية

مجموع سنوات الخبرة :20 years, 5 أشهر

Civil & Structural &Architectural Inspection Engineer في BECHTEL / APPLUS VELOSI CERTIFICATION LCC
  • قطر - الدوحة
  • يونيو 2013 إلى مايو 2014

Project Handled
•NDIA - New Doha International, CP65 Airline Operations Facility HAMAD INTERNATIONAL AIRPORT - DOHA, QATAR - http://www.ndiaproject.com/

Job Duties /Achievement
Third Party Consultant under supervision of OBI required by NDIA as QA/QC Inspection Engineer for CP65, CP75 and performed the following task:
• Site supervision and verification as per approved plans and
inspection test plan.
• Issuing and closing of surveillance report as Quality Action
Notification (QAN).
• Plans review to verify clashes of different discipline.
• Material inspection as per approved and delivery at the site.
• Reporting daily accomplishment
• Initial joint inspection prior to substantial completion.
• Initiating informal walk down as Snag/Punch list indentifying
minor and major works.
• Evaluate and tracking of balance of work from IFC to
Construction Technical Inquires- CTI
• Attend HSE meeting and monitor of site tour/site safety
observation.
*Reason of leaving: End of contract, Partial opening of Qatar
Airways and Airport Terminal.

Senior Architect / ID في Shangri-La Property Developer Inc
  • الفلبين
  • فبراير 2013 إلى يوليو 2013

Project Handled
• SSP- Shang Salcedo Places - 67th Floor Condominium
Residence Building
Sen. Gil Puyat Ave., Cor.Tordesillas st., Salcedo Village
Makati City, Philippines.
http://www.shangsalcedoplace.com/index.html

Job Duties /Achievement
Architect Coordinator /Management of the SPDI, focal point of the consultants, contractors, and design team, commercial team and performed the following task:
• Initiate presentation meeting on design concept based on the details and guidelines for GFA and CFA of the building prior to design development approval.
• Coordinator to all deliverables drawing and plan from DD, TD, to CD packages to all Consultants.
• Contract review and arranged the schedule of Designer and Consultants deliverables schedule for Technical Report, Calculation, Technical Specification, and Sets Plans & Sheets as per set dates prior for bidding per packages from DD, TD to CD.
• Initiate workshop review according to guidelines and verify clashes of every discipline with consultants and designers.
• BOQ Review and checking of materials to guidelines and specification for VE proposal.
• Reply queries during bid tender, bidding process, pre-qualification and final bid qualification.
• Initiate workshop and review on the project master schedule coordinate to all discipline contractor including total quality management plan and safety requirement plan activities.
• Coordinate requirement regulation to all agencies for permits documents.
• Review and verify Materials as submittal from contractor with consultants.
• Conduct construction meeting with contractor to resolved technical construction.
• Tracking down and compliance checking from current to latest plans due to revision from client and coordinate to contractor to verify the conflict to avoid clashes at site.
*Reason of leaving: After all the packages are awarded to contractors, I moved to seek for better career advancement opportunities and effective exposure.

Fit-out Manager في JAFFER BROS - Murshid Builder Pvt. Limited
  • أفغانستان
  • مايو 2012 إلى ديسمبر 2012

Project Handled
• CONTRACT NUMBER: W5J9JE-11-C-0043, ANA 215th Brigade Garrison Phase I, Camp Garmsir, Helmand Province, Afghanistan, Department of the Army, Afghanistan Engineer District - South Camp Dwyer, USA Corps of Engineering - USACE APO AE 09373
Job Duties /Achievement
Manage Interior Fit-Out Works of Military Facilities - Brigade Garrison Phase 1 and task are:
• Plan review of all trades and disciplines according to scope of work, specification and USACE guidelines.
• Arranged Construction Program of the manpower, materials & equipments, facilities, fabrication shops in reference to construction schedule of 1st, 2nd, 3rd fix, test commissioning and turnover party to the end user.
• Formulate cost value in percentage to monitor the weekly accomplishment per 2nd and 4th weeks look ahead projected and monitor the invoice collection the remaining balance from the project contract amount of fit out work schedule tie-up to master construction schedule.
• Review of submittals and provide material log registry to submit sample, brochure/catalogs, cut sheets, certificate product and test results report in reference to guidelines and specifications tie-up to master schedule.
• Submit RFP and RFQ for drawings and materials are not clear to the specification and scope of work conflict to the requirement of OSHA, UFGC, IBC, EN, IBC, NFPA and maintenance guidelines to the end user.
• Prepare daily meetings to discuss the accomplishment daily, issues at site, materials / equipment needed manpower load and supply for 2 - 4 weeks.
• Submit as-built as red lines according to the RFP and RFQ replies.
• Attend construction and presentation meeting to the client -USACE the method of statement of execution and construction schedule accomplishment achievement.
• Site supervision during excavation, embedment layout of the building and works, civil & structural works of K-SPAN until architectural finishing works including trial mix of concrete cement, rebar tensile test and cylinder compression test
*Reason of leaving: Security issue and Risky location and completed up to 80% of the project

Site Architect في BYA INTERNATIONAL
  • الولايات المتحدة
  • مايو 2010 إلى يناير 2012

Project Handled
• CONTRACT NUMBER: W5J9JE-10-C-0010, ANA Garrison Support Battalion Camp Thunder, Gardez, Paktya Province, Afghanistan, Department of the Army, Afghanistan Engineer District - North, FOB Lightning, USA Corps of Engineering - USACE APO AE 09320
Job Duties /Achievement
Coordinator to design team based in the field to review and supervised the design / built construction of Military Base as Garrison Battalion Camp:
• Plan review of all disciplines according to scope of work, specification and USACE guidelines.
• Review and assist the Designer Consultant from conceptual design to design submittal drawings of 35%, 65%, 99% and 100%, specifications, design calculation according to actual site condition of Vicinity & Utility Master Plan prior to submit to QAALA House - USACE, Kabul, North District.
• Review of submittals and provide material log registry to submit sample & mock-up, brochure/catalogs, cut sheets, certificate product and test results report in reference to guidelines and specifications tie-up to master schedule.
• Submit RFP and RFQ for drawings and materials are not clear to the specification and scope of work conflict to the requirement of OSHA, UFGC, IBC, EN, IBC, NFPA and maintenance guidelines to the end user.
• Assist bid conference concerning technical issues; prepare drawings for binding and electronic drawings for biddings.
• Submit RFP& RPQ for alternative proposed material according to the availability in the area but compliance as per specification.
• Review method of statement and calculation as corrective procedure due to conflict to plan and actual site condition.
• Site supervision during excavation, embedment layout of the vicinity utilities & building, works, civil & structural works until architectural finishing works including trial mix of concrete cement, rebar tensile test, cylinder compression test and assembly of PEB structures & sandwich panels.
*Reason of leaving: Design Stage Completed from 35%, 66% to 100% including Site Supervision until Project is operational.

Engineering Coordinator في DDT Konstruct Inc
  • الفلبين
  • مارس 2010 إلى مايو 2010

Project Handled
• LIGHT RESIDENCES (48 Storeys - Commercial Shopping Malls with Parking, Amenity & Residences High End) SM DEVELOPMENT CORPORATION INC. Edsa, Boni, Mandaluyong City, Philippines - http://www.smlightresidences.com/

Job Duties /Achievement
Worked as Engineering head that lead engineering department to support construction team:
• Review plans and BOQ to verify variation from TD to CD, bid bulletin, due to incremental cost quantity from bid qualification and from provisional to fix lump sum.
• Segregation of common materials to specialty items for market availability.
• Review FCD and identify clashes of every discipline for RFI and RFQ to updated CSD and redline.
• Prepare material log registry for sample, brochure/catalogs, cut sheets, test results tie-up to construction schedule.
• Lead to the engineering team to assist the operation group by giving inputs according to the latest plans and instruction from the client.
• Review and assist site supervision in establishing layout and mock-up samples at site such as structural foundation, footings, trial mixed of concrete cement, rebar tensile test, full out of rebar coupler test, cylinder compression test and precast modules of the wall.
*Reason for Leaving - After assist engineering department in the issue of contract from detailing of BOQ and commercial aspect were completed, I moved to seek for better career advancement opportunities and effective exposure.

Senior Project Architect في Rchitects Inc
  • الفلبين
  • يناير 2009 إلى مارس 2010

Project Handled
• Bellevue Hotel Resort, Panglao, Bohol Island, Philippines
http://www.thebellevue.com/bohol/

Job Duties /Achievement
Assigned to project management department and handle project from *DD, *TD to *CD including conceptual design:
• Develop the concept design scheme and design details as described to the hotel guidelines and theme concept.
• Arrange workshop meeting with MEP consultant to identify and give solutions the clashes of discipline, and design intent suitable to the environment, the equipment to use, specification, standard materials coordinated to guidelines.
• Review and provide maintenance and emergency access and privacy requirement and update details according to the contract packages, CSD plans of each discipline as per guidelines.
• Lead of checking and issuing bid bulletins, construction bulletins, architect instructions and other instructions in related to the tender packages, agreed in the meeting and instruction of the Owner.
• Conduct meetings to discuss updates and resolve clashes with other consultants and contractor.
• Assist where plans finalized thru schedule deliverables and deadlines.
• Supervised with structural consultant, the boring test, cement test (for sulfate resistance cement - type 2) the trial mixed, steel rebar tensile test according to grade, seismic calculation strength requirement due to location.
• Assist the Opening of Shangri-La, Boracay Resort and Spa
*Reason for Leaving - After the projects are completely done the plans from design development, tender drawings to CD Plans and award to the contractor, I leave for better career advancement opportunities and effective exposure. Project Status - Bellevue Resort Hotel now operational.

Project Arch 2 (Res. Architect) في Recio + Casas Architects
  • الفلبين
  • يونيو 2008 إلى يناير 2009

Project Handled
• Shangri-La Boracay Hotel Resort and Spa - Brgy. Yapak, Boracay Island, Malay, Aklan, Philippines - http://www.shangri-la.com/boracay/boracayresort/

Job Duties /Achievement
Assigned to work with Project Management Team of Shangri-La Group as Resident Architect to assist at site and contractors:
• Supervision at construction site, identifying grey areas not shown in the plans, and provide details update to incorporate in the new revision plan as *A.I. and *S.I.
• Review of construction drawing and plans parallel to implementation site and verify differences or discrepancy of structural, to coordinate architectural and MEP discipline.
• Review and approval of material submittals, shop drawings, fabrication drawings, method statement proposal and *RFI’s from contractors.
• Revised design interior intent arrangement and *FF&E design intent per Client instructions.
• Attend construction meetings to discuss and settle design issue, conflict, construction issues, and submittals, commercial issues to discuss and resolve with the consultants and client.
• Provide and resolve design detail of Privacy guidelines occurred during soft opening.
• Provide missing details which are not shown in plans that requires in project as client instructed.
• Provide inspection schedule from level 1 to level 4, informal to final walk down prior for turn-over to the client from simulation to official opening.
*Project Status - The Project is now operational after fully completed the two Principal Architect separate and I went to Architect Jose Pedro Recio - RCHITECTS Inc.

Site Architectural Engineer في ECC International, LLC
  • الولايات المتحدة
  • أبريل 2007 إلى أبريل 2008

Project Handled
• Contract No. FA8903-06-D-8511 -Task Order # - 10, Construction and Renovation of 76 Buildings & Utilities at Forward On Base Ali, Defender and Phoenix, Camp AR Ramadi, Al Anbar, Iraq Department of Air Force, AFCEE, Iraq Western Region District US Air force of Engineering, USAF APO AE 09362

Job Duties /Achievement
Assigned to work at site to oversee the construction work, assist the review with independent designer and assist the HQ - USACE from bidding until turn-over:
• Review and support Military & Federal government bids and proposal for engineering and design & build.
• Provide and prepare conceptualize engineering designs, assist preparation plans and review maintenance program of facility and infrastructure backbone.
• Lead the review with 3rd party A/E firm institute designer as independent review.
• Prepare *RFQ of design and construction services and recommendations according to guidelines, Federal requirement and specification.
• Review design proposal, calculations, lab data, samples, manufacturer’s data and submittals materials.
• Provide corrective actions and works based on the actual conditions.
• Provide daily and weekly update report with percentage value per accomplishment to the project scheduler.
• Site supervision/ execution at site from excavation, civil works, structural, architectural in related to MEP combined services plans and details. Until completion.
• Provide recovery schedule with distribution load, material delivery schedule and equipment.
*Reason of Leaving - Risky and end of the Contract and the project is now operational.

Architectural Supervisor في Makati Development Corporation
  • الفلبين
  • سبتمبر 2005 إلى أبريل 2007

• SERENDRA TWO, DISTRICT 2, PHASE 2A, SEC B & C, Community Innovation Inc, AYALA LAND INC., Global, Fort Bonifacio, Taguig City, M .Manila, Philippines - http://www.global-city-properties.com/two-serendra.html#.UkHQuYaw2So

Job Duties /Achievement
Assigned to Lead the Engineering team to support and assist the Operation team from start to completion of the project.
• Review plans and BOQ to verify variation from TD to CD, bid bulletin, due to incremental cost quantity from bid qualification and from provisional to fix lump sum.
• Segregation of common materials to specialty items for market availability.
• Review FCD and identify clashes of every discipline for RFI and RFQ to updated CSD and redline.
• Prepare material log registry for sample, brochure/catalogs, cut sheets, test results tie-up to construction schedule.
• Lead to the engineering team to assist the operation group by giving inputs according to the latest plans and instruction from the client.
• Review and assist site supervision in establishing layout and mock-up samples at site such as structural foundation, footings, trial mixed of concrete cement, rebar tensile test, full out of rebar coupler test, cylinder compression test and precast modules of the wall.
• Resolving clashes and conflict of construction issues, commercial issues and resolving with designer and maintenance department with the client during PTG meetings.
• Assist Client NSC coordinated to construction schedule of the project.
* Reason of Leaving: End of the Contract.

Architectural Coordinator في GF and Partners
  • الفلبين
  • يوليو 2005 إلى سبتمبر 2005

Project Handled
• TRI-NOMA SHOPPING MALL, AYALA INC -North Triangle, North Edsa, Quezon City, Philippines
www.trinoma mall.com (Click the images)

Job Duties /Achievement
Perform as Architectural Coordinator to other consultant, designer, supplier, contractor and owner.
• Review CD plans before issue to contractor
• Arrange workshop meeting with MEP consultant to identify and give solutions the clashes of discipline, and design intent, equipment to use, specification, standard materials coordinated to specification and guidelines of the mall.
• Resolving clashes and conflict of construction issues, commercial issues and resolving with designer and maintenance department with the client during PTG meetings.
• Review and assist site supervision in establishing layout and mock-up samples at site such as structural foundation, footings, trial mixed of concrete cement, rebar tensile test, full out of rebar coupler test, cylinder compression test and precast modules of the wall in related to MEP works and CSD plans and details.
• Assist to the Associate Architect of evaluating submittals, materials sample and equipments.
*Reason for Leaving - After the designs are resolved with coordination to other discipline (Consultant) trades, suppliers and award to the contractors, After 3 months contract I leave to seek for better career advancement opportunities and effective exposure.

Architectural Supervisor - Engineering في EEI CORPORATION
  • الفلبين
  • نوفمبر 2004 إلى يوليو 2005

Project Handled
• SERENDRA ONE, DISTRICT 1 PHASE1, -Residential Building Group, High End Units, AYALA LAND INC., Global, Fort Bonifacio, Taguig City, Metro. Manila, Philippines - http://www.global-city-properties.com/one-serendra.html#.UkHRCoaw2So
Job Duties /Achievement
Recall by EEI to Lead the Engineering team to support and assist the construction team, representative, and management.
• Review plans and BOQ to verify variation from TD to CD, bid bulletin, due to incremental cost quantity from bid qualification and from provisional to fix lump sum.
• Segregation of common materials to specialty items for market availability.
• Review FCD and identify clashes of every discipline for RFI and RFQ to updated CSD and redline.
• Prepare material log registry for sample, brochure/catalogs, cut sheets, test results tie-up to construction schedule.
• Lead to the engineering team to assist the operation group by giving inputs according to the latest plans and instruction from the client.
• Review and assist site supervision in establishing layout and mock-up samples at site such as structural foundation, footings, trial mixed of concrete cement, rebar tensile test, full out of rebar coupler test, cylinder compression test and precast modules of the wall and seismic gap.
• Resolving clashes and conflict of construction issues, commercial issues and resolving with designer and maintenance department with the client during PTG meetings.
• Assist Client NSC coordinated to construction schedule of the project.
*Recall by EEI to work with the client, consultants and construction management group and project status are now operational (commercial areas) & (residential units) and end of contract

Site Engineer - Inspector في Shell Petroleum Corporation
  • الفلبين
  • سبتمبر 2002 إلى سبتمبر 2004

Project Handled
• Automation Gas Project - (pipe racks & loading gantry), Renovation of Fencing, Drainage System & Driveway Re-concreting, Shell Pandacan Installation (Depot) Manila, Philippines
• Maintenance of Commercial and Retail Gasoline Station - Region- 4 Areas (Batangas, Occ & Oriental Mindoro, Laguna, Rizal, Cavite & Palawan)Philippines
• New Construction & Renovation of Commercial and Retail Gasoline Station North Metro Manila Area, Philippines

Job Duties /Achievement
Recall by Shell management to assist the project and supervise the ongoing construction, renovation and maintenance works of gas station, commercial station, and oil & gas depot.
• Site supervision of new construction, renovation including overhead tank, underground tank and dispenser pump repair gas retail station and oil depot from excavation, civil & structural works including prefabrication steel works to architectural, mechanical and electrical
• Scoping of renovation and reconstruction with cost estimate material and scope of works
• Review and evaluate progress billing, reconcile change order billing.
• Monitor construction schedule showing the projected, actual done and the critical path according to the site condition.
• Review and monitor safety procedure, job hazard analysis report and work permit system.
• Supervised oil spill recovery and soil remediation recovery and procedures.
• Review the construction and operating procedure submitted by the contractors.
• Review QA/QC report, procedure and documentation of contractor as part of TQM standard.
• Initiate workshop meeting to resolve issues occurred at site with engineering and management.
• Initiate and assist inspection of informal and final walk down punch list before opening.
• Assist and follow-up all permits from Authority from construction until opening.
Recall by Shell to work with contractor as management, inspector and evaluator and project status -All gasoline stations are operational and end of contract.

QA / QC Supervisor في ABB - ASEA BROWN BOVERI
  • الفلبين
  • يناير 2002 إلى سبتمبر 2002

Project Handled
• National Control Center, National Power Corporation Grid (Napocor)-Transco - Quezon City, Metro, Manila, Philippines (Design and Built Project)

Job Duties /Achievement
Work in an infrastructure government project under the design and built contract and performed as QA/QC supervisor including engineering works and site supervisions.
• Material testing coordinator and documentation for concrete trial mixed test, tensile test, compaction test, pressure test, and full out test
• Checking of material upon arrival and delivery.
• Review material quantity prior for delivery
• Assist Engineering team to provide missing details for submittals
• Site supervision of the following - civil work, structural, architectural in related to MEP combined services plans and details.
• Provide schedule for informal, final walk down inspection and punch listing with the end user.
• Assist and supervise interior fit outs and FF& E works.
*Reason of leaving: End of contract, past track project and now operational

Architectural Supervisor (Field Arch) في EEI CORPORATION
  • الفلبين
  • يوليو 1998 إلى أكتوبر 2001

Project Handled
• MRT - 3 EDSA Metro Rail Transit Project - Edsa Hi-way, Metro Manila, Philippines
http://dotcmrt3.weebly.com/background--construction.html
• Robinson Residence Place (Twin Tower) - Ermita, Manila, Philippines
http://www.robinsonsresidences.net/rpr/index.html
• Philam Life Building Tower -(Skycraper Building )Paseo De Roxas, Makati City, Philippines
https://www.youtube.com/watch?v=exhPq6e6Qa8
• Pacific Plaza Building Tower - Fort Bonifacio, Global City, Taguig City, Philippines
http://en.wikipedia.org/wiki/Pacific_Plaza_Towers
• Ionics Semi-Conductor Plant - LSP- 2, Real, Calamba, Laguna, Philippines
• Philips Extension - Semi - Conductor Plant LSP- 1, Cabuyao, Laguna, Philippines
• Philips - Semi Conductor Plant - LISP-2, Real, Calamba, Laguna, Philippines
http://www.philips.com.ph/about/company/local/sustainability/index.page

Job Duties /Achievement
Work to Lead the Engineering team to support and assist the construction team, as representative, management and supervision.
• Assist and check the review of plans *TD to *CD, grey areas not in the *BOQ prior to claims
• *BOQ review if include the bid bulletin, post bid, incremental quantity from previous bid qualification and instruction from provisional fix lump sum.
• Segregation of materials from common to special items, available in the area or to be import.
• Review the *FCD plans between Architectural, Structural, Civil Works and MEP to verify conflict in the *CSD plans, and identify the clashes of other discipline for *RFI.
• Prepare material log registry schedule to submit sample, brochure/catalogs, cut sheets, certifications, test results report tie-up to construction schedule.
• Assist to prepare material submittal, shop drawing proposal, material samples, and mock up sample for consultant and client approval.
• Supervise the implementation of civil & structural works and architectural works in related to MEP works and combined services plans & details.
• Attend *PTG meetings to clarify design issue, grey areas, RFI issues, construction issues, submittals, commercial issues to discuss and resolve with the consultants, designers, client.
• Lead team for review, clarification of contract in the technical aspect, bid contract, and assist commercial and operation department.
*Project Status -End of contract and all the Projects are now operational.

Site Engineer - Inspector في Shell Petroleum Corporation
  • الفلبين
  • يونيو 1997 إلى يوليو 1998

Project Handled
• Gasoline Station - New construction - North Luzon (Region 1 & 2) Philippines
https://www.google.com/search?q=shell+gas+station+philippines&tbm=isch&tbo=u&source=univ&sa=X&ei=7BM4UrfVBqyN7AaooICgCA&ved=0CK8BELAE&biw=1600&bih=809&dpr=1

Job Duties /Achievement
Performed to work as Management to the project and supervise at site of new construction of gas station.
• Site supervision of new construction of gasoline station and dispenser pump from excavation, civil & structural works including prefabrication steel works to architectural, mechanical and electrical
• Scoping of new construction with cost estimate material and scope of works
• Review and evaluate progress billing, reconcile change order billing.
• Monitor construction schedule showing the projected, actual done and the critical path according to the site condition.
• Review and monitor safety procedure, job hazard analysis report and work permit system.
• Supervised oil spill recovery and soil remediation recovery and procedures.
• Review maintenance and manual operating procedure submitted by the contractors.
• Review QA/QC report procedure and documentation from contractor as part of progress billing.
• Initiate workshop meeting to resolve issues occurred at site with engineering and management.
• Initiate and assist inspection of informal and final walk down punch list before opening.
• Assist soft opening to final standard operation.
*Reason of leaving - End of contract and all Gasoline Station retail and commercial are Operational

Draftman / Designer في Arch Edward G. Sy and Associates
  • الفلبين
  • مايو 1993 إلى يونيو 1997

JOB FUNCTIONS / RESPONSIBILITIES
- Architectural designer including Interior and Renovation.
- Draftsman Detailer of Architectural, Structural, Plumbing/Sanitary and Mechanical.

الخلفية التعليمية

دبلوم, BS Architecture
  • في Balangobong Elementary School
  • يوليو 1993

Project and Construction Management, Architectural Design/Details&Interior, Schedule and Planning, Combined Services Drawings - Consolidated Plans, QA/QC Documentation and Inspection

Specialties & Skills

Design Review
Scheduling
Engineering Support
Engineering Design
Management
ARCHITECTURAL
AUTO CAD
CONSTRUCTION SCHEDULE
DOCUMENTATION
DRAWING
FABRICATION
FIRE PROTECTION
INSPECTIONS
PLUMBING
QUALITY ASSURANCE
construction
Designing and Detailing

اللغات

التاغلوج
متمرّس
الانجليزية
متمرّس
العربية
متوسط

التدريب و الشهادات

Post Installed Anchor and Passive Fire Protection -Technology Seminar (تدريب)
معهد التدريب:
HILTI & MDC - Site Office, Two Serendra Project,Fort Bonifacio, Global, Taguig City, PhilIppines
تاريخ الدورة:
March 2006
المدة:
40 ساعة
LEED Green Associate Seminar (تدريب)
معهد التدريب:
GREEN ENGINEERED TRAINING CENTER - Merweb Hotel, Alsaad, Doha, Qatar
تاريخ الدورة:
September 2013
المدة:
48 ساعة
HILTI DRILLING & DEMOLITION - Products & AMS Seminar (تدريب)
معهد التدريب:
Hilti & MDC - Site Office, Two Serendra Project,Fort Bonifacio, Global, Taguig City, PhilIppines
تاريخ الدورة:
February 2005
المدة:
24 ساعة
AGSI - Authorized Gas Safety Inspection and Authorized Engineers Course for Contractor Safety Off (تدريب)
معهد التدريب:
SHELL PETROLEUM CORPORATION - PILIPINAS - Tunasan, Shelter, Muntinlupa City, Philippines
تاريخ الدورة:
September 2002
المدة:
32 ساعة
CONSTRUCTION SAFETY PROCEDURE, JOB HAZARD AND IMPLEMENTATION (تدريب)
معهد التدريب:
SHELL PETROLEUM CORPORATION - PILIPINAS - University of the Philippines ,Diliman , Quezon City
تاريخ الدورة:
October 1997
المدة:
24 ساعة
STORAGE TANK ENTRY & CLEANING COURSE (تدريب)
معهد التدريب:
SHELL PETROLEUM CORPORATION - Shell House Learning Center,Valero st., Makati City, Phili
تاريخ الدورة:
April 2004
المدة:
40 ساعة
CONSTRUCTION and TOTAL QUALITY MANAGEMENT (تدريب)
معهد التدريب:
EEI CORPORATION - LISP- 2, Philips Semiconductor Building ,Real ,Calamba ,Laguna , Philippines
تاريخ الدورة:
August 1998
المدة:
40 ساعة