• Responsible for smooth functioning and quality of utilities (Cooling and HVAC) in two dairy plant factories.
• Improve the smooth operation and balancing of the Refrigeration unit’s and air conditioning systems.
• To Inspect, test, trouble shoot and install new or modified Ammonia refrigeration systems composed of:
8 HALL Screw Compressors.
4 MYCOM Screw Compressors.
20 Plate Heat Exchangers (PHE). 4 GRASSO Screw Compressors
8 SABROE Reciprocating Compressors.
20 Evaporative Condensers (Baltimore and Karsu).
Complete 6 systems of Glycol. Complete one system of Chilled water.
• In addition to their loads (Processing pasteurizers, PHEs, UHTs, Cooling tunnels and Fresh Storages).
• Perform, repair, operation, maintenance and installation work of air conditioning (A/C and AHUs units).
• Supervise, overseeing and commissioning HVAC installation and prepare projects reports.
• Responsible for successful vertical startup of new projects on site with the factory KPI's.
• Timely implementation of technical projects, including costs and resource management.
• Responsible for submitting, operations, maintenance, and close out process.
• Perform a wide variety of skilled tasks connected with repair and maintenance of buildings and fixtures.
• Excellent communication skills and a proven track record in managing people on a wide range of tasks.
• Excellent knowledge and experience of documentation, standards, guidelines, develop, operate according to SOPs and safety policies.
Projects and improvements activities:
• Upgrading the old chilled water system in dairy plant no.1 with new Ammonia/Glycol system composed of 4 SABROE reciprocating compressors, 2 Karsu evaporative condensers, 2 PHE and Glycol buffer tanks.
• Improvement the old glycol system in dairy plant no.2 with new extension Ammonia/Glycol system composed of 4 MYCOM screw compressors, 2 Karsu evaporative condensers, 2 PHE and Glycol buffer tanks.
• Design, Upgrade the old steel glycol lines networks in the two plants with new modified stainless steel ones.
• Upgrade, Install two new Karsu Evaporative condensers instead of two old Baltimore leakage ones.
• Upgrade/Change 4 old Baltimore evaporative condensers leakage ammonia coils with new ones.
• Supervise, overseeing and commissioning more than 50 split AC package units (HVAC).
• Install, Supervise and commissioning more than 25 Gunter AHUs units (HVAC).