Plant operations executive
Reliance industries ltd
Total years of experience :13 years, 7 Months
Refinery plant operations and commissioning
Utility Various Unit operations
Effluent Treatment plant
DCS- Invensys, PLC-Rockwell panel to operation maintain EED to Cyanide removal system and Fluoride removal system. 123x5 M3/Hr capacities of UF and RO
Chlorination system
DM/CPU/Air system/UF/RO/DAF oil removing system/API/TPI/Chlorinator
Fire Network system
Cooling Tower
Commissioning and Pre commissioning activities
P&ID /ISO/PFD Reviews & corrections
PLC to DCS serial linking, Alarm trip schedule, C&E Review, WET/DRY loop clearance, FAT/SAT
3D Model review ( 30 %, 60% and 90% )
General arrangement Drawings review and rectify in Arena (Appreciated for best suggestion)
PSSR- I & II
HAZOP study
Piping - Loop preparation, Hydro test, Flushing, Pigging, Cardboard blasting, Mechanical clearance, ITP Reviews
Functional knowledge:
Waste water plant Operation includes Primary section including PDO, API/TPI, DAF (O&G removal), CN treatment, Fluoride Treatment, Heavy metal removal system, and secondary section including Biotower and activated sludge process (Aeration tank & Clarifier) and tertiary section consists of Ultra filtration and RO for TSS & TDS removing.
Handling various types of PUMPs, BFP, Blowers, HE, Centrifuge during shift activities, knowledge about PTW. Monitoring dosing system with SOP and Handling chemicals- DOPE, PAC, Chlorine, Lime, DWPE, Lime, H2O2, Acid, Caustic, Ferric chloride, Alum
Safe startup & shut down of various unit during maintenance.
Maintaining equipment’s in safe and healthy condition
Coordination with maintenance crew for routine and non-routine maintenance activities.
Cooling Tower operation includes Chlorination system, Passivation, commissioning.
All sections operational and process parameters close monitoring and reporting.
New idea and technique proposal to minimize operation cost.
Knowledge about KPIs regarding above all treatment program.
Project 1
In Essar Oil Ltd. From April 2012 to August 2013 for Refinery Waste water treatment (ETP) and Desalter Process (Crude Distillation unit) Operation.
Project 2
In IOCL Gujarat Refinery, Baroda from Aug 2013 to February 2014 for CETP (Refinery Waste water treatment plant) Operation.
PLC- ABB PM572 for O&G removal Waste water treatment
Special Task completed at HPCL refinery, Bombay - Adjust Process & Operation parameters in IETP.
Job profile:
Crude Desalter operation and distillation operation.
Achieving KPIs of Crude distillation of Overhead system
Refinery Waste water treatment operation and Monitoring process parameters.
Handling various types of PUMPs, BFP, Blowers, HE, Centrifuge during shift activities, knowledge about PTW. Monitoring dosing system. Safe startup & shut down of various unit during maintenance.
Refinery waste water treatment operation and commissioning.
waste water treatment plant operation of Essar oil ltd
❖ Secondary School Certificate Examination March 2003, GSEB, Gandhinagar (Gujarat) with 58.59% ❖ M.Sc. (Chemistry) Madurai Kamraj University, Ahemdabad
B.SC with chemistry