Ravi Prakash, Senior Engineer

Ravi Prakash

Senior Engineer

Salini Impregilo

Location
India
Education
Master's degree, Project Management
Experience
18 years, 7 Months

Share My Profile

Block User


Work Experience

Total years of experience :18 years, 7 Months

Senior Engineer at Salini Impregilo
  • Qatar - Doha
  • My current job since September 2014

Working for ISG JV for Redline north underground metro project in Doha, Qatar.
Responsible for carrying out complete civil works & architectural finishes for Corniche station, switch box and associated underpasses for Red line metro in Qatar.
Responsible for timely execution of works with required quality standards. Interface during handing over of completed station & ancillary structures to the end operator appointed by Qatar rail. Carrying out snag closure raised by QC and Qatar rail prior to handover. Attended meetings and site walk with client representatives.

Sr. Engineer at Leighton asia
  • India - Delhi
  • September 2013 to September 2014

Was in charge for Tunnel lining, Ventilation slab and all concrete works for Main & Escape tunnel, 29 nos. of Cross passages, Transformer Niche, Emergency Niche, and Vehicle Lay-by areas at Chenani - Nashri Tunnel Project from North Portal up to 4500 m towards South portal.
Execution of Concrete tunnel lining works was done using Euroform gantry shutter from North Portal in Main tunnel and Escape tunnel of Chenani - Nashri Highway tunnel project for 4500 m. (Current longest road tunnel in India), client - NHAI.
Carried out the construction of Control building at Nashri, Ventilation slab structure for 4.5 Km portion of tunnel and Transformer building for power supply.
Ensured installation of sub-soil drainage system with clean filter media & sump pits all along the final lining for draining rock mass water for both main & escape tunnel.
Was responsible for ensuring work was carried out timely and with approved quality standards.

Sr. Engineer at Afcons infrastructure limited
  • India - Mumbai
  • May 2013 to August 2013

 Quantity calculation for various components of 4 laning of Jammu and Udhampur section of NH 1A (Km 15 to Km 67), involving 4 tunnels (2.897 km), 9 bridges, 10 viaducts, client being NHAI.
 Civil works at T3 tunnel face.
 Site measurement as per drawing / specification of contract and billing schedule.
 Site verification of subcontractors’ works carried out and site measurement.
 Preparation of monthly Subcontractor billing for PRW contractors engaged in the construction work.
 Preparation of variations to contract and their estimates.
 Preparation of work orders and maintaining of records.
 Material reconciliation of free issue material with the subcontractors.

Asst. Manager at LANCO INFRATECH LTD. Sikkim
  • India
  • April 2010 to May 2013

LANCO INFRATECH LTD. Sikkim
Asst. Manager (Apr. 2010 onwards)
Reporting to: General Manager; assisted by 15 subordinates.

 Site Incharge for Underground twin surge shaft with a common pool at top and four underground pressure shaft excavations with reinforced concrete lining works of 90 m twin Surge shaft (16 m dia. each) additional charge of power house cavern concreting works from March 2012.
 Executed excavation works of 16 m finished dia. Twin Surge Shaft of 89 m height each in poor Himalayan geology with specified protection works comprising of Shotcrete, rock bolts and steel ribs.
 Carried out reinforcement concrete lining works of surge shaft and completed reinforcement and concreting of Orifice slab for Surge shaft within a month despite of severe hindrances due to monsoon.
 Completed excavation works of 4 nos. 5.4 m finished dia. Pressure shaft of average length 165 m each and handed over site to HM contractor to carryout steel lining works on two fronts.
 Initiated work proposals for contract works and getting approval from project authority so as to initiate the tendering process.
 Invited quotations and scrutinizing the same for selection of best suited contractor / material supplier.
 Handled contractual issues of M/s HCC and carry out site billing of civil works executed by M/s HCC and other petty contractors at Power House Complex.
 Carried out material reconciliation for free issue material issued by client on monthly basis.
 Represented Power House site during Audit visits and handling the same.
 Maintained all technical documents and documents related to contract award, billing, reconciliation concerned with Lot IV work package.
 Working as Nodal officer for implementing Integrated Management System for ISO 9001 from site.
 Coordinated hydro mechanical works carried out by contractor PES with civil contractor M/s HCC.
 Optimize inventory of construction material at site

Senior Engineer-Civil at East Sikkim as Site Incharge
  • India
  • April 2009 to April 2010

Senior Engineer-Civil (April 2009 - April 2010)

 Supervised Teesta River Stage - VI (500 MW), H.E. Project. Majhitar, East Sikkim as Site Incharge for Underground excavation works of Surge shaft & Pressure Shaft at Power House location, concrete lining work;
 Handled billing & contract management of project contractors HCC, Bumi.
 Managed technical / drawing related communication between Head Office and Site Office; interacted with Executive Director, Project, as Senior Engineer (Technical).
 Successfully completed Pressure shaft excavation works prior to appointment of Hydro Mechanical contractor.
 Completed Twin surge shaft excavation in weak Himalayan geology without any major obstacle and made site ready for carrying out concreting works.
 Initiated quality checks and documentation at site and ensured submission prior to billing so as to execute better control over subcontractor billing.

∼ Was selected by NTPC Ltd. a Navratna Government Enterprise, as a Senior Assistant Engineer in year 2010.

Project Engineer at LANCO ENERGY PVT. LTD. Sikkim
  • India
  • October 2006 to March 2009

LANCO ENERGY PVT. LTD. Sikkim
Project Engineer (Oct. 2006 to Mar. 2009)
Reported to: Chief Operating Officer; assisted by 9 subordinates.

 Site in-charge for Power House exploratory works at Teesta Stage - VI (500 MW), H.E. Project, Sikkim.
 Associated with project since inception.
 Carried out exploratory excavation works before start of project at Pamphok, South Sikkim at proposed project location
 Carried out construction of 10 MT magazine house at Power house location in absence of any access to the location.
 Carried out excavation of 250 m exploratory drift at Power house location in absence of accessibility to site.
 Completed survey of Project site, road cutting works, quantity estimation; prepared work schedules and maintained site progress record.
 Monitored work progress, Prepared reports for head office, government agencies, financial institutions, coordinated with C.O.O’s office as Technical Assistant.
 Coordinated in acquiring land for project, arranging statutory approvals from Government agencies.
 Launched 150 ft DDR Bailey Bridge across river Teesta to provide access at Power House location.

Transport Planner at SPAN CONSULTANTS PVT. LTD
  • India
  • July 2005 to May 2006

SPAN CONSULTANTS PVT. LTD. Lucknow
Transport Planner (July 2005 to May 2006)
Reported to: Team Leader; assisted by 2 subordinates.

 Selected as team member for preparing DPR for Lucknow city traffic management and road expansion project; handled Public Works Department (PWD) project for upgrading city roads and traffic management system.
 Collected traffic data and carried out analysis of same for records and updated danger zones on MAAP software according to the data findings.
 Trained Lucknow Traffic Police and P.W.D department officials for better city traffic management.
 Carried out construction of road embankments, highway barriers for protection in Lucknow.

Education

Master's degree, Project Management
  • at Sikkim Manipal University
  • September 2012

∼ 2 yr. MBA, Project Management (Distance Degree), 2012 (B) - Sikkim Manipal University, SMIT

Bachelor's degree, Civil Engineering
  • at Institute of Engineering & Technology, UP Technical University
  • June 2005

∼ 4 yr. B.Tech. Civil Engg., 2005 (64.44%) - Institute of Engineering & Technology, UP Technical University

Specialties & Skills

Project Documentation
Project Execution
Concrete
Excavation
Contract Documentation
BILLING
CONCRETE
CONTRACT MANAGEMENT
DOCUMENTATION
ENGINEER
ESTIMATION
EXCAVATION
PROGRESS
PROJECT ENGINEER

Languages

Hindi
Expert
English
Expert