Maximum upload file size: 3MB. File types allowed: jpg, jpeg, gif only.

Click the above 'Browse' button to select a photo.
Guidelines
  1. Only upload a photograph of yourself
  2. Photos of children, celebrities, pets, or illustrated cartoon characters will not be approved
  3. Photos containing nudity, gore, or hateful themes are not permissible and may lead to the cancellation of your account
  4. Photos of your passport, ID, or photos containing any personal information such as your address, passport number, or contact details are not permissible for your own security.

Delete Guidelines

RAYEES MOIDEEN

Electrical Engineer

EJADAH ASSET MANAGEMETNT GROUP

Location:
United Arab Emirates - Dubai
Education:
Bachelor's degree, Electrical Engineering
Experience:
35 years, 9 months

Work Experience

What's your work experience? Your experience is one of the most important sections in a CV.
List all relevant responsibilities, skills, projects, and achievements against each role.  If you're a fresh grad, you can add any volunteer work or any internship you've done before.
Add Experience

Total Years of Experience:  35 Years, 9 Months   

November 2018 To Present

Electrical Engineer

at EJADAH ASSET MANAGEMETNT GROUP
Location : United Arab Emirates - Abu Dhabi
An Electrical Engineer with new experience in Facility Maintenance Management in ADNOC(Abu Dhabi National Oil Company) New Head Quarter to ensure all Electrical Power Systems are working at their optimal capacity and effective implementation of best practice engineering services systems in managing, planning & execution, coordination with various entities for smooth conduct of operations.
November 1996 To October 2017

Project Manager/ Project Engineer/Site Manager/ Senior Electrical Engineer/ Site Electrical Engineer

at M/s Arabian BEMCO Contracting Co. Ltd (Previously known as SAUDI BINLADIN GROUP- IPP)
Location : Saudi Arabia - Jeddah
*PROJECT & SITE MANAGEMENT
Client’s basic requirements, general guidelines and Site Meetings. Pre-qualification for sub-contracting works. Planning as per Project Mile Stone requirements for design phase, Site delivery of equipment, Site mobilization, Site construction, Testing & commissioning, Punch list, O &M Manuals, As Built Drawings, Spare Parts & Cataloging system, Final project completion.
* FIELD SUPERVISION
I - Power Plants (Gas Turbine Generators)
Riview the approved drawings, follow-up for non-delivered construction materials/ equipment inspection upon arrival and delivered materials are as per approved submittals. Control and follow-up for scheduling construction activities, Implementation and execution of Electrical Duct banks, Power plant Auxiliaries, All building utilities and clearing Inspection by the consultant as per the approved construction drawing. All electrical works and equipment in & Generator, Turbine, Fuel Management, Fuel Treatment Plant, etc. for Main Plant Area and Balance of Plant works. 380KV & 132kV GIS extension & protection, control and relay panels. Preparation of a complete requirements and coordination with start-up team for energization of 132kV Generator Step-up Transformer, First firing and Synchronization of Gas Turbine Generators.
II. 132/33/13.8KV HV Substations
Erection involving positioning, final alignment, assembly and final installation of the following electrical equipment and facilities.
132KV Conventional Outdoor Switchgear with Dead tank Circuit Breakers, Disconnect and Earthling Switches, CTs, Bus VT’s and Auxiliaries, 132/33KV, 133MVA and 132/13.8KV, 60MVA Power Transformers, 33KV and 13.8KV, Indoor type Metal clad Switchgears, I25V DC Batteries, Battery Chargers, Inverters and DC Distribution Boards, 33KV/220V Station Auxiliary Transformers, Lighting, Fire alarm and Fire detection, Lightning Protection and Grounding works, Protection, Control and Metering System and Interfacing and Modification works.
January 1989 To October 1996

Executive Engineer (Electrical), 1992-1996 and Scientific Officer –SO/SC( Electrical) , 1989-1992,

at M/s Nuclear Power Corporation
Location : India
*Supervision of installation, testing and commissioning coordination including power and control cabling of following Station Auxiliary System.
- 220/6.9KV, 35MVA ONAN Start-Up Transformers.
- CL. III & CL. IV 6.9KV Switchgears and Associated Bus ducts.
- CL. II Motor Control Centers and CL.I DC Distribution and Power Batteries
- Permanent Lighting and receptacle system and Cable tray works in Control Building.
- Construction activities of 400kV Outdoor Switchyard works for Main Output System.
- Preparation of Budget estimates, Monthly progress reports pertaining to electrical works and Monitoring of all electrical works.

*Co-ordination with various agencies for electrical clearances during Over Dimensional Nuclear Power Plant Equipment movement.
- Design, cost estimation, tendering and execution of Internal Electrification of Various Public Buildings.
- Operation and Maintenance of 33/11kV Indoor Substation for Construction Power Supply for Nuclear Power Plant.
- Periodic inspection and storage maintenance of 6.6kV HT Motors.
June 1987 To December 1988

Production Engineer

at M/s Electrical Stamping Manufacturing
Location : India
Manufacturing, Assembly, Processing and Testing of 220kV Instrument Transformers.

Education

What's your educational background?
Let employers know more about your education; remember, be clear and concise.
June 1987

Bachelor's degree, Electrical Engineering

at Aligarh Muslim Univesity
Location : India - Delhi
Electrical Engineering.

Specialties & Skills

Client coordination, Design coordination and site coordination from kick-off till handing over. Vendor development, procurement, Contract development and administration. Planning, scheduling and controlling of project. Performance monitoring and optimizing resource utilization. Adapting and implementing measures for maintaining and meeting the time schedule and quality standards

Microsoft Office 2011, Microsoft Outlook Express, Adobe Acrobat DC, Microsoft Projects, Photoshop, Microsoft Office Document Imaging, Microsoft Office Document Scanning, Font Page.

Project Construction Management

ELECTRICAL INSTALLATIONS

INDUSTRIAL PROJECTS

Languages

Do you speak more than one language?
For some jobs, fluency in one or more foreign languages is a plus, so add your language skills to get better results.

English

Expert

Hindi

Intermediate

Arabic

Beginner

Malayalam

Expert

Urdu

Intermediate

Memberships

Are you a member of any organization or professional club?
Your professional memberships provide an informative signal about your career aspirations, so add them!
Organization : International Association on Electricity Generation, Transmission & Distribution (Afro-Asian Region)
Membership/Role : Active Member
Member since : September 1995
Organization : Associative Member of Institution of Engineers, India (AMIE)
Membership/Role : Active Member
Member since : October 1990
Organization : Institute of Electrical and Electronics Engineers(IEEE)
Membership/Role : Active Member
Member since : February 2008
Organization : Gulf Institute Of Projects
Membership/Role : Project Management Expert
Member since : May 2014

Training and Certifications

Basic occupational Health & Safety Training course (OSHA 30 Hrs) ( Training )

Arabian Bemco Training by HSE Deptt.
April 2009

Under-graduate Training- Various electrical systems ( Training )

Hariduaganj Thermal Power Station
June 1986

Erection and pre-commissioning of various electrical system ( Training )

Kakrapara Atomic Power Station
March 1991

Assembly of 6.6kV, 2800KW Reactor Cooling Pump Motor ( Training )

New Government Electric Factory
December 1989

Operation and maintenance of Lattice Boom Crawler Crane of 650 tones ( Training )

Llieberr-werk
December 1991

Permit To Work /Lock Out Tag Out procedure ( Training )

Saudi Electrcity Company, Training Center
December 2012

Recommendations

Why should I get recommendations?
Get recommendations from your peers and make your profile stand out! Recommendations help employers see that you'er distinguished in your professional areas of expertise.

As Assistant Project Manager in Arabian Bemco Construction Company

By
Khaled Amr
(MANAGER) on 01-12-2012
"I was Mr. Rayees's construction manager for four (4) years while working at Riyadh PP-10 Combined Cycle Power Plant. He is a knowledgeable, hardworking and dedicated Electrical Engineer and it was a honor working with a professional such as Mr. Rayees."

Loading
Loading...
Loading...