Total Years of Experience: 35 Years, 9 Months
November 2018
To Present
Electrical Engineer
at EJADAH ASSET MANAGEMETNT GROUP
Location :
United Arab Emirates - Abu Dhabi
An Electrical Engineer with new experience in Facility Maintenance Management in ADNOC(Abu Dhabi National Oil Company) New Head Quarter to ensure all Electrical Power Systems are working at their optimal capacity and effective implementation of best practice engineering services systems in managing, planning & execution, coordination with various entities for smooth conduct of operations.
November 1996
To October 2017
Project Manager/ Project Engineer/Site Manager/ Senior Electrical Engineer/ Site Electrical Engineer
at M/s Arabian BEMCO Contracting Co. Ltd (Previously known as SAUDI BINLADIN GROUP- IPP)
Location :
Saudi Arabia - Jeddah
*PROJECT & SITE MANAGEMENT
Client’s basic requirements, general guidelines and Site Meetings. Pre-qualification for sub-contracting works. Planning as per Project Mile Stone requirements for design phase, Site delivery of equipment, Site mobilization, Site construction, Testing & commissioning, Punch list, O &M Manuals, As Built Drawings, Spare Parts & Cataloging system, Final project completion.
* FIELD SUPERVISION
I - Power Plants (Gas Turbine Generators)
Riview the approved drawings, follow-up for non-delivered construction materials/ equipment inspection upon arrival and delivered materials are as per approved submittals. Control and follow-up for scheduling construction activities, Implementation and execution of Electrical Duct banks, Power plant Auxiliaries, All building utilities and clearing Inspection by the consultant as per the approved construction drawing. All electrical works and equipment in & Generator, Turbine, Fuel Management, Fuel Treatment Plant, etc. for Main Plant Area and Balance of Plant works. 380KV & 132kV GIS extension & protection, control and relay panels. Preparation of a complete requirements and coordination with start-up team for energization of 132kV Generator Step-up Transformer, First firing and Synchronization of Gas Turbine Generators.
II. 132/33/13.8KV HV Substations
Erection involving positioning, final alignment, assembly and final installation of the following electrical equipment and facilities.
132KV Conventional Outdoor Switchgear with Dead tank Circuit Breakers, Disconnect and Earthling Switches, CTs, Bus VT’s and Auxiliaries, 132/33KV, 133MVA and 132/13.8KV, 60MVA Power Transformers, 33KV and 13.8KV, Indoor type Metal clad Switchgears, I25V DC Batteries, Battery Chargers, Inverters and DC Distribution Boards, 33KV/220V Station Auxiliary Transformers, Lighting, Fire alarm and Fire detection, Lightning Protection and Grounding works, Protection, Control and Metering System and Interfacing and Modification works.
Client’s basic requirements, general guidelines and Site Meetings. Pre-qualification for sub-contracting works. Planning as per Project Mile Stone requirements for design phase, Site delivery of equipment, Site mobilization, Site construction, Testing & commissioning, Punch list, O &M Manuals, As Built Drawings, Spare Parts & Cataloging system, Final project completion.
* FIELD SUPERVISION
I - Power Plants (Gas Turbine Generators)
Riview the approved drawings, follow-up for non-delivered construction materials/ equipment inspection upon arrival and delivered materials are as per approved submittals. Control and follow-up for scheduling construction activities, Implementation and execution of Electrical Duct banks, Power plant Auxiliaries, All building utilities and clearing Inspection by the consultant as per the approved construction drawing. All electrical works and equipment in & Generator, Turbine, Fuel Management, Fuel Treatment Plant, etc. for Main Plant Area and Balance of Plant works. 380KV & 132kV GIS extension & protection, control and relay panels. Preparation of a complete requirements and coordination with start-up team for energization of 132kV Generator Step-up Transformer, First firing and Synchronization of Gas Turbine Generators.
II. 132/33/13.8KV HV Substations
Erection involving positioning, final alignment, assembly and final installation of the following electrical equipment and facilities.
132KV Conventional Outdoor Switchgear with Dead tank Circuit Breakers, Disconnect and Earthling Switches, CTs, Bus VT’s and Auxiliaries, 132/33KV, 133MVA and 132/13.8KV, 60MVA Power Transformers, 33KV and 13.8KV, Indoor type Metal clad Switchgears, I25V DC Batteries, Battery Chargers, Inverters and DC Distribution Boards, 33KV/220V Station Auxiliary Transformers, Lighting, Fire alarm and Fire detection, Lightning Protection and Grounding works, Protection, Control and Metering System and Interfacing and Modification works.
January 1989
To October 1996
Executive Engineer (Electrical), 1992-1996 and Scientific Officer –SO/SC( Electrical) , 1989-1992,
at M/s Nuclear Power Corporation
Location :
India
*Supervision of installation, testing and commissioning coordination including power and control cabling of following Station Auxiliary System.
- 220/6.9KV, 35MVA ONAN Start-Up Transformers.
- CL. III & CL. IV 6.9KV Switchgears and Associated Bus ducts.
- CL. II Motor Control Centers and CL.I DC Distribution and Power Batteries
- Permanent Lighting and receptacle system and Cable tray works in Control Building.
- Construction activities of 400kV Outdoor Switchyard works for Main Output System.
- Preparation of Budget estimates, Monthly progress reports pertaining to electrical works and Monitoring of all electrical works.
*Co-ordination with various agencies for electrical clearances during Over Dimensional Nuclear Power Plant Equipment movement.
- Design, cost estimation, tendering and execution of Internal Electrification of Various Public Buildings.
- Operation and Maintenance of 33/11kV Indoor Substation for Construction Power Supply for Nuclear Power Plant.
- Periodic inspection and storage maintenance of 6.6kV HT Motors.
- 220/6.9KV, 35MVA ONAN Start-Up Transformers.
- CL. III & CL. IV 6.9KV Switchgears and Associated Bus ducts.
- CL. II Motor Control Centers and CL.I DC Distribution and Power Batteries
- Permanent Lighting and receptacle system and Cable tray works in Control Building.
- Construction activities of 400kV Outdoor Switchyard works for Main Output System.
- Preparation of Budget estimates, Monthly progress reports pertaining to electrical works and Monitoring of all electrical works.
*Co-ordination with various agencies for electrical clearances during Over Dimensional Nuclear Power Plant Equipment movement.
- Design, cost estimation, tendering and execution of Internal Electrification of Various Public Buildings.
- Operation and Maintenance of 33/11kV Indoor Substation for Construction Power Supply for Nuclear Power Plant.
- Periodic inspection and storage maintenance of 6.6kV HT Motors.
June 1987
To December 1988
Production Engineer
at M/s Electrical Stamping Manufacturing
Location :
India
Manufacturing, Assembly, Processing and Testing of 220kV Instrument Transformers.