Raymond Hipolito, ELECTRICAL QA/QC ENGINEER

Raymond Hipolito

ELECTRICAL QA/QC ENGINEER

SIX CONSTRUCT CO. LTD

Lieu
Émirats Arabes Unis - Abu Dhabi
Éducation
Baccalauréat, Electrical Engineering
Expérience
17 years, 5 Mois

Partager Mon CV

Empêcher usager


Expériences professionnelles

Total des années d'expérience :17 years, 5 Mois

ELECTRICAL QA/QC ENGINEER à SIX CONSTRUCT CO. LTD
  • Émirats Arabes Unis - Abu Dhabi
  • Je travaille ici depuis juillet 2010

SIGNIFICANT CONTRIBUTIONS
2010 - 2014
•Initiated the first move on requesting for electrical inspection (ITR) from the company, organizing a proper documentation of the daily monitoring & reports, and maintainance of an updated log of all electrical works during the start of the project.
•Performed a strict compliance of electrical inspection and monitoring as per project specifications and PQP.
•Contributed significantly to better inspection results and to achieving work targets (electrical works) on time.
•Obtained approval from the company for the proposed modification of all Earthing and Lightning Protection Pits at the finishing stages of the basements of the project.
•Highlighted all comments of ITR’s and shop drawings for compliance to be included in Weekly MEP Meetings.
•Supervised the team to deliver good results with regards to daily inspection and monitoring and handling inspection requests from sub-contractors.
•Obtained approvals from difficult inspections conducted by Construction Manager.

Duties and Responsibilities:
•Daily monitoring /inspection of all electrical installation and work progress on site.
•Coordinate to all site team, Company Engineers and Subcontractors with regards to urgent matters in order to avoid delay.
•Update MEP Manager, QC Manager and Construction Manager with regards to updated MEP monitoring Logs.
•Perform Quality Checking of Material Delivery & Documents trough Material Verification Report.
•Prepare and obtain approval of MEP Clearance prior to Casting.
•Reviewing of For Submission and Commented Shop Drawings, MAR and Method of Statement prior and upon receiving from company
•Attending Pre-Testing & Commissioning Inspection accompanied by third party and company representatives.
•Consistently obtaining ratings of ‘”A” on all ITR’s.
•Monitoring Inspection concerning MEP Installations which is relevant to Finishing Team.
•Assess all team members concerns with regards to daily inspection.
•Ensuring all inspections / activities of team members are in safe manner and to report any safety concerns to the HSE Department.
•Other duties as instructed by Managers and CM.

ESTIMATE and DESIGN ENGINEER à TAHILL CONTRACTING
  • Émirats Arabes Unis - Dubaï
  • février 2008 à avril 2010

Duties and Responsibilities:
Prepare complete Electrical Shop drawing and Schedule of loads in accordance to DEWA standard rules and regulations.

Coordinate to DEWA for technical discussion for the submission of the shop drawing and documents needed.

Coordinate to Project Consultant for verification, information and approval of Electrical Shop Drawing before submission to DEWA as well as during the implementation of the approved project.

Update validity of all DEWA documents needed from Shop Drawing Approval application up to permanent application thru their website.

Prepares Material Indent and checking materials approval as per BS standard or same quality as per Project Specification.

Implement the approved drawings of DEWA at site and have discussions to the Electricians for the start of Installation Project.

Monitor every stages of work and compares according to plan.

Revise drawings and load schedules if changes occur during implementation of the project. Coordinate to various electrical
suppliers and update material's price evaluation.

Apply permanent electricity and water connection to DEWA.

Apply for Authority inspection of completed electrical installation project.

Testing of Finished Electrical Installation Project

Other related works asked by the company.

Production Engineer à International Wiring System(Phils.) Corp.
  • Philippines
  • juin 2005 à août 2006

•Attends and participate actively in sectional meetings and implement design change of the Assembly Line(Toyota Tundra Model)
•Checking of assembly boards
•Reports any problem that may cause delay in work/ operation
•Checking of clips and circuit boards of wiring harness.
•Sub- assembly racks design including maintenance and improvement.
•Ensures that the area of responsibility is always clean and free from accident.
•Submit Kaizen proposals or recommendations for improvement in productivity including the Work Performance of the Workers in Assembly Line.
•Implement waste segregation and executes proper disposal of waste.
•Doing Paper Works in Engineering Department II given by the Supervisors and Line Leaders.

Éducation

Baccalauréat, Electrical Engineering
  • à Tarlac State University
  • avril 2005

REGISTERED ELECTRICAL ENGINEER( REE License # 0038052) REGISTERED MASTER ELECRICIAN(RME License #0031862) Electrical Engineer’s Licensure Examination Professional Regulation Commission (PRC) Manila, Philippines , April 17,18,19 & 20, 2006.

Specialties & Skills

Electrical Engineering
Quality Assurance
Service Assurance
Engineering Drawings
Computer Industry
AUTOCAD 2007 (2D & 3D Drawings), Electrical Layout and Design, Computer Literate.

Langues

Anglais
Expert

Adhésions

INSTITUTE OF INTEGRATED ELECTRICAL ENGINEERS OF THE PHILIPPINES, INC. (IIEE)
  • Member
  • June 2003