مجموع سنوات الخبرة: 7 سنوات, 8 أشهر
أبريل 2009
إلى أبريل 2014
Electrical design engineer
في Dar Al-handasah
البلد :
لبنان - بيروت
Worked within a team in developing the design of one of the major projects in Saudi Arabia - Princess
Nora University.
Completed the lighting design for three colleges using Dialux.
Developed the corresponding lighting fixture schedule completed the lighting layout by wiring.
Extended my knowledge in lighting control via BMS (EIB and MSSP systems).
Designed feeder data schedule for one of the colleges including voltage drop, short circuit calculations,
and selection of breakers based on discrimination studies.
Designed riser diagram for one of the college buildings.
Gained valuable experience in design implementation through inspection of shop drawings and
reviewing of material submittal.
Designed the lighting layout for one of the main avenues in the urban area of Angola with the aid of
lighting design program Calculux.
Nora University.
Completed the lighting design for three colleges using Dialux.
Developed the corresponding lighting fixture schedule completed the lighting layout by wiring.
Extended my knowledge in lighting control via BMS (EIB and MSSP systems).
Designed feeder data schedule for one of the colleges including voltage drop, short circuit calculations,
and selection of breakers based on discrimination studies.
Designed riser diagram for one of the college buildings.
Gained valuable experience in design implementation through inspection of shop drawings and
reviewing of material submittal.
Designed the lighting layout for one of the main avenues in the urban area of Angola with the aid of
lighting design program Calculux.
مايو 2011
إلى يوليو 2011
Lighting design engineer
في Lux Lab
البلد :
لبنان - بيروت
Seeking a leadership position where I can apply and promote my engineering design skills and knowledge.
سبتمبر 2008
إلى فبراير 2009
Site Engineer
في Al Habtoor Leighton Group
البلد :
الإمارات العربية المتحدة - دبي
Worked on construction site as a MEP coordinator to ensure all installations are in accordance to specifications and
issued at appropriate time.
Performed necessary coordination between consultant and sub-contractor to make sure work progress is
ideal.
issued at appropriate time.
Performed necessary coordination between consultant and sub-contractor to make sure work progress is
ideal.
انشر على فيسبوك
انشر على تويتر
مشاركة عبر البريد الإلكتروني