رضا القلاف, Acting Area Line Construction Manager

رضا القلاف

Acting Area Line Construction Manager

Alstom

البلد
المملكة العربية السعودية - الشرقية
التعليم
بكالوريوس, APPLIED MECHANICAL ENGINEER
الخبرات
21 years, 3 أشهر

مشاركة سيرتي الذاتية

حظر المستخدم


الخبرة العملية

مجموع سنوات الخبرة :21 years, 3 أشهر

Acting Area Line Construction Manager في Alstom
  • المملكة العربية السعودية - الرياض
  • أشغل هذه الوظيفة منذ أبريل 2017

Line 5 OPC, Operating, Planning and Coordinating
- Coordinate site activities with including civil and MEP work.
- Design review and implementation
- Meeting with client representative RAMPED.
- Planning 5 weeks loo ahead activities.
- Monitoring related activities through quality inspection request.
- Weekly and daily reports to higher management.
- Supervising sub-systems activities.

senior project engineer في SADARA
  • المملكة العربية السعودية - الجبيل
  • مارس 2014 إلى يوليو 2016

Leveraged Assets, Out Side Plant System for Fiber Optic & Copper Cables & Interfacing
 Controlling the interface activities between 26 plants inside SADARA
 Coorporate all interface comments within scheduled time
 Planning the two weeks look a head schedule
 Check the materials availbiltyschedule
 Coordinate the site activities with other orginaization
 Review the as built drawing
 Make a weekly & monthly highlight report
 Conducting weekly and monthly meeting to review the progress
 Make change orders and following the implementing stage.

Construction Engineer في Jacobs Engineering Group
  • المملكة العربية السعودية - الخبر
  • يونيو 2013 إلى مارس 2014

East Dammam Site Development and House Construction Project
 Reviews Project schedule
 Design criteria, drawing standards and conventions, and design guidelines
 Input to the Service Orders for Basic Engineering, Detailed Design and Construction Supervision services
 Management and coordination for PMT team.
 Engineering and design data review.
 Incorporate existing design data, drawings, and specifications
 Engineering Standards, Material and Performance Specifications, and Vendor lists.
 Leads reviews of all contractor’s drawings, standards, specifications, lists and calculations, Engineers Estimates and Bills of Quantity in accordance with the procedures.
 Attend Periodic and Design Review Meetings

Construction Consultant في RESOURCE SCIENCES ARABIA LIMITED
  • المملكة العربية السعودية - الخبر
  • أكتوبر 2002 إلى نوفمبر 2013

 Responsible for applying project plans and specifications for constructability, productivity and improvement.
 Provides consultation and guidance to large and complex projects as required.
 Provides technical direction and administrative guidance to staff involved in the development and application of innovative and unique construction methodologies required by projects.

Additional Capacity Project, Qatif& Riyadh Bulk Plants 2009 - 2013
• Works with the Project Managers, Site Managers, Field Engineers and Contractors, to provide a cross discipline/cross team approach to coordinated construction activities.
• Supervising the installation and commissioning of new metering skid in Riyadh BP.
• Deals with civil work for Diesel Tanks and their dike wall.
• Follow up with material group to expedite material delivery.

Waste Water Project, Dhahran Bulk Plant 2007 - 2009
• Works closely with the Planning group, Project Operations Manager, and Site Managers to set the priorities of construction activities, resolve clashes and maximize completion of scope.
• Deals with underground pipes and submersible and vertical pumps for oily water system.
• Tie-in between the new sanitary water system and the existing system.
• Process Change Orders and Cost Estimations.
Two Grades of Gasoline Project, RT Refinery 2004 - 2007
• Works directly with the Construction and Project Management Team and provideafull construction support.
• Deals with shipper pumps, Motor Operated Valves (MOV) and die sensor for distinguishing premium and super-premium gasoline.

Qatif Facilities Project, Berri Gas Plant 2003 - 2004
• Supervise early work for mega-project leading a team of multi-discipline site management.
• Deals with piping activities (Hot-Taping and normal Tie-In, Hydrostatic and pneumatic test, and construction).
• Coordinates all concerns between the proponent, Project Management and the construction contractor. This involves progress reports.
• Install HVAC system for control room.
Ethane Recovery Project, Berri Gas Plant 2002 - 2003
• Exposed to daily referencing to industrial standards.
• Helps construction agency to develop method of statement and Job Safety Analysis.
• Helps contractor to complete the work as built drawing.
• Monitoring and reporting of safety and environmental compliance.

Construction Engineer في SRACO
  • المملكة العربية السعودية - الدمام
  • فبراير 2013 إلى مايو 2013

Construction Engineer with Saudi Aramco (SMP) with
 Senior Site representitive for Sulayyil Bulk Plant
 Support the contractor for precommissioning& commissioning of new expantion.
 Commissioning of new metering skids insatalled in the expantion.
 Testing loading & unloading skids.
 Work on Project close-out including performane items.

Sales Engineer, Engineered Products في ARABIAN SEALS COMPANY LIMITED
  • المملكة العربية السعودية - الدمام
  • يونيو 2002 إلى ديسمبر 2002

 Gained experience in selecting proper mechanical seal and materials according to specifications and design criteria.
 Worked with engineering department as an Auto-CAD drafter for drawings of production.
 Worked on Inspection& testing of products(Dimensions, surface roughness and design) before being released to clients.
 Conducted site visits to several companies for observing, testing, installing or repairing mechanical seal.

الخلفية التعليمية

بكالوريوس, APPLIED MECHANICAL ENGINEER
  • في KING FAHD UNIVERSITY OF PETROLEUM & MINERALS
  • يونيو 2001

Specialties & Skills

PROJECT Management

اللغات

العربية
اللغة الأم
الانجليزية
متمرّس

العضويات

SAUDI ENGINEERING
  • PROFESSIONAL ENGINEER
  • February 2014