Redha AL Zerkiny, PIPEING ENGINEER OF CONSTRUCTION DEPARTMENT

Redha AL Zerkiny

PIPEING ENGINEER OF CONSTRUCTION DEPARTMENT

samsung Engineering

Location
Iraq
Education
Bachelor's degree,
Experience
20 years, 4 Months

Share My Profile

Block User


Work Experience

Total years of experience :20 years, 4 Months

PIPEING ENGINEER OF CONSTRUCTION DEPARTMENT at samsung Engineering
  • Iraq - Basra
  • My current job since July 2012

Developed the West Qurna oil/Gas field of Iraq Projects. ( CPF construction, piping, export pipe line, OGM including the Trunk line and flow lines, water stations and water injection, accommodating area. The owner of this work was Lukoil Russian company. They already had been deal with ministry of oil Iraq governor as develop this oil field.
Duties:
1- Traveling to South Korea as period 2 months, Samsung HQ office, as the business trip to preparing piping documents such as: Methods Statement for the piping & pipeline; Piping & pipeline Procedures; Work Plan, ......Schedules.

1. QA/QC Department 2. Construction Department _Local Engineer Team Leader at CPECC_China Petroleum Engineering Construction Crop
  • Iraq
  • January 2010 to June 2012

Quality Assurance and Quality Control Department:
A- Duties:
Following the Standards; Specifics; Approval drawing; Testing & documents for works performance at jobsite for verifying the quality control and quality issuance.
B-Actions:
1- Checking all activities at jobsite one by one and Informed the sub contractor how was in-charge to finished the work about the major
and miner issue and verify the right solution for justify these issues.
2 - Solving all problems at jobsite to be satisfied with MD.O.C and WAHA.
3- Bushing the subcontractor to be following the rule of construction.
4- Teaching the sub contractor engineering and supervision at jobsite.
5- Meeting the sub contractors for outstanding issues.
6- Preside the meeting with WAHA, MD.O.C & S.O.C.
7- Verifying the documentation works of the sub contractor that’s have to submit for got approved from WAHA.
Team Leader Engineer of construction Department:
A- Duties:
Following the Schedules, Progressing, Planning, work Performance, finishing schedules, Daily & Weekly Reports, Handovers projects.
B-Actions:
1- Following and checking the activities for the job performance.
2- Bushing the sub contractors for finishing their works.
3- Jobsite inspection and following the progressing.
4- Present the weekly meeting with sub contractors for checking the schedules and planning for works.
5- Submitting the Daily status reports for the PMC of WAHA; daily & weekly reports for CPECC manager department.
6- Submitting the handover document to WAHA for EXL1.
7- Preparing the Cathodics protection system course for MD.O.C & S.O.C
8- Attending the handover meetings with GMC, MD.O.C and WAHA for discussions.about the items needs to finish and punch listing works.

The CPECC had construction of oil pipeline at three direction EXL1(Crude 24"), EXL2(Crude 10") & EXL3 (Gas 16")and also central process facility CPF including the tanks construction and networks pipeline.

QA/QC Engineer at VIAP_VERSAR International Assisstance Projects
  • Iraq - Baghdad
  • April 2006 to January 2010

I worked as AFCEE Title II Quality Assurance Engineer & Team Leader with VIAP IRAQ, for construction & reconstruction IA military base buildings and police station including the road constructions; Sewerage System and plants; Water storm System and plants; Water distribution system including the water treatments plants; Power stations . the purpose to verifying and applying the international standards according to (ABI, IBS, IMC, IEC, ANCE, IPC....)
A- Duties:
Following the Standards; Specifics; Approval drawing; Testing & documents for works performance at jobsite for verifying the quality control and quality issuance.
B-Actions:
1- Checking all activities at job site one by one.
2- Checking the HSE requirements.
3-Informed the contractor how was in-charge to finished the work about the major and miner issue and verify the right solution for justify these issues.
4 - Solving all problems at job site to be satisfied with standards.
5- Bushing the contractor to be following the rule of construction.
6- Teaching the contractor and sub contractor engineering and supervision at jobsite.
6- Meeting the contractors for outstanding issues.
7- Preside the meeting with owner.
8- Verifying the documentation works of the contractor that’s have to submit for got approved from owner.
9- Attending and getting ACI American training Grad one, I get 78 % including the Badge & Certificate.
10- Attending and getting OSHA Training, I get 95 % including the Certificate.

1- Site Engineer 2- QC Engineer at PARSONS-BHE IRAQ
  • Iraq - Baghdad
  • June 2005 to January 2006

I worked as a site & QC engineer with PARSONS-BHE IRAQ, for construction new primary healthcare at wassit city( AL Aziza Distract, Al Kut City, Shakh Saad Distract)

A- Duties:
Following the Standards; Specifics; Approval drawing; Testing & documents for works performance at jobsite for verifying the quality control and quality issuance.
B-Actions:
1- Checking the HSE requirements.
2- Testing all materials at Job site and following the resulting form the laboratory.
3-Checking all activities at job site one by one.
4-Informed the sub contractor how was in-charge to finished the work about the major and miner issue and verify the right solution for justify these issues.
3 - Solving all problems at jobsite to be satisfied with Iraqi and international codes.
4- Bushing the subcontractor to be following the rule of construction.
5- Teaching the sub contractor engineering and supervision at jobsite.
6- Meeting the sub contractors for outstanding issues.
7- Preside the meeting with owner.
8- Verifying the documentation works of the sub contractor that’s have to submit for got approved from owner.

Project Manager at ALMCO Company
  • Iraq
  • March 2005 to April 2005

I worked as a project manager with ALMCO Company for construction new primary healthcare clinic (type C) in SHEIK SA’AD sub district

Project Manager at ISO for General constructions
  • Iraq
  • November 2004 to March 2005

I worked as an Executive Project manager with ISO Company for construction and reconstruction, Hospitals; Clinic; Multistory Buildings; doctors leaving area in al-Zahra's hospital; Road Pavement; Water Treatments; Electrical net works.

Project Manager at Al-huda Company_General Construction
  • Iraq
  • April 2004 to July 2004

I worked with Al-Huda Company for general contracts as an executive Project Manager for construction new building for WASSIT province council. This contracting had been bid and contracting form CPA. with limited Period two months. The project already had finish within this period. The works was satisfaction and acceptance from the CPA and Wassite government. All had been executive under the international standards and Iraqi codes.

QC Engineer at Al-SADA Company_General Construction
  • Iraq
  • August 2003 to March 2004

I worked with Al-Sada Company as a QC engineer for reconstruction school in WASSIT province this contract had been bid and contracting from The ECCI. For supervision the works performance and complied with international standards and Iraqi codes .

Education

Bachelor's degree,
  • at • Bachelor in Mechanical Engineering from university of technology at 2003
  • July 2003

Specialties & Skills

Construction Technology
Quality Systems
Test Automation
AutoCAD
Construction and Project Management/Supervision
Microsoft Office Proficient
Quality Assurance and Quality Control Management/Supervision
Construction and Project Management/Supervision
Cost Estimation and Quantity Surveying
Civil Testing
Hydrostatic Test
Computer hardware and software installation

Languages

English
Expert
Arabic