Research associate
Kuwait institute for scientific research
Total years of experience :19 years, 2 Months
Summary for my C.V
I have an excellent experience in the next fields: -
1. Pilot plant accompany with (hydrocracking unit - hydro treating unit-isomer unit- and thermal cracking unit) and all its operations
2. Dealing with DCS (control room).
3. Full responsibility for Sulfur analysis to detect it's concentration in the oil before and after the treating
4. Arrangement of samples and recording results in excel sheet
The operations on the unit including the next processes:-
1. Loading process
2. fixing the reactors on the unit
3. Leak test
4. Implementation of the procedure of the pre-sulfiding and operating conditions
5. restarting, freezing, and shutdown the unit
6. Applying the ramping diagram
7. Excellent experience and sensitivity to recognize the problem and the alarm on the unit and how to treat it and creating a solution for these problem which may be:-
• Level problem
• Overshooting
• High pressure
• Trip case
• Pumping problem
• Ventilation problem
""I'm thanking my God for the best and strong relations with my team work and my superiors because they are trusting me for my Seeking honesty and sincerity in action""...
--------------------------------------------------------------------------------------
NOTE:-
Before this career of oil&gas i spent 14 years as teacher of chemistry in Egypt, Libya and Kuwait
Therefore the science of chemistry always my Attention and studying
------------------------------------------------------------------------------------
Summary for my C.V
I have an excellent experience in the next fields: -
1. Pilot plant accompany with (hydrockraking unit - hydro treating unit-isomer unit- and thermal cracking unit) and all its operations
2. Dealing with DCS (control room).
3. Full responsibility for Sulfur analysis to detect it's concentration in the oil before and after the treating
4. Arrangement of samples and recording results in excel sheet
The operations on the unit including the next processes:-
1. Loading process
2. fixing the reactors on the unit
3. Leak test
4. Implementation of the procedure of the pre-sulfiding and operating conditions
5. restarting, freezing, and shutdown the unit
6. Applying the ramping diagram
7. Excellent experience and sensitivity to recognize the problem and the alarm on the unit and how to treat it and creating a solution for these problem which may be:-
• Level problem
• Overshooting
• High pressure
• Trip case
• Pumping problem
• Ventilation problem
""I'm thanking my God for the best and strong relations with my team work and my superiors because they are trusting me for my Seeking honesty and sincerity in action""...