René Ackermann, Supervisor

René Ackermann

Supervisor

ITP

Location
France
Experience
29 years, 9 Months

Share My Profile

Block User


Work Experience

Total years of experience :29 years, 9 Months

Supervisor at ITP
  • United Arab Emirates
  • March 2010 to December 2010

Erection and supervision on site:
Structural prefab, Erection Structural, piping and pressure vessels:
Storage reservoirs: Cryogenic. Erection furnace: Reheating and annealing
Coordination QA-QC: Radiograph interpretation
Coordination with engineering: Piping Material Classes: Material list
Welding procedure specification (WPS) for piping (carbon steel)
With procedure qualification record (PQR) Quality control procedure for weld control-
piping’s.QCP for pressure testing of piping:

Manager
  • March 2008 to September 2009

TFSI-VEOLIA-OTV-SA-
Sludge Treatment and incineration system: Saint Petersburg’s-Russia: have repairs try
boiler, for connections, have design pressure 33bars service, and design temperature 455°C.
The situation with steam leakage, and furnace 1-2-3 have not using qualified certified
welders, welding procedure, or constant control by subcontractor. (Russia procedure
GOST16037-80) Welder’s qualification is not accept by laboratory and Russia, passport
and welders, is not approved. Control by x-ray film 20 welds: for welding is no approve by
laboratory. OTV have checking 15 companies for testing welder. X-ray film 100°/°, modified
supports and stress. Testing piping. Insulation piping. To put in conformity the direction of
the diaphragm. To control piping’s connection of the turbine, in welding, then the support
of connection on the turbine, parallelism. To re-examine the installation and the self-
supporting quality of the air service. To re-examine the installation of the heating vapour
for the factory, to be checking air ventilation. Repairs the superheated SH1+SH2, the
evaporator EV1, the economizer, the evaporator EV2.
Meetings-Planning. Progress.

Supervisor at Mars
  • United Arab Emirates
  • January 2007 to January 2008

Entrepose: Project Kotc -LPG Mounded Storage Tanks
Welding Procedures-Quality control Inspection for pressure testing of on-plot piping
Welders Qualification-CS Welders Qualification Records-RTR Jointers Qualification
Records.

Site Manager at Exxon
  • Saudi Arabia
  • September 2002 to February 2003

Pressure Reducing Station Kribi-Cameroon
(Thad Cameroon Pipeline
Supervision of works on site
Planning-Progress-Meetings
Responsible for detection of difficulties
Diagnosis of problems
Making conform to the schematic to be checked on site
Management of personnel National and Expatriates (60workers)
Construction Life Camp: civil, hot and cold water, domestic central heating, sanitary plumbing-
Fire protection service-Air-Flow

Supervisor
  • June 2003 to January 2003

Planning-Progress-Meeting
Checking on site by PIDQA/QC-Documents final.

Supervisor at DOMO CAPRULONA
  • March 2002 to July 2002

Progress schedule
Control quality
Radiography interpretation
QA-QC documentation-final document
Metings

QA at TOTAL FINA ELF MIDER
  • June 2001 to October 2001

PROJECT SHUTDOWN REVAMPING
Super-Intend ant
Plannigs-meetings :
70 piping prefabrication before in shutdown
Erection priority lines (fractionation-reaction)
List of lines to be dismantled (fractionation-reaction)
Control quality (piping prefabrication)
Radiography interpretation
Specification painting specification insulation
Equipment static scope of work e-engineering documentation

PROJECT at STRABAG
  • United Arab Emirates
  • November 2000 to April 2001

-AQP

Supervisor
  • January 1999 to January 2000

PLANT
ELF-ATOCHEN

Supervisor
  • January 1998 to January 1999

FURNACE CALVANISATION-GERMANY (156Brenner)
SELAS :

SUPERVISOR at DOMO CAPREULONA CHEMICALS
  • January 1997 to January 1998

To control works quality contracted to RAYTHEON-LITWIN
Engineering and construction activities.
Participation to construction meetings.
Punch listing of all non conformances
Some listing and verification of corrective measures

at IPEDEX
  • January 1996 to January 1997

THAINOX-

WORKS MANAGER at ALUMINIUM PROJECT EGYPT-CLECIM
  • January 1994 to January 1996

Units, hot mill, cold mill, reheating furnace, annealing furnace
Piping preparation after prefabrication, Hydraulic pipe work-Test pressure
Pickling and neutralisation by bath-piping preparation before commissioning
Pickling and neutralisation by circulation, checking of passivation (rinsing)
Modification of piping after treatment

SITE MANAGER at ELEM PROJECT NIGERIA-SPIE BATIGNOLLES
  • January 1992 to January 1994

Qualification of welder: for Piping, Cooper, Cast Iron, and Galvanised Steel
Construction:life-Camps-Electrical-local-Technique-Canteen-Home-Leave-Rain-Water
Sanitary, Plumbing-hot-cold and drainage-Pipe-Underground-Air Flow in Ducts-Central
Heating-Sprinkler, Installations-Connection-pumps-Pipe-gas-service-Fire-protection-
Services- Planning, meeting.

WORKS SUPERVISOR at ALUMINIUM
  • January 1990 to January 1992

Responsible for boiler work, welding, handling transporters
Erection thanks-storage for coke and aluminium
Quality control, control-x-ray films-dye penetrand-ultrasonic-ressuage-non destructive
Testing, planning, meetings, documents contactor

CONSTRUCTION MANAGER at PROJECT HBJ PIPELINE IN INDIA-SPIE CAPAG R-C-M
  • January 1987 to January 1992

charge: all disciplines, civil work, piping mechanical, electrical,
Instrumentation-Supervision and coordination with sub-contractor
Work progress follow-up, Planning-Meetings

Site co-ordinator
  • January 1985 to January 1986

Construction of a 2500 m3 tank with floating roof, two 16000 m3 tanks
With fixed roof and pipe connections, Planning-progress-Meeting-QA/QC

Site Manager at ELF
  • Egypt
  • January 1983 to January 1984

Responsible for platforms and south and north satellites, new works
Detection of difficulties, diagnosis problems, repair and maintenance of
Mechanical equipment, pipe network, electrical equipment, gas
Compressor installation, all trades in liaison with engineers in all Services concerned
Planning-Meetings-Progress- QA/QC

work supervisor at ZUBAIR IRAQ-TECHNIP
  • January 1982 to January 1983

Responsible for detection of difficulties, diagnosis of problems, making
Conform to the schematic to be checked on site, and discussing
Problems detected with the design office: Planning-Progress-Meetings- QA/QC

Supervisor at SAFI MAROCCO PHOSPHATE PLANT-HEURTEY INDUSTRIES
  • January 1981 to January 1982

Start up, responsible for detection of difficulties, diagnosis of problems
Repair and maintenance of mechanical equipment, pipe network, water
Treatment equipment and instrumentation: Planning-Progress-Meetings- QA/QC

QA at Manpower
  • United Arab Emirates
  • January 1979 to January 1980

FOSTER WHEELER
Construction Life-Camp-Canteen for

Works supervisor at NORTH SEA PLATFORM-CIB ELF
  • January 1974 to January 1976

Drilling derrick installation, installation of modules 1, 2 and 3 and various works
Start up system for technical problems, installation of three 750 m3/h
Vacuum degassers-Planning-Progress-Meetings- QA/QC

Works supervisor
  • January 1970 to January 1974

Pipeline installation-Welding book, storage at thermal power station
Marcoule CEA (atomic energy commission)
Coating of stainless steel cells, Radiation protection on floor and Walls
Dubai UAE-Land and sea works co-ordination manager (pipe work, equipment and personnel)
1966-1970 FOS SUR MER STEELWORKS-BOCCARD
Site manager
Installation of rolling mill, installation of hydraulic, pipe work for hydraulic control
FOS end Meer oils refinery
Installation water processing complex, Lurgi process, system and start up for technical
Problems
1965-1966 Feyzin oil refinery
Team leader
Responsible for prefabrication workshops, inspection with general layout drawing,
Works progress
Rodia Seita petrochemicals complex
Responsible for erection, pipe work, installation of pumps works progress
Aramont station Installation of a pharmaceutical plant, pumping installation, starts up system for
technical.
General for constructions
Hot Rolling Mills: Fly Wheel Assembly: Pulley Wheel Assembly: Reduction Gear Box: Pinion
Stand: Speed increaser: Steel Rolling Mill Stand: Gear Couplings: Hot Saw Machine:
Straightening Machine: Shearing Machine: Roller Conveyor: Forged Rolls: Automatic cooling Bed:
Speed Reducer: Sprockets:
Col Rolling Mills: Reduction Gear Box: Pinion Stand: Steel Rolling Mill Stand: Gear Couplings:
Shearing Machines: Forged Rolls:
Process & Miscellaneous: Furnace Casing: Lopper Cars: Double Roll Crusher: Coil Car Floor
Mounted: Rotary Coal Breaker: Kick off Device.
Piping: Circuits to be treated: Piping Preparation: Before usage: After Prefabrication: Preparation
on site: Piping pressure tests: Pickling and neutralisation by bath: Pickling and neutralisation by
Circulation: Rinsing: Control: Piping modification after treatment: Safety.
Work instructions-Specification-Drawings-Quality Plans: Master Samples.

Coordinator at Power Plan SNC LAVALIN Algeria SKIKDA
  • May 2005 to

meeting, progress: equipments on site, structure,
Piping’s- procedure-WPS-P-11-P-22 P-91, to carbon steel, management for crane, 60t-350t.
Pre-commissioning, install priority lines. Meeting for control all materials is no missing.

  • January 2001 to

water dosage and compressed air-4 inadequate system selection-5 generation of layers in the
concrete-6generation of “nests «in the anchor and edge zones-7neglected final treatment.
method statement erection WAULTS. Measuring the vault. Steel construction checks
Bracket position.Install burner, connection and pipes.
meetings-progress.

Supervisor
  • January 1986 to

Construction of 6 furnaces-2 reheating-1 homogenization furnaces-3 annealing
furnaces, Works: Hydraulic, greasing, reining, gas, nitrogen, water, mechanical
Quality control-Progress-Planning-Meetings

work supervisor at Sidem
  • United Arab Emirates
  • January 1974 to

Installation of vertical pumps and associated elements, pipe work
Construction of a storage tank plant,

Supervisor
  • to

Morocco-Safi
Project: Revamping Unity: Planning-Progress on Site-QA/QC
Meeting: Making conform to schematic to be checked on site

Project at General Electric International
  • United Arab Emirates
  • to

Erection Turbine: Supervisor Tank and Piping
Construction life camp: Green Zone and South Baghdad-Planning-Progress-Meeting
Coordination with project and corrective action
Drafting of inspection reports Radiograph interpretation-QA/QC

Specialties & Skills

DIAGNOSIS
MATERIALS MANAGEMENT
MECHANICAL
MEETING FACILITATION
MICROSOFT WORKS
OIL PAINTING
PERSONNEL
PLUMBING
PROGRESS

Languages

English
Expert
French
Expert
German
Expert