Reynaldo Bugayong, Senior Mechanical Engineer

Reynaldo Bugayong

Senior Mechanical Engineer

SK Engineering & Construction

Lieu
Philippines
Éducation
Baccalauréat, Mechanical Engineering
Expérience
17 years, 2 Mois

Partager Mon CV

Empêcher usager


Expériences professionnelles

Total des années d'expérience :17 years, 2 Mois

Senior Mechanical Engineer à SK Engineering & Construction
  • Arabie Saoudite - Riyad
  • avril 2011 à novembre 2012

• Manage the installation of Air Handling Units, Energy Recovery Units and associated ducts.

• Manage the installation of Solar Water Heater System including associated water system pipes.

• Manage the installation of Drainage & Sewerage System.

• Review design and issued for construction drawings in accordance with the scope of works, standards and material specifications. Submit recommendation as required.

• Plan and prepare a sequence of installation works in accordance to composite drawing as a basis by other discipline.

• Ensure that all phases of constructions and testing are within the parameters of Saudi Aramco Standards.

Mechanical General Supervisor à KELLOGG, BROWN and ROOT (KBR)
  • Qatar - Doha
  • janvier 2008 à septembre 2010

• Review design and issued for construction drawings, Vendors’ Data Sheets and Drawings in accordance with the scope of works, standards and material specifications according to the contract requirements for project implementation.

• Manage/Supervise the installation of six (6) units with 5.0 Megawatts Emergency Diesel Generator with 16 cylinders Caterpillar Diesel Engine and its associated major components, such as, Air Start Unit, Control Cabin, Sand Filters for the Enclosure, Air Intake Filters for the Diesel Engine, Air Intake Fans, Air Inlet and Outlet Louvers, Inlet Sound Reducers, Air Inlet and Outlet Coulissen, Cooling Water Expansion Tanks, Lube Oil Tanks, Inergen Fire Fighting and Detection System, Jacket Water Heaters, Jacket Water and Air Cooler piping, Fuel Oil piping, Lube Oil piping, Exhaust System, Pressure and Temperature Transmitters.

• Manage/Supervise the construction of Utilities Plant Air System, that is, installation of Gear Type Air Compressors, Air Dryers, Instrument Air Buffer Vessels, Air Aftercoolers, Air Compressor Cooling System & associated piping and supports.

• Manage/Supervise the construction of Steam Super Heater, that is, installation of Economizer, High Pressure Evaporator, Super Heater Module, Steam Drum, Force Draught Fans, Smoke Stack, Twenty units Burners, Fuel Gas Skid, Ammonia Vaporization Skid, Cooling Air Skid and Piping Systems.

• Supervise the alignment of Motors and Air Compressors using Laser Alignment Tools. Ensure that the alignment, pipe flange parallelism, motor soft foot and pipe strain are within the tolerable limits.

• Supervise the installation of Gas Turbine including the associated Gearbox, 47.6 MVA rating Generator and Starting Equipment.

• Supervise the installation of Steam Turbine including the 50.5 MVA rating Generator and Auxiliary Equipment such as Air Cooled Steam Condenser and Condensate Pumps.

Mechanical Engineer à Saudi Aramco
  • Arabie Saoudite - Khobar
  • septembre 2006 à décembre 2007

• Maintain the Project Quality Performance by working closely with each contractor performing works on the program to plan and implement a solid quality management system set forth by Aramco Standards.

• Ensure that processes needed for the quality management system are established, implemented and maintained.

• Review design and issued for construction drawings in accordance with the scope of works, standards and material specifications according to the contract requirements for project implementation.

• Prepare and develop Exception Item Lists and Mechanical Completion Certificate as a final stage of the project for Saudi Aramco Proponent acceptance.

• Ensure that pre-welding & weld joint fit-up including flame cutting, arc-air gouging, plasma cutting, buttering, joint-weld metal build-up are with the Saudi Aramco acceptance criteria, such as, welding procedures, joint fit-up clearances, tolerances for holes cut for set-on-nozzles and bosses or branch connections.

• Ensure that pipe field bending will conformed within the Saudi Aramco established parameters, such as, maximum permissible localized bend or “bite” at one place on the pipe and the minimum spacing of such bites, pipe diameter of the preformed bend is not reduced by more than 2½% of the nominal pipe diameter, overall bend radius.

• Ensure that all pipelines, including all joints or sections of pipeline are holiday tested immediately before backfilling/covering; radiographic, ultrasonic and magnetic particle tests as required.

• Ensure that Hydrotesting of pipeline and stationary equipment are complying with the established Hydrotesting Procedure, from properties of testing medium to be used, filling up & thermal stabilization, pressurization & stabilization, strength test & tightness test, and dewatering & drying.

Mechanical Engineer à ABV ROCK GROUP KB
  • Arabie Saoudite - Jeddah
  • septembre 1997 à août 2006

• Develop and produce system and sub-system Mechanical Completion Dossiers, Commissioning and Operations & Maintenance procedures. This shall be carried out in accordance with Project wide System Commissioning Manual, Plant Start-up Manual, Manual for Operating Procedures and Manual for Maintenance Procedures. Using guidelines identified within the Project wide Mechanical Completion Manual as per SAUDI ARAMCO standards and procedures.

• Submit of package System / Sub-system to Saudi Strategic Storage Program/Saudi Aramco for approval upon completion of Maintenance Procedures and other attachments such us Data Sheets, Vendor Documents, Manufacturer’s Drawings and related checklist for conducting Maintenance.

• Determine equipment spare parts quantities through Reliability Centered Maintenance (RCM) method, specifically for mechanical equipment and encode the identified spare parts information to SAUDI ARAMCO database.

• Make final evaluation of all mechanical equipment’s Spare Parts List and Interchangeable Record (SPLIR) documents and make necessary computation using Off-Shore Reliability Data (OREDA) reference, as the basis in obtaining the required spare parts quantity within two (2) year operation.

• Identify equipment redundancy and determine the basis of Spare Part Levels for the Vital and Critical System. The level of redundancy will then determine the requirement for complete units or sub-assemblies.

• Determine Contingency Spare parts or complete units for immediate replacement in the event of an emergency. These parts may be required underground to ensure immediate availability. Highlight through the stores system the recommended emergency contingency Spare Parts that will not effect the normal stock rotation and shelf life of the recommended Spare Parts.

• Prepare Structural, Piping, HVAC and Mechanical Equipment scope of works into workable Job Package.

• Estimate Job Package per trade by using the agreed estimating norms.

Senior Mechanical Engineer à CONTINENTAL CEMENT CORPORATION
  • Philippines
  • avril 1995 à septembre 1997

• In-charge in the fabrication and erection of Electrostatic Precipitator (E. P.) structures.

• Supervise the installation of E. P. Internal and External Parts, such as, Cathode Frames, Collecting Plates, Discharge Electrodes, Rapping System, Electric Heating System, Inlet and Outlet Ducts including Perforated Plates and Grills, Hoppers including Baffle Plates, Drag Chain and Screw Conveyors.

• In-charge / Supervise the installation of Roto Packer.

• In-charge / Supervise the fabrication and installation of Bucket Elevator, Pre-heater Cyclones and Spray Tower.

• In-charge / Supervise the rehabilitation of Clinker Cooler.

• Prepare work programs, scope and schedule of works, manpower distribution and materials breakdown.

• Prepare regular reports as appropriate reports to management regarding the status of projects, identifying problem areas which are or may cause departures from established project timetables or affect budget allocations, and recommend necessary corrective actions.

Éducation

Baccalauréat, Mechanical Engineering
  • à University of the East
  • mars 1992
Baccalauréat, Civil Engineering
  • à University of Pangasinan
  • mars 1982

Specialties & Skills

Project Management
Installation Management
Construction Methods
Construction Safety
Cultural Awareness
Project Management in construction for Oil & Gas Industry

Langues

Anglais
Expert
Tagalog
Expert

Adhésions

Philippine Society of Mechanical Engineers
  • Life Member
  • March 1992
Philippine Institute of Civil Engineers
  • Regular Member
  • March 1982

Formation et Diplômes

Incident and Injury free Supervisor Skills (Formation)
Institut de formation:
Qatar International Training Centre
Date de la formation:
May 2009
Practical Leadership (Formation)
Institut de formation:
Qatar International Training Center
Date de la formation:
March 2009
Supervision within Life Critical Activities (Formation)
Institut de formation:
Qatar International Training Center
Date de la formation:
March 2009
Productivity through Planning & Organizing (Formation)
Institut de formation:
Qatar International Training Centre
Date de la formation:
August 2009