Land Surveyor
Almabani General Contractor Company
Total des années d'expérience :21 years, 1 Mois
• Intersection tunnel between MAKKAH Al-MUKARMA road and Salah Uddin Al-Ayoubi road.
• King Abdullah Road Upgrade Western Section Part A and B.
• Drawings should be up to dated according to the latest revision approved by AR-Riyadh Development Authority
• Development of Eastern Part of King Abdullah Road.
• Inspect the Control Points together with AR- Riyadh Development Authority by GPS and levels by auto level machine.
• Managing the Excavation of retaining walls for under passes as per limit along sides of active road.
• Keeping the hard and soft land scape as per designer requirements.
• Extension of the Roads in AR-Riyadh Old Airport
• Took topographical survey inside the old airport area.
• Excavate Tunnels under the Runway of airbase as design of Drawings.
•
• Communicate with consultants for inspections of structures and keep the survey data ready before inspection.
• Alignments and Levels as per client approved Drawings.
• Rehabilitation of Selected Concrete Structures project.
• Responsibly taking the Locations of the Foundations, Drainage Channels and small Bridges above Streams (Canal) including Altitude before Demolition.
• Relocate the Foundations, Floor slabs and Drainage channels to the original Locations as taken before Demolition.
• Make sure the Control points provided by the client are well located inside the safe area of the project.
• Ensure the excavation of the Projects according to the Design as per drawings.
• Drawings should be up to dated according to the latest revision to prevent any kind of company loss.
• Follow all relevant operational procedures and instructions so that work is carried out in a controlled and consistent manner.
• Regularly inspect the durability of control points around the project and make sure control points are cordoning-off by any hurdles,
•
• Keeps accurate notes, records, and sketches to describe and certify work performed
• Coordinates findings with work of engineering and architectural personnel, clients, and others concerned with project.
• Assumes legal responsibility for work and is licensed by client.
• Prepare the Request for Inspection (RFI) always before the time of due work inspection.
• Prepare and submit the necessary reports to management related utilities or any obstacle conflicting with work sites.
• Coordinate with clients on site safety activities, or any amphoteric plans to reduce the cost of work for the company.
• Advising about technical matters and whether the construction plans are viable.
• Producing and/or advising about construction plans and drawing
One Year of Certificate completed on December 2001 from Pakistan Mineral Development Corporation (PMDC).