Roberto Jr Fabros, ARCHITECT ENGINEER  (Project Supervision)

Roberto Jr Fabros

ARCHITECT ENGINEER (Project Supervision)

Al Hadi Engineering, Design and Supervision

Lieu
Bahreïn - Manama
Éducation
Baccalauréat, ARCHITECTURE
Expérience
26 years, 8 Mois

Partager Mon CV

Empêcher usager


Expériences professionnelles

Total des années d'expérience :26 years, 8 Mois

ARCHITECT ENGINEER (Project Supervision) à Al Hadi Engineering, Design and Supervision
  • Bahreïn - Ar Rifa
  • Je travaille ici depuis décembre 2018

Responsibilities:

1. Conduct site supervision and inspection of new building construction under the scope of the Architectural, Structural, Interior Design, and MEP, and others. Ensure all building construction works are carried out in accordance with the approved drawings and good construction practices.

2. Conduct site inspections and attend site meetings with Clients and Contractors at all stages of the design and construction of the project; from validating plot limits prior to the excavation until building completion.

3. Conducts assessment of construction works progress; review and validate contractor requests for progress payments, variations, and claims

4. Conduct surveys and inspections of existing buildings to assess the condition of the building structure.

5. Produce design drawings in 2D for the project that includes Architectural, Structural, MEP, and Interior design layout.

Project Manager à Axion Imagineering General Construction
  • Bahreïn - Manama
  • août 2017 à novembre 2018

Reporting to the ‘Projects Manager’ to the design and build construction company. Responsible to attend during project progress meetings with the Client and technical meetings with the Consultants; to organize procurement; to general site supervision of exterior and interior construction works of the bldg. and finishing; to coordinate works with trades including MEP, HVAC, FF & FAS, external underground services, including off-site fabrication. Review claims by sub-contractors and suppliers for the approval of ‘Projects Manager’. Project type includes restoration, renovation and refurbishment of old palace building including landscape.

Projects handled:
1. HRH Restoration of Old Palace Phases 1 and 2 at West Riffa.

Project Manager à Global Solution Construction
  • Bahreïn - Manama
  • avril 2015 à juillet 2017

Reporting to Clients only. Responsible for the projects full technical coordination.

Projects involved:
1. KHUH (King Hamad University Hospital). Improvement to steam piping layout system.
2. BCFC (Bahrain Credit Facilities Company) 10 storey Headquarters bldg. in Isa Town. Coordination to interior design and fitting out works.
3. Gallery 21 ‘the COURTYARD’ Restaurant at Juffair. Complete decorative design.

Project Manager à Creative Style
  • Bahreïn - Manama
  • octobre 2014 à avril 2015

Reporting to the Managing Director to the joinery and fitting out company. Responsible to attend during project progress meetings with the Client and technical meetings with the Consultants; to organize procurement; to general site supervision of interior construction works and finishing; to coordinate works with trades including MEP, HVAC, FF & FAS, and other services, including off-site fabrication. Review claims by sub-contractors and suppliers for the approval of managing director. Project type includes fitting out of High-End Hotel, restaurants, offices and retail shops.

Projects handled (Art Rotana Hotel at Amwaj Island, Bahrain):
1. WU, ROSSO, Fitness Gym, Fitting-out and refurbishments to external areas.
2. General Areas, Business Centers, Suites and Offices. Supplied furnishing and special features and improvements.

Operations Manager à ELAMES, Behzad Group
  • Bahreïn - Manama
  • juillet 2013 à octobre 2014

Reporting to the ‘Group General Manager’ of Elames (Bezhad Group) a general construction and trading company. Accountable to attend management meetings with company directors and all division business development managers. Responsible to provide construction services to all divisions which includes lighting, kitchens, bathroom and tiles, marble and granite; and including maintenance, improvements and refurbishments to company facilities, buildings and including showroom. Responsible to plan and manage the office, warehouse, workshop and site for daily operations; to organize and manage staff for engineering, estimation, budget and procurement, training, office coordination and site supervisions. Responsible to provide after service to Clients; to review claims by sub-contractors and suppliers for the approval of the group general manager.

Projects handled with BCON:
1. Radisson SAS, Diplomat Hotel, Bahrain.
2. Durrat Al Bahrain, MODEL VILLA, at Petal No. 4,
3. ELAMES Showroom, ‘GESSI’ (high-end) Bathroom fitting showroom at Sitra, Bahrain.
4. Behzad Lighting showroom at Sitra, Bahrain.
5. Exclusive High-End Private Villas at various location, Bahrain.
6. GPIC (Gulf Petrochemical Industries Company) at Sitra, Bahrain

Project Manager à Mohammed Jalal Contracting
  • Bahreïn - Manama
  • novembre 2008 à juillet 2013

Reporting to the General Manger of both MJC and Kontra, a general construction and interior design and fitting out company; also reporting directly to the Client. Accountable to attend during project progress meetings with the Client and technical meeting with the Consultants, and laisse with civil defense and ministry offices and officers. Responsible to plan, organize and manage general site works, procurement, engineering to the actual construction and finishing works for the project; to coordinate works with trades including MEP, HVAC, FF & FAS, external underground services, including off-site fabrication. Review claims by sub-contractors and suppliers for the approval of the General Manager or the Client. Inspection and evaluation of building and real estate property. Project type includes complete building construction, internal and external refurbishment and fitting out to high-end hotel, hospitality clubs, government bldg. and offices, apartments, offices, warehouses, and retail shops.

Project Completed:
1. 8-Storey (5, 600 SQM) Apartment bldg. for African and Eastern. Souq Manama, Bahrain.
2. 4-Storey (8, 220-sqm) Headquarters bldg. & main warehouse (6, 200-sqm) for African and Eastern. Block 952, Raz Zuwayed, Bahrain.
3. The Capital Club Bahrain at L51, L52 & 53 East Tower, Bahrain Financial Harbour, Bahrain.

Other Project Involved:
1. Ritz Carlton Hotel, Bahrain. Landscape and external refurbishment.
2. 10-Storey Ministry of Works office building at Hoora, Manama, Bahrain. Complete construction and fitting out to all levels and offices.
3. 4-storey apartment in Hidd. Inspection and evaluation and property manage.

Project Manager à PICO Bahrain International
  • Bahreïn - Manama
  • juillet 2007 à octobre 2008

Reporting to the General Manger to the fitting out and interior refurbishment. Responsible to attend during project progress meetings with the Client and technical meeting with the Consultants, and laisse with civil defense and ministry offices and officers. Responsible to plan, organize and manage general site works, procurement, engineering to the actual construction and finishing works for the project; to coordinate works with trades including MEP, HVAC, FF & FAS, including off-site fabrication. Review claims by sub-contractors and suppliers for the approval of the General Manager. Project type includes High-End business center offices and exclusive investment banking.

Projects handled:
1. Ventures Capital Bank at levels 6 to 8 Car Park Plaza Bldg., Diplomatic Area, Bahrain.
2. Mont Blanc. Mall Outlet at Bahrain City Center, Seef Area, Bahrain.
3. Dunhill. Mall Outlet at Bahrain City Center, Seef Area, Bahrain.
4. Tashqeel Office at L5 Dream bldg. 1, Adliya, Bahrain.
5. Hertz. Car rental outlet at Arrival Concourse, Bahrain International Airport.

Project Architect à Sysco (Real Estate) Development Corporation
  • Philippines
  • mars 2006 à juillet 2007

Reporting to the sector project manager. Accountable to attend during project progress meetings with the VP Operations. Responsible to plan, organize and manage general site works, procurement, engineering to the actual construction and finishing works for the project; to coordinate works with trades including external underground services, including off-site fabrication. Review claims by sub-contractors and suppliers for the approval of the sector project manager. Project type includes Model units to high-end villa land developments and amenities.
Project Handled:
1. RGV 1 in Malolos, Bulacan (Northern sector)
• approx. total of 4 model high end villa,

2. Florida Villas 1 in Malolos, Bulacan (Northern sector)
• approx. total of 44 units of high end villa, including 4 model villa,
• Repair and rehabilitation of retaining wall to existing provincial dike,
• 70, 000 SQM tracing and construction to infrastructure including land development, underground services and concrete.

ASSISTANT HEAD OF CONSTRUCTION MANAGEMENT DEPT. à Sysco (Real Estate) Development Corporation
  • Philippines
  • janvier 2006 à juillet 2007

Reporting to the VP Operations. Accountable ble to the organization and creation of a new Construction Management Department (CMD) to handle all management and technical matters and issues; accountable as technical adviser to the VP-O with the Company’s Construction Committee (Engineering & Design, Project Planning, Panel Production Plant, Heavy Equipment, Procurement, Construction and Repairs). Review claims by sub-contractors and suppliers for the approval of the VP Operations. Project type includes real estate land development of exclusive compounds with high-end villas and amenities.

Project Handled:
1. Three (3) - Project (provincial) sectors (Northern, Eastern, Southern)
• total of 19 active project sites
• approx. total of 250 units of villas (all active project units)
• Project delivery for actual model houses
2. 75, 000-sq.m. Land development and construction of below grade utilities and roads network for the project site - Florida Villas 1 in Malolos, Bulacan (Northern sector).
3. Improvement on quality and production of the concrete panel pre-fabrication plant.
4. Improvement on the service and operations of the heavy equipment motor pool yard.
5. Organization, Opening and Management of the Construction Management Department of three (3) project managers and twelve (12) project engineers.

Project Manager à Artwood Interiors
  • Bahreïn - Manama
  • juillet 2003 à décembre 2005

Reporting to the Managing Director to the fitting out and interior refurbishment. Responsible to attend during project progress meetings with the Client and technical meeting with the Consultants, and laisse with civil defense and ministry offices and officers. Responsible to plan, organize and manage general site works, procurement, engineering to the actual construction and finishing works for the project; to coordinate works with trades including MEP, HVAC, FF & FAS, including off-site fabrication. Review claims by sub-contractors and suppliers for the approval of the General Manager. Project type includes High-End business center offices and high end villas.

Operations Manager à Arch. Neptali Abarro and Companies
  • Philippines
  • novembre 2002 à juillet 2003

1. CAI. Creative Architectural Impact (AE design and build; Env. compliance consultancy)
2. CARI. Creative Architectural Research Inc. (trading of building finishes and materials)
3. UIS. Ultimate Impact Solution (pest control application)
Unit A, Roma Bldg, Magdiwang Highway, Noveleta, Cavite, Philippines

Reporting to the Owner of the firm and companies; business development and management; manage daily operations of all businesses. Responsible to plan and manage the office, warehouse, workshop, project sites, stores and shop for daily operations; to organize and manage staff for engineering, estimation, budget and procurement, training, office coordination and site supervisions. Responsible to provide after service to Clients; to review claims by sub-contractors and suppliers for the approval of the Owner. Project type includes high-end villas and offices, shops and restaurants and retails shops.

Projects Handled:
1. 2-Storey Villa Residence bldg. for Sps. R. Guttierez; at Gen. Trias City, Cavite, Philippines
2. Beanyard Coffee Café at 3 Level, Robinsons Mall, Sta. Rosa, Laguna, Philippines
3. Environmental compliance services for various industrial companies, Export Processing Zone Area (EPZA), Rosario, Cavite, Philippines
4. Industrial factories at EPZA at Rosario, Cavite, Philippines

Business Developed and Started:
1. CARI Bldg. Material Store Branch at Tanza, Cavite, Philippines
2. CARI Bldg. Material Store Branch at Makati, Philippines
3. Ultimate Impact Solution Company.

Principal Architect à Ar. Roberto Fabros Jr. and Associates
  • Philippines
  • avril 2001 à novembre 2002

Manage the daily operations of the office; business development and management;

Projects Handled:
1. A Private Resort Development (1, 500 SQM) for Ms. Lilia Matabang at Nueva Ecija, Phil.
2. 2-storey Commercial/ Residential bldg. for Mr. Sammy Ang at Nueva Ecija, Philippines.
3. 2-storey residence for Ms. Ma. Lourdes Dacaimat at Angono, Rizal, Philippines
4. Landscape works for the Church of Jesus Christ & Latter Day Saints at Alabang, Muntinlupa City, Philippines.
5. Residential Subdivision Real Estate Development for Spouses Roberto Fabros Sr. at Bo. Lauren, Umingan, Pangasinan, Philippines

Materials Camvasser/ Procurement Personnel à MC Home Depot.
  • Philippines
  • octobre 2000 à avril 2001

Reporting to the Head of Procurement. Ocular Inspection of supplier’s factory and warehouses; monitoring of market prices and business promotions to ensure company’s rate and prices are best in the market.

Architectural Designer/ Project Administrator à Gaite - Gaite Architects and Engineers
  • Philippines
  • mars 1999 à octobre 2000

Reporting to the Owner/ Principal Partner of the firm; produce architectural and construction drawings; estimations and preparation of construction documents for tendering and building permit applications; construction; supervise building construction including project planning and coordination, supervision and administration.

Projects Handled:
1. 2 - Storey Rresidence for Mrs. Maricel Salinda at Moonwalk, Paranaque City, Philippines
2. Penthouse Office for Mr. P Eugenio Colayco at Penthouse Unit, Asian Mansion 1, Makati City, Philippines
3. Merriam and Webster Bookstore Shop Outlet at Riverside Mall, Marikina City, Phil.
4. 4 - Storey Residence Bldg. for Mr. Rufo Cabanlig at Tandang Sora, Quezon City, Phil.
5. 2 - Storey Residence Bldg.. for Engr. Ver Santos at Tanay Rizal, Philippines
6. 2 - Storey Religious Bldg. (Hall of Praise ) for JIL at Timog Avenue, Quezon City, Phil.

Architectural Detailer à Japan Airport Consultants
  • Philippines
  • octobre 1997 à février 1999

Reporting to the Japanese and Filipino architect and engineers and consultant; produce construction drawings

Projects Involved:
1. Nationwide air navigation facilities modernization project - phase 3

Éducation

Baccalauréat, ARCHITECTURE
  • à FEATI University
  • mars 1999
Diplôme, Interior Design
  • à Philippine School of Interior Design
  • mai 1993

Specialties & Skills

CPM Scheduling
Construction Safety
Project Architecture
Project Plans

Adhésions

United Architects of the Philippines Bahrain Chapter
  • Charter/ Founding President
  • April 2011
Philippine Professional Organization Bahrain
  • Charter/ Founding Vice-Chairman
  • April 2011

Formation et Diplômes

NEBOSH NGC-2 (Certificat)
Date de la formation:
April 2009
ISO 9001-2008, Quaity Management (Formation)
Institut de formation:
Beuareu Veritas Bahrain
Date de la formation:
June 2010
Durée:
40 heures