Rodelito Morata, PAINTING AND INSULATION SUPERVISOR

Rodelito Morata

PAINTING AND INSULATION SUPERVISOR

PREZIOSO EMDAD LLC

Lieu
Philippines
Éducation
Diplôme, Industrial Equipment Installation Technician
Expérience
15 years, 1 Mois

Partager Mon CV

Empêcher usager


Expériences professionnelles

Total des années d'expérience :15 years, 1 Mois

PAINTING AND INSULATION SUPERVISOR à PREZIOSO EMDAD LLC
  • juin 2014 à juin 2016

• Supervision of floor coating and painting job in National Food and Flour, Production and Marketing (NFFPM) ICAD 2 Mussafah Industrial Area Abu Dhabi - UAE
• Supervision of insulation job during shutdown period in GASCO RUWAIS, GASCO ASAB and AL HOSN GAS Abu Dhabi - UAE.
• Supervision of actual execution on cold online insulation at Plant # 19 LNG PLANT - ADGAS Das Island Abu Dhabi - UAE.
• Work permit originator and person in charge of the worksite.
• Material take-off and assessment.
• Verification of all insulation removal and re-fixing according to the scope of work.
• Coordinate with plant operator for priority job to be done to meet the shutdown schedule plan.
• Follow HSE Golden Rules.

PUF INJECTION INSULATION SUPERVISOR à MEISEI INDUSTRIAL CO. LTD
  • Papouasie-Nouvelle-Guinée
  • décembre 2013 à mai 2014

• Supervision of PUF insulation in PNG-LNG EPC3 Project - Client: ESSO Highlands Limited (EXXON Mobil) under the main contractor Chiyoda-JGC Joint Venture (CJJV)
• Preparation of Poly Urethane Foam injection machine and maintenance like changing of pump seals, o ring, temperature sensor, transducer, pressure gauge, high pressure hose fittings, filter, check valve, fluid heater, lubrication oil, circuit breaker, contactor, relay and injection gun repair.
• Monitor the actual execution of PUF injection on site.
• Troubleshoot and repair any error occurred during the operation of PUF machine on site.
• Ensure safety for myself and my colleagues.

TECHNICAL SUPERVISOR à PREZIOSO EMDAD LLC
  • Émirats Arabes Unis - Abu Dhabi
  • août 2013 à septembre 2013

• Supervise online cold insulation trial demo training for ADGAS Das Island Abu Dhabi - UAE.
• Preparation of tools, materials and equipment prior to start online insulation demo.
• Give an instruction to my foreman on how to remove existing insulation materials by using hand tools adequately selected in order not to damage the under layer of pipe protective coating.
• Application of frost prevention hydrophobic gel onto their inner side and all joints of PIR.
• Installation of first layer, vapour barrier, spacers and metal mould prior to inject PUF.
• Removing of mould and installation of final cladding.
• Ensure all works conforms to Project Safety Rules.

WINTECH OPERATOR / PIR FABRICATION SUPERVISOR à PREZIOSO TECHNILOR SAS
  • Algérie - Constantine
  • mai 2010 à décembre 2012

• Supervision of thermal insulation for Cryogenic in New LNG Project Skikda, Algeria under the main contractor (KBR)
• Fully proficient of WINTECH Profiler machine operation.
• Fabricate PIR insulation such as dome head, elbow, reducer and straight pipe cover.
• Troubleshoot and repair electrical/electronic machine in the workshop like MABI Machine, Roller, Lock former, Grover and Swage machine.
• Supervision in fabrication of insulation material in the workshop.
• Supervision of PUF injection on site and PUF Machine troubleshoot/repair.
• Follow the high safety standard as company required.
• Supervision of PUF injection on site and PUF Machine troubleshoot/repair.
• Follow the high safety standard as company required.

PAINTING/INSULATION SUPERVISOR à GS Engineering and Construction
  • Émirats Arabes Unis
  • janvier 2009 à février 2010

• Monitoring of thermal insulation in SALALAH METHANOL PROJECT
• Update daily and weekly painting/insulation progress report.
• Execute and complete work by following procedure and work instruction in accordance with Engineering Quality system requirement under my supervision.
• Adheres to the Permit to Work system and carry out work fully complying with safety precaution and requirement as detailed and directed.
• Read and interpret isometric /structural and other related drawing of particular task assigned.
• Work hand-on-hand with the co-worker to accomplish an effective output of any assigned task.

INSULATION FOREMAN à MEISEI INDUSTRIAL COMPANY Limited
  • Émirats Arabes Unis
  • juillet 2008 à octobre 2008

• Engaged with thermal insulation in PETRO RABIGH OLEFIN PLANT PROJECT under the main contractor JGC Arabia Limited (JAL) in Rabigh, Kingdom of Saudi Arabia.
• Perform necessary preparation of tools and materials for insulation job.
• Measure and cut insulation material to fit for pipe, elbow, tee, reducer and equipment.
• Monitor the actual execution of insulation work on site.
• Ensure safety for myself and my colleagues.
• Follow the high safety standard as company required.

Insulation Supervisor/General Maintenance Supervisor à MEISEI Nigeria Limited
  • août 2006 à octobre 2007

• Supervision of thermal insulation project in Nigeria Liquefied Natural Gas (NLNG).
• Check the tool/equipment before commencing work.
• Supervise the actual execution insulation work on site.
• Execute and complete work by following procedures and work instructions in accordance with Engineering Quality system requirements.
• Adheres to the Permit to Work system and carry out work fully complying with safety precautions and requirements as detailed and directed.
• Read and interpret isometric /structural and other related drawing of particular task assigned.
• Fully proficient of electrical/electronic repair in fabrication shop.
• Follow the high safety standard as company required.

Insulation Supervisor/General Maintenance Supervisor à MEISEI Nigeria Ltd
  • mai 2003 à mars 2006

• Engaged with thermal insulation for Cryogenic in NLNG PLUS PROJECT (Train 4 and 5) under the main contractor of TSKJ Nigeria Limited (Technip, Snamprogetti, Kellogg Brown and JGC) in Bonny Island, Rivers State, Nigeria.
• Provide support as required in preparation of machine and tool inspection to ensure insulation fabrication works are carried out in safe.
• Coordinates to all supervisor requested insulation material from fabrication to ensure the correct delivery to site.
• Supervise the actual execution insulation work on site.
• Supervises fabrication activities carried out in the workshop and ensures availability and operability of all workshop machines.
• Troubleshoot and repair any electrical /electronic equipment in the work shop and construction site.
• Ensures availability of adequate manpower, materials, tools and equipment guided by standard procedures.
• Comply with the safety rules and procedure as company required.

INSULATOR FOREMAN à MEISEI Nigeria Limited
  • juillet 2001 à avril 2003

• Engaged with thermal insulation for Cryogenic of NLNG Expansion Project.
• Moves materials and tools to work area.
• Measure and cut insulation to fit covering surface, using tape measure, handsaw, knives, and scissor.
• Fit insulation around obstructions, joints, nozzles and studs.
• Installation of cladding material for pipe, flange, valve and vessel equipment.
• Adjust work schedules to accommodate urgently required work.
• Ensure workers are complying with the safety standard.
• Monitor accomplishments to meet target schedules.
• Coordinate with supervisors for effective work implementation.
• Operates machine in fabrication shop such as WINTECH Profiler machine and milled elbow machine.
• Monitors all work carried within the workshop/site to ensure that safety rules and regulations are being followed.
• Empowered to stop any operation not following laid down safety procedures.

SKILLED INSULATOR à MEISEI/MARUBENI Engineering West Africa Limited
  • avril 1998 à mai 2000

• Engaged with thermal insulation for Cryogenic of NLNG Plant Project.
• Preparation of material and select type of insulation required such as PIR, Rockwool, foam glass etc.
• Measure and cut to required dimension.
• Application of insulation using appropriate installation method.
• Fit around obstructions, joints and studs.
• Application of primary and secondary vapour barriers, vapour stop for single and multiple layer cold insulation.
• Install sheet metal around insulated pipe and equipment with screws and bonding in order to protect the insulation from weather conditions or physical damage.
• Read and interpret isometric /structural and other related drawing of particular task assigned.
• WINTECH Profiler machine operator.
• Aware the safety rules and procedures.
• Milled elbow machine operator.

Éducation

Diplôme, Industrial Equipment Installation Technician
  • à Euro-Phil Trade Specialists Co.
  • juin 2008

• Installation of industrial motors and control system. • Troubleshoot and repair.

Diplôme, BUILDING WIRING INSTALLATION
  • à Technical Educational and Skills Development Authority (TESDA)
  • mai 2008

• Prepare construction materials. • Perform measurement and calculation. • Interpret technical drawings and diagrams. • Maintain tools and equipment. • Perform housekeeping and observe safety. • Install wiring devices for floor and ground fault current interrupting outlets. • Install electrical lighting system on auxiliary outlets and lighting fixtures. • Install communication, signalling devices and remote control systems on auxiliary equipment. • Prepare electrical power and hydraulic tools. • Perform roughing-in activities for communication and distribution system. • Install electrical protection system. • Commission installed electrical system.

Diplôme, Radio and TV Mechanics
  • à Cebu State College of Science and Technology
  • mars 1995

• Basic electricity. • Fundamentals of Radio Receiver. • Radio Receiver System Principle. • Radio Receiver System Construction. • Troubleshooting and Repair. • Trade Drawing. • Shop Mathematics. • Fundamental of Electronics. • Fundamental of Television. • TV Antenna Designing. • TV Troubleshooting, Repair and Servicing.

Etudes secondaires ou équivalent, SECONDARY COURSE
  • à Puertobello Barangay High School
  • mars 1989

SECONDARY COURSE

Diplôme, PRIMARY COURSE
  • à Puertobello Elementary School
  • mars 1985

ELEMENTARY

Specialties & Skills

Electrician
Polyurethane
Oil Painting
Electronics Repair
Insulation
CUSTOMER RELATIONS
DELIVERY
GRAPHIC DESIGN
MATERIALS MANAGEMENT
MICROSOFT WORKS
SUPERVISORY SKILLS
TROUBLESHOOTING
TÉCNICAS DE SUPERVISIÓN

Langues

Filipino
Langue Maternelle
Anglais
Moyen

Formation et Diplômes

MABI 16-3 OPERATION AND MAINTENANCE (Formation)
Institut de formation:
MABI AG INSULATION MACHINERY
Date de la formation:
January 2004
Durée:
112 heures

Loisirs

  • Air brush painting and design
    * Know how to draw and design using airbrush for vehicle and motorcycle.