Roger Bou Saleh, Mechanical Engineer

Roger Bou Saleh

Mechanical Engineer

erga qatar

Location
Qatar - Doha
Education
Master's degree, Industrial & Manufacturing Management
Experience
17 years, 8 Months

Share My Profile

Block User


Work Experience

Total years of experience :17 years, 8 Months

Mechanical Engineer at erga qatar
  • Qatar - Doha
  • My current job since July 2012

Site Mechanical Eng.

design & site supervision for all MEP work

Engineer at HVAC
  • Qatar - Doha
  • January 2011 to April 2012

January 2011 till present
HVAC Engineer
C.A.T. International Qatar W.L.L.; Doha, Qatar.
NDIA (New Doha International Airport) project.
Client: Bechtel (Overseas Bechtel Incorporated)

Original Project Value: $ 278 Million
Project Description
The Scope of Work consists of final design, procurement, construction, start-up and commissioning of all
elements of the Central Utility Plants for the New Doha International Airport and Utility Tunnel.
The project aim is to supply standby power, fire/potable water and chilled water to the main passenger terminals in addition to other critical buildings namely, the Emiri terminal, Mosque, Cargo Terminal Hangar and associated
facilities, Airline Operations Facility.
Scope of Work
- Coordinate duct installation & insulation between 3 CUPs (Central Utility Plant)
- Procure for all duct & insulation materials.
- Coordinating the installation, testing commissioning & start up of 23 AHU in 3 CUPs.
- Coordinating the installation, testing commissioning & start up of 8 CRAC (Computer Room Air Conditioning) in 3 CUPs.
- In charge of installation & operation of all temporary cooling in 3 CUPs
- Coordinating with sub- contractor for the Chiller insulation in 3 CUPs.
- Coordinating with sub-contractor for chilled water pipes, painting & insulation (cellular glass insulation) in 3
CUPs.
- Assist with the execution & operation of process cooling plant in CUP-2 where a total of 8 chillers with a full
capacity of 20, 000 TR supplying chiller water to various areas in the airport, 8 cooling towers single speed fans, 8
primary chilled water pumps, 8 condenser pumps, 3 secondary pumps for building AHU's.
- Assist with the MEP works inside the building FM-200 for all the electrical rooms, fire fighting (wet system,
dry system pre-action etc), water supply distribution.
- Assist with the plumbing work inside the building by revising drawings & ordering materials for the related
work.

Project Engineer at OZRAC Engineering NSW Pty Ltd
  • Australia
  • January 2008 to October 2010

January 2008 till October 2010
Project Engineer
OZRAC Engineering NSW Pty Ltd.
Projects worked on: 7 Oaks St Dee Why, 239 Canley Vale Rd, Canley Heights, 93 Queens St, Five Docks.

Scope of Work
- In charge of all aspects of the project to insure that the completion of the project is done on time & within budget.
- Design, procure & supervise the installation of HVAC system, for commercial and residential complexes.
- Review tender documents, study plans and specification for design and pricing of projects.
- HVAC system includes everything from car park exhaust, mechanical ventilation & air conditioning installation.

Design Engineer-Sales Consultant at ROGER BOU SALEH.doc
  • Australia
  • January 2007 to January 2008

ROGER BOU SALEH.doc
January 2007 till January 2008
Design Engineer-Sales Consultant
Cosminc Air, Brisbane-Sydney Australia.

Scope of Work
- Design, procure & supervise the installation of air conditioning system, for commercial and residential
complexes.
- Review tender documents, study plans and specification for design and pricing of projects. (supply & install of ducted systems)
- I was responsible to coordinate and follow consultancy works with M/S MIRVAC establishment; one of the well known construction companies in Sydney specialized in construction of residential, commercial, offices
buildings & Shopping malls; I was in charge of looking after all there residential clients.

Mechanical Engineer at M.E.A.S
  • Lebanon - Beirut
  • January 2005 to July 2005

Jan 2005 Operation & Maintenance MEAS Middle East Airport Services, Lebanon.

operation and maintenance on all MEP disciplines at BEIRUT International Airport

Education

Master's degree, Industrial & Manufacturing Management
  • at (UNSW) University of New
  • July 2006

2005-2006 Master of sciences in Industrial & Manufacturing Management - (UNSW) University of New South Wales, Sydney Australia.

Bachelor's degree, Mechanical Enigeer
  • at Balamand University
  • January 2005

2001-2005 Bachelor of sciences in Mechanical Engineering - Balamand University, Lebanon.

Specialties & Skills

Procure to Pay
Air Conditioning
Mechanical Testing
Project Coordinating
Plant Commissioning
AIR CONDITIONING
CELLULAR
CHILLED WATER
CHILLERS
ENGINEER
EXHAUST
MAINTENANCE
PRICING
PROJECT ENGINEER

Languages

Arabic
Beginner
English
Expert
French
Expert

Memberships

Lebanese Engineering syndicate
  • Member