رونالدو Dela Cruz, QAQC Engineer

رونالدو Dela Cruz

QAQC Engineer

Arab Engineering Bureau

البلد
قطر - الدوحة
التعليم
بكالوريوس, Electrical Engineering
الخبرات
20 years, 3 أشهر

مشاركة سيرتي الذاتية

حظر المستخدم


الخبرة العملية

مجموع سنوات الخبرة :20 years, 3 أشهر

QAQC Engineer في Arab Engineering Bureau
  • قطر - الدوحة
  • أشغل هذه الوظيفة منذ يناير 2021

• Ensures reference of the approved shop drawings at site at the time of execution.
• Reviews the materials and its approval status.
• Ensures the quality of work at site and if they adhere to the procedure recommended by the manufacturer. Verify compliance with the Method Statement/ITP that was approved by the Consultant.
• Performs material inspection and acceptance procedure.
• Ensures that the material storage at stores comply to safety and the requirements of the specific material.
• Ensure all the materials approved are complying with the project specification and is listed on the project specification.
• Insist on mock-up and their approval prior to proceeding with installation.
• Review for work progress and quality of manpower and prepare reports in case of ambiguity.
• Follow up with the Contractor in preparing Marked up Drawings and have it signed off by the concerned discipline consultant, before As-built drawings are made.
• Have an overview of the quality of safety working practice and housekeeping at site.
• Monitor procurement schedule submitted and the actual facts of delivery of materials at site and update project team on concerns.
• At random, check the project plan and the actual progress and inform site team about concerns (Quality not to be compromised to meet lost time).
• Involve in all the project related meets.
• Develop QA/QC review report which could be used to improve the next project where new strategies could be implemented for improvement.

Quality Engineering Specialist في Parsons International Limited
  • قطر - الدوحة
  • أبريل 2019 إلى ديسمبر 2020

Duties & Responsibilities:

• Performing quality activities on the project/program to ensure that products or services provided are in accordance with customer and Parsons Quality requirements. Regularly interacting with representatives from a variety of functional groups, including program management, design/engineering, purchasing, construction, and other personnel.
• Providing Parsons’ Quality Systems support using the ISO 9001 Standard as the basis for process
development and optimization, procedure development, data collection and reporting, and Quality
Systems training.
• Establishing audit schedule, conducting Quality Systems audits and facilitating associated corrective actions.
• Performing independent audits in various areas (e.g. Engineering, Procurement, Fabrication,
Construction, Operations, Maintenance, Project Management, Material Management, and support
organizations). This includes the audit, survey or surveillance of supplier/vendor/contractor QA/QC
programs to ensure compliance.
• Reviewing documents, witnessing the performance of audited activities, preparing checklists and
agendas for audit, performing audits and assessments of performance, conducting pre-and post-audit
meetings/interviews, and preparing final audit reports in a timely manner.
• Analyzing findings/issues/non-conformances identified during audits to determine program quality and
identify performance trends. Analysis includes all available oversight results, both internal and
external, and trending data.
• Supporting and promoting a uniform Parsons’ Corrective Action/ Preventive Action and Non-conformance tracking program to assure a unified, global system to include tracking of NCR’s, CAR’s, Audit Findings, etc. to assure audited activities meet Parsons’ quality program, and Client quality requirements.
• Promoting safety awareness including adhering to safety rules and requirements.
• Verifies that Parsons and customers’ quality requirements are in compliance with quality standards and quality program requirements for products and services provided.
• Preparing Quality manuals, plans, and/or procedures.
• Reviewing from a quality perspective (and approves if required) documents prepared by internal or external organizations such as quality manuals and procedures, technical deliverables, test plans and procedures, purchase orders, and subcontracts.
• Performing statistical process control.


Specific Job Role: (Quality Assurance Support Service to United States Army Corps of Engineers)

•Providing quality assurance oversight to Shield5 Program sites
• Participating in the USACE Three-Phase Control process to assure that the contractor is adequately conducting the required Preparatory, Initial, and Follow-up phased control processes
• Performing on-site technical surveillance, oversight, and assessment of projects. Confirms that remedies are performed as designed.
• Preparing daily QA reports, documenting project details, actions taken, items inspected, project status, issues, photo log, deficiency log, workforce breakdown, safety, security, etc. into RMS.
• Preparing digital photo documentation to include photos of site(s) and building(s) under investigation, field activities, and sample locations and place into RMS.
• Attending and supporting meetings and teleconferences, as required
• Documenting pre-final inspection findings in a pre-final inspection report and do the same for final inspection.
• Closely monitoring of Discrepancy Non-Compliance Log/Non-Compliance Notices (DNC/NCNs) status in RMS
• Providing input and verifying accuracy of the contractor’s reports in RMS
• Observing key project inspections and verify results in RMS
• Review site reports and submittals for accuracy and quality standards.
• Reviewing of contractors’ pay requests and percentages completed.
• Reviewing and recommending for responses to RFIs.
• Reviewing and recommending for responses to submittals.

Quality Engineer في Johnson Controls International
  • قطر - الدوحة
  • مايو 2011 إلى مارس 2019

Duties & Responsibilities:
• Prepared and implemented Project Specific Quality Plan and Quality Control procedures in accordance with JCI’s Quality Management System and Client’s requirement and monitored the performance of subcontractors on all quality matters
• Reviewed Technical submittals as submitted by the Subcontractors and coordinated the approval with the client.
• Reviewed and monitored the close-out of project document submittals.
• Supervised QC Inspectors for the execution of inspection and testing of completed installation as per the approved ITP, project specification, approved shop drawing or contract requirements and led them in other related activities such as material receiving inspection.
• Led and managed a QA/QC team to successfully deliver the construction programme to the required quality standards
• Monitored the close-out of project non-conformance reports (NCRs) and corrective action requests (CARs).
• Monitored the clearing out of snag list / punch items.
• Updated and maintained contract quality registers (work inspection log, material inspection log, NCR log, CAR log, site observation log, equipment calibration log) and constantly monitored their status.
• Ensured that all quality related records are produced, documented and maintained.
• Prepared & presented statistical reports on quality performance and participated on Management Review meeting
• Developed and implemented audit schedules and plans
• Carried-out internal/first party audit within organization and external/second party audit to subcontractors/suppliers to ensure compliance with JCI’s quality management system and contract documents respectively.
• Coordinated requirements for 3rd party audit and liaised with 3rd party certifying body for JCI’s ISO 9001 re-certification
• Conducted quality induction training for newly recruited staff
• Reviewed quality policy for suitability and monitored company performance on quality objectives
• Attended quality related meetings with the client representative and supervision consultant.
• Ensured all quality control documentation is completed and compiled for project handing over
• Monitored construction activities and coordinated quality issues with the project manager, site engineer and subcontractor personnel.
• Identified the training needs and carried out in house quality training to improve skills of employees

Electrical QA/QC Engineer في Mapco LLC
  • الإمارات العربية المتحدة - أبو ظبي
  • أغسطس 2008 إلى مايو 2011

• Prepared inspection and test plans, method statements, quality assurance plans, quality control procedures, operation and maintenance manual and other technical submittals to meet the contract requirements.
• Supervised and led the QC Engineers for inspection and testing of MEP installation/erection as per ITPs, design specifications, drawings or contract requirements and inspection of incoming materials, issue of NCR’s and monitoring of corrective and preventive actions.
• Coordinated with project manager, site engineers, erection/installation personnel as well as consultants and suppliers, liaised and attended inspections with client representative / consultant.
• Participated with TPIA and client’s consultant for the testing and commissioning of Electrical LV Systems (lighting control, lighting and small power), panel boards (MDB, SMDB, FDB), motor control centers, disconnect switches, motor controllers, earthing and bonding, lightning protection, dimming control, generator based emergency power system, HV transformers, RMU, LV and MV switchboards, variable frequency drives, cable continuity, hi-pot and IR testing.
• Prepared and updated site related quality records (work inspection log, material inspection log, NCR & CAR log) and monitored their status.
• Identified training requirements, planned, organized and conducted in house quality and technical training to improve skills of employees, particularly of the newly recruited.

Electrical QC Engineer في Al Habtoor, Murray and Robberts and Takenaka Joint Venture (Main Contractor-JV),
  • الإمارات العربية المتحدة - دبي
  • أكتوبر 2007 إلى يونيو 2008

• Supervised and led the group of QC inspectors for the timely execution of inspection and testing for MEP installations as per ITP’s, design specifications, drawings or contract requirements and inspection of incoming materials, issuing of NCR’s and monitoring of corrective and preventive actions.
• Coordinated with site engineers and other site installation personnel as well as with the consultants and suppliers regarding quality issues observed.
• Prepared and issued feedback report to QA/QC manager to ensure that all QA/QC issues were promptly and completely addressed.
• Liaised and attended inspections with client representative / consultant (DAR and ADPI) and attended internal QA/QC meetings with HMRT JV project.
• Participated in the closing out of snag list / punch items and verified correctness of as built drawings issued by the MEP construction department.

Project Electrical Engineer في Conmech Construction and Development Corporation
  • الفلبين
  • يناير 2007 إلى سبتمبر 2007

• Responsible for coordination of all Technical activities on assigned projects
• Monitors work for compliance to applicable codes, accepted Engineering practices and standards
• Plan, schedule, conduct and coordinate assigned Engineering works
• Ensure effective communication and coordination between all disciplines and all project participants
• Monitors Project accomplishment and prepare weekly and monthly reports
• Prepare Look Ahead Schedules and Forecast
• Prepare Material Submittals for Approval
• Prepare daily accomplishment report, manpower report for monthly billings and claims
• Evaluate subcontractor and supplier’s billings for specialty works and construction materials respectively
• Prepare and collate all submittals required by the contract
• Prepare shop drawings
• Secure necessary permits from local authorities required in the Project
• Coordinate with the Project Manager and Owner for the technical coordination meeting
• Prepare the necessary materials, tools and equipment required in the Project
• Prepare supplier’s cost evaluation and canvassing of materials to be purchase
• Prepare change orders and variations for claim
• Responsible for budget monitoring and trend tracking
• Participate in client/contractor meeting and resolve Engineering Management issues
• Prepare Project Proposals for Electrical works
• Accountable for the successful completion of Engineering projects

Site Electrical Engineer في First Agricultural Resource Management Incorporated
  • الفلبين
  • فبراير 2004 إلى يناير 2007

• Generally responsible for implementations and monitoring of all Electrical related works at site
• Estimates, prepares and assigns the resources such as manpower, materials, consumables, equipment, tools required for all Electrical and related works prior to execution
• Plans and Analyses all possible Construction Methodologies and recommends the best options to the Project Engineer for approval prior to execution at site
• Interprets construction drawings and studies the contract documents and applicable standards or specifications prior to execution of any jobs
• Manage directly and provides Engineering and Technical supports to all of the Electrical work group at site
• Plans the execution of all Electrical related works and coordinate the works to Mechanical and Civil groups
• Coordinate with Client / Consultant’s representative for any site instructions and inspection of works
• Assign targets for accomplishment and ensure targets are met on daily basis for all Electrical groups at site
• Ensures that all the works done are in accordance with the approved construction drawings, contract documents, project specification, and all applicable standards whether local, national or international standards
• Submits Site daily reports, inspection request, estimates and all applicable monitoring reports on regular basis or as required
• Supports the Project Engineer in accomplishing all the goals and targets for the Electrical groups at site
• Ensure that all site works are done according to all applicable Quality standards
• Directly responsible for the safety of all Electrical groups’ personnel of the project by ensuring that the project execution will be done according to all applicable health, safety, sanitary and environmental standards

الخلفية التعليمية

بكالوريوس, Electrical Engineering
  • في Bulacan State University
  • أبريل 2003

Government Scholarship Program

Specialties & Skills

Quality Control
Quality Inspection
Quality Management
Quality Auditing
Quality Engineering
QMS ISO 9001 2008/2015 / Audit / Quality Control / Assurance

اللغات

الانجليزية
متمرّس
الفيلبينية
متمرّس
العربية
متوسط

العضويات

Institute of Integrated Electrical Engineers
  • Regular Member
  • October 2003
American Society for Quality
  • Active Member
  • April 2016
International Register for Certified Auditors (IRCA-UK)
  • Active Member
  • July 2017

التدريب و الشهادات

IRCA QMS Lead Auditor (الشهادة)
تاريخ الدورة:
July 2018
صالحة لغاية:
July 2019
MMUP / UPDA Registered Electrical Engineer (الشهادة)
تاريخ الدورة:
June 2016
صالحة لغاية:
June 2019
On the Job Training (تدريب)
معهد التدريب:
National Power Corporation
تاريخ الدورة:
April 2002
المدة:
250 ساعة
Integrated Management System (ISO 9001, ISO 14001, OHSAS 18001) (تدريب)
معهد التدريب:
3FOLD Training and Consultancy
تاريخ الدورة:
November 2017
المدة:
8 ساعات
ASQ Certified Quality Engineer (الشهادة)
تاريخ الدورة:
December 2016
صالحة لغاية:
December 2019
Seven Basic Tools of Quality (تدريب)
معهد التدريب:
Focal Training and Consultancy
تاريخ الدورة:
July 2013
المدة:
3 ساعات
Quality Management System Internal Auditor Course (تدريب)
معهد التدريب:
Quality Austria Gulf
تاريخ الدورة:
December 2011
المدة:
16 ساعة
Electrical Safety Training (تدريب)
معهد التدريب:
First Philippine Industrial Park
تاريخ الدورة:
April 2004
المدة:
8 ساعات
Environmental Management (تدريب)
معهد التدريب:
Doha Industrial Safety Services
تاريخ الدورة:
July 2011
المدة:
8 ساعات