Involved in beach pull project for 17 kilo metres 18 “ pipe line, sea tie-in, riser, riser clamps installation project (WLP-A to AMCOT), under the supervision of PETRONAS Cari Gali on board DLB Swiber Conquest and DLB Kalinda
Nantong Shang Hai, China
Project
Monitor and observer the ship yard and construction crew to do the installation and fabrication work for new built pipe lay
Kochin and Jam Nagar, India
Project
Involved in Beach Pull Project for 13 Kilo Metres 48” pipe line and SPM (Single Point Mooring) project in Kochi India and 48” pipe line repaired and replacement for Reliance project on board DLB LEIGHTON STEALTH in India.
Brunei and Thailand
Project
Involved in maintenances and hook-up project in Bongkot Field Songhkla Thailand, Champion 7 platforms in Summer Campagn in Brunei Shell
Indonesia, Brunei and Miri Sarawak
Project
Installation of EGRET-01 Plat Form, 20”, 18”.12” 10” and 8” pipe line and riser and risers clamps in Brunei on board
Brunei Darul Salam
Project
Maintenances and hook-up Summer Campaign in various Brunei Plat Form on board Tornado, Bulan Malai and Super Station Three.
Involved in Plat Form, Modules, Jackets, pipeline, top side, riser and riser clamp, sea tie-in on board, DLB 26, DLB 30, Lay Barge 15, DB 20 and DB 52
Page: 05
Best Regards,
Rumpang Gadoh
Anchor Foreman, Deck Foreman, Tower Operator, and Rigger Foreman, Fork Lift Operator, and Scaffolder erector.
CAPABILITIES AND WORKING EXPERINECS
Rigging/Slinging and Heavy Lifting. Signal man and Banks man, Fork Lift driver, Anchor Winch operator, Barge repositioning and Anchor handling.
Experience with Jacket leg s, Plat Form, Modules, Top Side, PLEM, SPM-(Single Point Mooring), Pipe Lines, Riser, Riser Camps, High Voltages Power Cable, Flexible Lines and Tubes, Umbilical, Spool Pieces, J-Tubes, Anchor Chain Tensioning, Pressure Testing, Rigid Spool, Buckled Pipe line Removal, Lifting Clamp, Grout Seal intervention, Scaffolding Erection and Dismantling,
and Marine cargo handling and load transfer from vessel to barges by crane . This activities including Barge preventive, maintenances and up grading.
Up-grade a new AWB-Accommodation Work Barge Perdana Emerald in Labuan Ship yard, monitored sub- contractors and assist them while carry out their duties, both on main deck, around accommodation and inside engine room.(Co-ordinated with Barge Master, Chief Engineer, Field Engineer, and deck crew on duty.
Work scopes: Responsible in rigging/slinging activities. This activities including, Anchor wire installation, anchor wire calibration test, crane testing, Installed of a new pennants wire and wire sockets and anchors pulled tested and sea trial.
Riser and riser clamps, J-Tubes, Spool pieces and Flexible Lines installation on board DSV Seamec Princess
Anchor Chain Tensioning and installation of umbilical, flow line, flexible tubes, electrical power cable, riser, spool pieces, riser clamps, mattress, slippers, sea tie-in and sub -sea maintenances and repairs on board CSV-Armada Hawk and FPSO -Armada Sterling in India and Vietnam.
Hook up project for Synthomer Chemical Plants at Editmetsu,
under the supervision of Foster Wheeler at Pasir Gudang,
Johor Bahru.
Involved in Gas Lift 6 inches pipe line, spool pieces, riser, riser clamps project in Poleng Field PHE-WMO
Involved with hook up project in Mumbai High Seas on DLB Swiber Conquest and 28 inches pipe line, riser, J-tubes, high voltages power cable and top side installation project with Brunei Shell Petroleum on board Swiber Aziz.
Involved in pipe line, spool pieces, riser, riser clamps, sea tie -in, umbilical and 4” flexible tubes installation in Sura Baya on board POE Crane Barge Three.
Pulling in 4”, flexible lines and tubes in Mumbai High Field on board CSV Seamec Three and Jascon-5
Involved in 18”, 30” Modules and Jackets installation in Stavanger Norway and Gulf of Mexico on board DLB-Thialf 102