Rushan Wickramasurendra, Optimization Engineer - Etisalat 100 Node-B Expansion Project

Rushan Wickramasurendra

Optimization Engineer - Etisalat 100 Node-B Expansion Project

Alcatel-Lucent

Location
Sri Lanka - Moratuwa
Education
Higher diploma, Electronics and Communication Engineering
Experience
4 years, 7 Months

Share My Profile

Block User


Work Experience

Total years of experience :4 years, 7 Months

Optimization Engineer - Etisalat 100 Node-B Expansion Project at Alcatel-Lucent
  • Sri Lanka - Colombo 1
  • December 2014 to December 2015

• Prepared neighbor PCR by adding all intra, inter and inter-RAT neighbors to create neighbor work orders.
• Prepared and submitted SSV reports by analyzing the data with X-CAL and Mapinfo Professional.
• Performed counter acts for CS and PS service drops by analyzing the drive test data with X-CAP/Actix analyzers.
• Prepared and submitted SSO analyze reports by analyzing the data with X-CAP/Actix analyzer/ Mapinfo Professional.
• Managed and maintained all the physical parameter changes done on site by arranging subcontractor scope.
• Performed weekly basis worst cell analysis for existing 3G network with ALU 9950 NPO tool.
• Prepared weekly report for Network KPI trends(Accessibility/ Retainability/ Mobility and traffic growth).
• Prepared RNO final reports with the help final drive test data in optimization face and maintained the KPIs.
• Inspected and performed troubleshooting strategies and analysis for customer complain issues.
• Performed daily KPI monitoring with Alcatel-Lucent 9950 NPO.
• Supported the test action plan for ongoing trouble tickets on Mute calls and Water noise issue in existing network.
• Suceessfully executed the test procedures for Femto Cell trial in Etisalat 3G network.

Optimization Engineer - Etisalat 90 Node-B Expansion Project at Alcatel-Lucent
  • Sri Lanka - Colombo 1
  • December 2013 to December 2014

• Reviewed all the TSSR documents for finalize of physical parameters in planning phase.
• Prepared neighbor PCR by adding all intra, inter and inter-RAT neighbors to create neighbor work orders.
• Prepared and submitted SSV reports by analyzing the data with X-CAL and Mapinfo Professional.
• Performed counter acts for CS and PS service drops by analyzing the drive test data with X-CAP/Actix analyzers.
• Performed weekly basis worst cell analysis for existing 3G network with ALU 9950 NPO tool.
• Prepared RNO final reports with the help final drive test data in optimization face and maintained the KPIs.
• Inspected and performed troubleshooting strategies and analysis for customer complain issues.
• Successfully performed trial test for CS and PS UMTS 900 with frequency refarming.
• Successfully performed test cases for Etisalat first FDD LTE trial with 5MHz bandiwidth.

Optimization Engineer - Etisalat 200 Node-B Expansion Project at Alcatel-Lucent
  • Sri Lanka - Colombo 1
  • May 2013 to December 2013

• Performed SSV drive tests for CS and PS services by using X-CALM real time mapping tool.
• Prepared and submitted SSV reports by analyzing the data with X-CAP and Actix analyzers.
• Managed and maintained all the physical parameter changes done on site by arranging subcontractor scope.
• Performed RNO drive test after the pre launch optimization done in single sites.
• Inspected and performed troubleshooting strategies and analysis for customer complain issues.
• Supporting for feature testing in 3G networks upon the customer requests.

Site Supervisor - 135 Node-B Expansion Project at Alcatel-Lucent
  • Sri Lanka - Colombo 1
  • February 2012 to April 2013

• Read technical manuals and literature to stay abreast of new technology.
• BOM and BOQ verification according Scope of Work.
• Managed and verified all the Technical Site Survey Reports after the notice to proceed by customer.
• Successfully supervised end to end Node-B installation of Green Field and Roof Top sites.
• Performed Node-B commissioning and troubleshooting in Alcatel-Lucent 9326 D2U V2 BBU.
• Successfully deployed Alcatel-Lucent 9370 RNCs in WCDMA networks.
• Inspected and performed troubleshooting strategies for equipment failures in WCDMA access network.
• Successfully handled off shore and on shore materials for 3G Node-B Installations.
• Successfully managed and coordinated the subcontractors in 3G rollout process.
• Performed all needed reporting of daily progress in rollout process.

Site Supervisor - Etisalat Turnkey Project of 515 Node-B at Alcatel-Lucent International - World Trade Center
  • Sri Lanka - Colombo 1
  • June 2011 to February 2012

• Successfully supervised end to end Node-B installation in rest of Green Field and Roof Top sites.
• Performed Node-B commissioning and troubleshooting in Alcatel-Lucent 9326 D2U V2 BBU.
• Performed on site walk test and analyze sector swap before perform Single Site Verification drive test.
• Successfully managed DC power distribution box swap in Macro BTS Outdoor sites.

Education

Higher diploma, Electronics and Communication Engineering
  • at Open University - Sri Lanka
  • December 2013

courses: Netlabs Learning Center - Sri Lanka Cisco Certificated Network Associate (CCNA) 2011

Specialties & Skills

MICROSOFT ACCESS
NETWORKING
REPORTS
TECHNICAL WRITING
ENGINEERING
MATERIALS MANAGEMENT
PROGRESS

Languages

English
Intermediate
Hindi
Intermediate