Sabir Ali, Project Engineer Civil

Sabir Ali

Project Engineer Civil

MARK ZONE BUILDING CONTRACTING L.L.C

Lieu
Pakistan - Faisalabad
Éducation
Baccalauréat, Civil Technology
Expérience
33 years, 2 Mois

Partager Mon CV

Empêcher usager


Expériences professionnelles

Total des années d'expérience :33 years, 2 Mois

Project Engineer Civil à MARK ZONE BUILDING CONTRACTING L.L.C
  • Émirats Arabes Unis - Dubaï
  • Je travaille ici depuis janvier 2015

Client : Nimbus Logistic Cargo LLC, Dubai, UAE
Project Title : WAREHOUSE (G+M) STORAGE
Project Location : Techno Park, Jebel Ali Free Zone, Dubai, UAE

AED 8.5 million budgeted project construct on RCC footing & combination of RCC columns and steel structure design. The project consists of five number of warehouse partition, guard & pump rooms, 5 office cabin, 5 workers’ pantry, 5 workers changing room, 5 staff toilet and 5 workers’ toilet total cover area of building 4594 sqm. Five partition of mezzanine floor storage, water tank platform, underground holding tank, 7 car parking & 394-meter boundary walls. Total built up area 6752 sqm

Job profile:
To coordinate with Dubai Municipality, consultants, site supervisors and sub-contractors.
Planning & distribution of manpower as per requirement of site to speed up site activities.
Check the progress & quality of work at the site.
Insure coordination with QA/QC to check the construction stages.
Insure the work according to consultant’s drawings and specifications of Dubai Municipality.
Preparing & monitoring progress report weekly basis.
Review the construction program & plan the duties of personnel according to the construction program
Ensure that supervision personnel are instructed at all stages on task requirements
Coordinate the approval of modifications with the Client.
Advice and issue instructions to the sub-contractor on all corrective action to deviations.

Project Engineer Civil à Home Pride Building Contracting L.L.C
  • Émirats Arabes Unis - Dubaï
  • avril 2010 à décembre 2014

Client : Bloomsbury Trading Fze, Dubai, UAE
Project Title : LABOUR CAMP ACCOMMODATION (G + 4)
Project Location : Dubai Investment Park 2, Dubai, UAE
The project amounting AED 12 million labor accommodation (G+4) 8, 250 sq. meter covered area comprise on RCC frame structure design with Insulated & hollow blocks and construction of 240 rooms for 710 persons, 98 wash, 90 toilets, 89 showers, 18 supervisor rooms, 337 sq. meter dining area, 132 sq. meter kitchen area and other facilities like sewerage, water supply; electrical works, air-conditioning, firefighting system and water proofing.

Client : Real Estate Department Central School, Dubai, UAE.
Project Title : THE CENTRAL SCHOOL (ADDITIONAL BLOCK)
Project Location : Al Nahda-2nd, Dubai, UAE
G+2 school project 25546 Sft. covered area comprises on RCC frame structure design with Insulated & hollow blocks and construction of 15 class rooms, 6 staff rooms, 3 indoor play areas, 2 supervisor rooms, 7 stores rooms, 2 computer labs, 6 toilet blocks and other facilities like sewerage, water supply; electrical works, air-conditioning, firefighting system and water proofing.

Client : Different Private Owners
Project Title : CONSTRUCTION OF PRIVATE VILLAS, DUBAI
Project Location : Arabian Ranches, Al Mizhar 1 & 2, Al Muhaisnah 3, Dubai, UAE
The projects consist of RCC frame structure villas constructed with sold and hollow blocks, including sewerage systems, water supply systems; electrical works, air-conditioning system and boundary walls.

Job Profile:
To coordinate with Dubai Municipality, consultants, site supervisors and sub-contractors.
Planning & distribution of manpower as per requirement of site to speed up site activities.
Check the progress & quality of work at the site.
Insure coordination with QA/QC to check the construction stages.
Insure the work according to consultant’s drawings and specifications of Dubai Municipality.
Preparing & monitoring progress report weekly basis.
Review the construction program & plan the duties of personnel according to the construction program
Ensure that supervision personnel are instructed at all stages on task requirements
Coordinate the approval of modifications with the Client.
Advice and issue instructions to the sub-contractor on all corrective action to deviations.

Assistant Project Engineer à Citramegah Karya Gemilang (CKG)
  • Libye - Tripoli
  • juillet 2008 à février 2010

Client : 25000 Housing Units Projects Committee, Libya
Project Title : SEBHA HOUSING PROJECT, LIBYA
Project Location : Dar Muhammad, Sebha City, Libya
The project consists of 2363 housing units in 291 multi-stories buildings on RCC frame structure design, constructed with sold and hollow blocks and developing the infrastructure like roads, sewerage systems, disposal stations, water supply systems, gas pipelines & boundary walls.

Coordinate with Project Manager, consultants, construction manager, site supervisors and sub-contractors.
Planning & distribution of manpower as per requirement of site to speed up site activities.
Check the progress & quality of work at the site.
Check and process the running bills of sub-contractors.
Insure coordination with QA/QC to check the construction stages.
Insure the work according to drawings, specifications and variations.
Preparing & monitoring progress report weekly basis.
Define the duties of all supervisors, foremen and other respective staff.
To insure and indent the material according to site requirement in time.
Reviewing all technical issues of the projects.
Supervising the work including conformity to standards / project requirements
Checking and replying all the inspections requested by Sub Contractor
Providing technical solutions / resolution of deficiencies with respect to projects design stages.
Following up the execution of all approved technical studies
Presenting Progress reports of all assignments to the department manager and preparing all necessary reports, corresponds and internal memorandums of the department
Updating the construction manager about weekly Progress
Preparing the immediately required sketches on Auto Cad and issuing to the Contractor
Checking the concrete and reinforcement on site.
Attending the weekly meetings with consultants
Preparing the snags lists

Sub Divisional Officer (B&R) à DHA Construction Company
  • Pakistan - Lahore
  • mars 2005 à juillet 2008

Client : Defence Housing Authority (DHA), Lahore, Pakistan
Project Title : 258 DHA VILLAS
Project Location : Phase VIII, DHA Lahore, Pakistan
The project comprise of 258 double story independent housing units and developed the infrastructure for it like roads, sewerage systems, water supply systems, gas pipelines & boundary walls.

Client : Defence Housing Authority (DHA), Lahore, Pakistan
Project Title : DEFENCE DEGREE COLLEGE
Project Location : Phase V, DHA Lahore, Pakistan
The double story project 123, 000 Sft. covered area comprise on RCC frame structure design with sold bricks and infrastructure of all types, developments and construction of 36 class rooms, 18 labs/techs, 4 halls, 42 offices, 14 store rooms, 8 library and other facilities.

Client : Defence Housing Authority (DHA), Lahore, Pakistan
Project Title : EXPANSION OF JAMIA MOSQUE
Project Location : Phase 1, Block E, DHA Lahore, Pakistan
The double story project 85, 000 Sft. covered area comprise on RCC frame structure design with sold bricks and expansion, developments and construction of prayer halls, wash rooms ablution places and other facilities.

Construction Manager/Project Engineer à Muhammad Saeed & Co.
  • Pakistan - Faisalabad
  • décembre 1999 à février 2005

Client : Local Government, Punjab Government & Private Owners
Project Title : VARIOUS PROJECTS
Project Location : Faisalabad & Lahore, Pakistan

The different projects comprise of structures like as infrastructure of all types, developments and construction of various other facilities.

Site Engineer à MYKAB Joint Venture
  • Pakistan - Quetta
  • novembre 1996 à novembre 1999

Client : Public Health Engineering Department, Kharan, Balochistan, Pakistan
Project Title : KHARAN WATER SUPPLY SCHEME
Project Location : Kharan, Pakistan
Water supply scheme consists of 42 kilometre distribution, force main and main water lines of 75mm to 300mm diameters. The project embraces of structures like 40, 000 gallons overhead water tank, two 10Cfs. capacity pumping stations and a workshop building.

Client : Public Health Engineering Department, Kharan, Balochistan, Pakistan
Project Title : KHARAN DRAINAGE SCHEME
Project Location : Kharan, Pakistan
Drainage system consists of 42.5 kilometre block masonry drains of 225mm to 3000mm widths and construction of various facilities like RCC slabs over drains, RCC culverts and RCC outfall structure.

Site Engineer à Build Strong Engineers
  • Pakistan - Sialkot
  • août 1995 à octobre 1996

Client : Army Housing Directorate GHQ, Rawalpindi, Pakistan
Project Title : ARMY OFFICERS HOUSING SCHEME
Project Location : Sialkot Cantt, Pakistan
The project consists of structures like as infrastructure, developments (sewerage, water supply and gas pipeline) and construction of 41 Semi Detached double storey independent housing units.

Sub Engineer/Surveyor à Khawaja & Asim Associates
  • Pakistan - Faisalabad
  • mai 1994 à août 1995

Client : Daewoo Corporation, Pakistan
Project Title : LAHORE-ISLAMABAD MOTORWAY (M2) SECTION-II
Project Location : Sial Mor, Pindi Bhattian, Pakistan

The project comprises of structures like as earth embankments, causeway, box culverts, sub bases and sub grades of three kilometer M2 Section-II, Sial Mor, Pindi Bhattian.

Assistant Surveyor à GEONEX Asian Operations (Pvt.) Limited
  • Pakistan - Lahore
  • septembre 1993 à avril 1994

Client : Water and Power Development Authority (WAPDA), Pakistan
Project Title : USAID/WAPDA DISTRIBUTION FEEDERS MAPPING PROJECT
Project Location : Districts of Gujranwala, Lahore, Faisalabad & Hafazabad, Pakistan
The project of WAPDA to survey the Power Grid stations and the feeder lines throughout Pakistan. GEONEX, a US based company that provides a wide range of data conversion and computerized mapping services, helped WAPDA computerize and store GPS data of country-wide electrical installations. The goal of the project was to provide a solution, with visual maps and reporting capabilities, to electrical engineers and planners, for better capacity planning and scalability

Supervisor Engineer à Muhammad Akbar & Co.
  • Pakistan - Faisalabad
  • février 1991 à septembre 1993

Client : Crescent Textile Mills Sargodha Road, Faisalabad, Pakistan
Project Title : ADDITIONAL SHED OF DYING UNIT
Project Location : Faisalabad, Pakistan
The project contain construction of additional shed for dying unit on RCC frame structure and construction of various other facilities after demolishing exiting building..

Client : Crescent Textile Mills Sargodha Road, Faisalabad, Pakistan
Project Title : ANNUAL MAINTENACE OF WORKERS QUARTERS
Project Location : Faisalabad, Pakistan
The project restrain annul repair & maintenance of workers accommodation.

Éducation

Baccalauréat, Civil Technology
  • à Preston Institute of Management, Science & Technology (PIMSAT)
  • septembre 2008

• Bachelor of Technology (B-Tech Hons) Civil session 2004-08 with GPA 3.30 Majors (Transportation Engineering, Fluid Mechanics, Software Project Management, RCC Structure, Engineering Design, Theory of Structure, Material Management, Report Writing, Concrete Technology, Quantity Surveying & Accounting, Industrial Quality Control)

Diplôme, Civil Technology
  • à Punjab Board of Technical Education (PBTE)
  • décembre 1992

Diploma of Associate Engineer (DAE) 3 Years in Civil Technology Majors Subjects (Surveying and Leveling, Strength of Material, Theory of Structure, Railways, Docks & Harbor, Sanitary Engineering, Highway Engineering, Irrigation Engineering, Concrete Technology & Technical Math)

Specialties & Skills

AutoCAD
Site Supervision
Construction Management
Estimation
Primavera P6 Professional R.15.1
PlanSwift Professional 9
AutoCAD 2018
Autodesk Nawisworks 2017
MS Office 2016
MS Project 2016
MS Word 2016
MS Excel 2016

Langues

Anglais
Expert
Arabe
Débutant
Urdu
Langue Maternelle
Hindi
Expert

Adhésions

Dubai Municipality Building Department - Engineering Supervision Section
  • Certified Civil Engineer (G+1) Reg. No: 72932
  • April 2010

Formation et Diplômes

Contract Administration under FIDIC 1987-1999 (Certificat)
Date de la formation:
February 2014
Valide jusqu'à:
February 2014
Managing Project Scope (Certificat)
Date de la formation:
December 2013
Valide jusqu'à:
December 2013
Building Control Electronic System (BCES) (Certificat)
Date de la formation:
June 2013
Valide jusqu'à:
June 2013

Loisirs

  • Cricket, Movies, Current Affair Program