sabir pallivalappil, Electrical Maintenance Engineer

sabir pallivalappil

Electrical Maintenance Engineer

imeco

Lieu
Émirats Arabes Unis - Abu Dhabi
Éducation
Baccalauréat, B.Tec in electrical and electronics
Expérience
13 years, 5 Mois

Partager Mon CV

Empêcher usager


Expériences professionnelles

Total des années d'expérience :13 years, 5 Mois

Electrical Maintenance Engineer à imeco
  • Émirats Arabes Unis - Abu Dhabi
  • Je travaille ici depuis mai 2012

• Controlling day to day site activities by liaising with supervisor and foremen for completing the task within the stipulated period.
• Raise an Inspection Request for material and completed works at site
• Monitor the progress and prepare the accomplishment report and the same will submit to Project Engineer.
• Interact with Client Management and Implementation Management and maintains effective client and customer relations at all levels with client organization.
• Managed, supervised and lead the team of Technicians, Contractors and materials on site.
• Manage shutdown schedules and budgets, and obtain permits for operation.
• Finding out the risk of work and reduce it as per the circumstances.
• Ensure proper safety measure& tackles in the project site
• Installing distribution transformer.
• Controlling all type of HV operations.
• Installing oil switches and ring main unit (RMU REJ603).
• Substation maintenance (33/11 kv ) including HV panels .
• Co-ordinate shut down work of power & Distribution transformers.
• Installation of all kind of electrical LV panels (Main distribution board, Sub-main distribution).
• Laying HV & LV cables.

Project Leader à air mec
  • Inde - Mumbai
  • décembre 2010 à novembre 2011

3) ICICI Bank Bandra Kurla complex, Mumbai.
Location: Mumbai (Maharashtra)
Designation: Project Leader
Period: December 2010 to November 2011
3) Company: POWER BEST ELETRICAL

Project: Electrical installation

MEP Engineer à power best
  • Inde
  • juillet 2010 à décembre 2010

Blue Diamond Mall (Mall Of Joy Alukkas)
Location: Calicut
Designation: MEP Engineer
Period: July 2010 to December 2010
Managerial skills
• Preparation of Schedule.
• Estimation and costing of Scheduled quantities.
• Preparing comparative statement of different agencies/contractors.
• Evaluation of contractors/agencies quotation and ensure the price is reasonable.
• Conducting negotiation meetings.
• Giving proper instructions/ guidelines to complete within dead line.
• Coordinate MEP works with all other works/Activities.
• Checking quality of work and material used.
• Conducting coordinate MEP meetings.
• Find out the sources of materials/ scheduled quantities and procure it on proper time. Find out the risk of work and reduce it as per circumstances.
• Ensure proper safety measures and tackles in the project site.
• Doing office works like inviting quotations and preparing bills, minutes of meeting,
Daily report, monthly report

MEP Engineer à power best
  • Inde
  • juillet 2010 à décembre 2010

installation of electrical devices

Éducation

Baccalauréat, B.Tec in electrical and electronics
  • à mes
  • mars 2010

i got best leader award from IEEE

Specialties & Skills

Electrical
AUTO CAD
ENGINEER
ESTIMATION
MANAGERIAL
MEP ENGINEER
MICROSOFT WINDOWS

Langues

Hindi
Débutant
Malayala
Expert
Anglais
Expert
Tamil
Expert