Facility Engineer
OCS
مجموع سنوات الخبرة :7 years, 5 أشهر
C&W
Responsibilities :
•Operation and Maintenance of HVAC PLANT (2400TR), HT Panel & Breaker (11KV), LT Panel-DBs, WTP Plant, DG System, OWC Plant, STP Plant, Fire Suppression System, Domestic-Irrigation-Flushing System, BMS (HVAC Automation), Electronic Fire Alarm System, Lift Management System, .
•Taking handover of various documents I.e. SLD's of MEP, equipment testing certificates, AMC’s documents, service records etc.
•Preparation of Scope of work for Take over system.
•Make daily and weekend schedule for Soft service and Technical Team.
•Make Daily Report, Weekend Report in PPT, MMR report.
•Vendor Management including the co-ordination for quotations, approval from client
as and when required by the client.
•Operation and Maintenance of AHU, Duct able Unit, UPS, LT Panel-Dbs.
•Taking handover of various documents I.e. SLD's of MEP, equipment testing certificates, AMC’s documents, service records etc.
•Preparation of Scope of work for Take over system.
•Maintain records of daily, PPM and breakdown activities.
•Follow-up & tracking on the prepared preventive maintenance schedule.
•Preparing daily reports & reporting to Client & head of engineering.
•Handling day-to-day complaints regarding Vendor maintenance.
•Initial Snagging of the site and submission of the Snag list to the client.
•Co-ordinating and taking effective Handover from the exiting vendor.
•Resolving issue and queries of client effectively and within the timelines.
•Providing training on regular basis to site technical team in respect to technical services.
•Vendor Management including the co-ordination for quotations, approval from client
as and when required by the client.
•Daily briefing to technicians during shift hand over.
•Keeping track of energy consumptions of all the meters, and taking necessary measures to reduce the total consumptions
Responsibilities:
Effectively Handling Siemens & Schneider Software.
•Handling day-to-day complaints regarding Vendor maintenance, like Siemens & SCHNIDER.
•Operating and Maintenance of Air Cooled Chiller, Total 9 units of 350tr.
•Effectively handling the Air Cooled Chiller on Building Management System and CCTV & FAS.Controlling & monitoring of HVAC System, All Exhaust, AHU, FCU, DG, WLD System and Pressurization Fan
Responsibilities:
•Fully control on Siemens software DESIGO VERSION 5.0 (X-WORKS, RXT10).
•Work on all Siemens product & Software. HVAC commissioning & troubleshooting.
•Preparation programmed of VAV for calibration
Responsibilities :
•Fully control on HVAC PLANT.
•Preparation of GFIM & DAILY HVAC reports.
•Fully control on CENTRAVAC CHILLERS CVHG-1067(Ton- 1150). HVAC AUTOMATION.
•PPM of AHU, CENTRIFUGAL PUMP, COOLING TOWER, Primary pump-6, Secondary
•Pump-8nos Condenser pump-6nos etc. Preserve Temperature of entire building,
•Water Pressure, Cooling tower-water balancing, etc
FIRST CLASS
FIRST CLASS PWD LICENCE NO. 289606