Project Coordination-EVA pharma-R&D building
ECE
مجموع سنوات الخبرة :15 years, 9 أشهر
- Held and attend several meetings with contractors and clients.
- Follow status of project and reporting work progress.
- Review of minutes of meeting and communicate in effective way to distribute information for all stakeholders.
- Documentation control for project documents.
- Review of specs and design drawings
- Site approval of material Submittals and shop drawings.
- Site technically receiving for materials on site.
- Problem solving and conflict resolution.
- Coordination of drawings & different contractors work.
- Review and approving contractor invoices.
- Applying project knowledge areas, tools and techniques needed for project managing success.
- Coordinate of mechanical work and other trades.
Design of infrastructure networks(fire-water & drainage networks) of Shorouk Park.
- Revision of shop drawings for general drainage network of LG factory.
- Revision of shop drawings for general drainage network for schlumberger building.
- Revision of design drawing for infrastructure (storm & drainage networks) for Sumou project in KSA.
-Supervision as consultant site engineer for mechanical works (plumbing, fire fighting network- HVAC, Control and Electricity works) of renovation for Basement, Gym&Spa and Technical Floor.
-Approving submitted shop drawings and material submittals.
- Revision of as built drawings.
- Attend high level meeting with clients and owners.
- Do presentation of progress of works.
- Technically evaluation of executed works through surveys, tests, ....etc,
- Revise and issue invoices and revise it with owner representatives.
- Responsible for shop drawings of infrastructure networks for grand hights project ( water, irrigation, storm & drainage networks).
- Responsible for as built drawings coordinating with many of RFIs related to infrastructure.
- Revise design drawings from design consultant office and submit RFI and RFP.
- Coordinate mechanical underground networks with medium, low voltage cable trenches and existing networks.
- Coordination of piping network and civil foundations.
- Contacting with main head office to clarify site issues and requests for information.
- Making progress reports for executed pipes.
- Revision of invoices of subcontractors for hvac works.
- Supervision of fire fighting piping and duct work with VAV boxes from subcontractors.
- Receiving material on site.
Design of hvac ducts and selection of suitable application for resident applications.
- Quantity surveying of HVAC items.
- Revision of specs and tender documents.
- Supervision of plumbing works for Catania village-sidi abdel rahman
- Supervision of Hvac works in gulf academy and beach club.
- Hand over to other trades and consultants.
- Deal between construction company and project management company.
- surveyor of mechanical items.
- Revision of tender documents.
- Revision of shop drawings.
- Study coordination between mechanical and other trades.
- Making RFI for consultant office.
- Follow up site problems.
Site engineer in Beshay steel for sponge iron BSSI Co. as responsible for:
- Welding processes of carbon steel pipes
- installation of Heat Exchangers and pumps for water treatment plant.
- Review documents of specs and drawings.
- Shop drawing of isometric and P&I.
- Follow up status of work and progress report.
- Supervision of installation of Pumps, fabrication of tanks, Pipes and steel frames sand blasting.
- quality control of welding procedures for pipes.
Examples of working areas are: chipsy factory in October and Cadburry factory in 10 th of Ramadan.