Responsible Instrument Engineer
Enter Engineering
Total years of experience :19 years, 10 Months
o Projects:
Jurassic (34 Production Wells & 9 Gathering Stations)
BGPP (Boysun Gas Processing Plant: 5 BCMA)
MTO (Methanol To Olefin Plant)
o Responsibilities:
- Assigned as Responsible Instrument Engineer with fully technical responsibility for the design,
procurement and manufacturing.
- Had responsibility for the proper design and selection of all instrumentation necessary for the
safe and optimum operation of the asset.
- Performed self-check of all deliverables prior to submission Client for review /approval.
- Reviewed of Vendors Technical Offer for Field Instruments, Coordination, Expedition and
Meeting with Vendors to finalizing Vendor Technical Offer for submitting TBE documents and PO to meet project time schedule plan.
- Reviewed of Vendor Prints (after PO) for Field Instruments.
- Coordinated with subcontractors, third party consultants, vendors, etc. to ensure timely review of documents and those comments are made with required quality level.
o Project:
Sepehr-Jufair Oil Fields Development (36, 000 Barrel/day); Ahwaz, Iran
\{17 New Oil Wells & 4 New Manifolds; Revamping of Existing 4 Oil Wells & Revamping of Existing Cluster; Modifications and Metering in existing facilities of West Karon Production Unit (WKPU)\}.
o Responsibilities:
- Led of 5 I&C Engineers for review of Basic, Feed & Detail Instrument and Vendor Documents:
WHCP - HIPPS - SAS /Control Systems (DCS/PCS - ESD - F&G) - Oil Fiscal Metering Package & Prover (Ball type) - Multi-Phase Flow Meter and Field Instruments (Gauges, Transmitters, Choke
Valves, LBV, On/Off Valves, Control Valve, MOV, Pig Alert, Corrosion/ Erosion devices, …).
- Developed engineering documents in a manner that the design intent can be interpreted correctly in new and existing area.
- Conferred with Process, Safety, Piping, Mechanical, Electrical, Civil & HVAC departments for timely release and approval of drawings/ documents.
- Had Coordination and Expedition & Meeting with Vendors to ensure compliance with specifications & requirements and participate in test activities/FAT.
- Prioritized activities to effectively manage conflicting deadlines to meet key milestones and
deliverables.
- Had close communicate with Client to consider all project requirements and assigned tasks with accuracy within project time schedule.
o Projects:
ABS & Rubbers Feed Pipeline Facility Project; Assalouyeh, Iran - (EPC)
Bid Boland Gas Treating Project; Bid Boland, Iran - (EPC)
Mechanized Sulphur Storage and Exporting Jetty; Mahshar, Iran - (EPC)
Siraf Methanol Terminal Offshore Export Facilities; Bandar Dayyer, Iran - (EPC)
Oil Storage Terminal (29 Tanks) and Jetties 3 & 4/5/6; Bandar Abbas, Iran - (EPC)
Jetty No.2 Bandar Imam, Petrochemical Liquid Facilities; Mahshar, Iran - (PC)
South Pars Gas Field - Phases 20, 21 (SRU); Assalouyeh, Iran - (C)
Ilam Petrochemical (Olefin Plant); Ilam, Iran - (C)
o Responsibilities:
- Ensured activities are completed with consistency and in compliance with applicable codes, standards and regulations.
- Prioritized activities to manage conflicting deadlines to meet milestones and deliverables.
- Had Motivation to improve technical competencies for current and future work assignments.
- Promoted continuous improvement by maintaining/sharing the latest industry developments.
- Apply and capture applicable lessons learned in the execution of activities to enable information
sharing, increase project efficiencies, and support /develop best practices.
- Led of I&C Engineers for Design Review and Modification of Basic & Detail Instrument Documents and Procurement documents (MR, TBE) and Reviewing of Vendor Documents:
SAS /Control Systems (DCS/PCS - ESD - F&G) - Fiscal Metering System - Tanker Metering System - Tank Gauging System - Field Instruments - Weigh Bridge System - Marine Loading Arm - Hose Towers - Gangway - Foam, Argon and Fire Water systems.
o Project:
Utility Area, South Pars Gas Field - Phases 9&10; Assalouyeh, Iran
Main Utility Units of this project are:
(6 Boilers - Nitrogen Package - Air Compressors - Sea Water Inlet - Water Treatment Packages - Cooling Water Packages - Waste Water Treatment - Fire Fighting - Emergency Diesel Generators & 2 ITR’s (Instrument Technical Room) & CCB (Central Control Buildings)).
o Responsibilities:
- Reviewed of Project/Vendor documents for SAS /Control Systems (DCS/PCS - PSD - ESD - F&G) - Steam Boilers - N2 Package - Instrument Air Compressors - Water Treatment Packages - Cooling Water Packages - Waste Water Treatment, ….
- Supervised of Instrument activities on Site during construction and pre-commissioning.
- Prepared reports, check lists, punch lists and monitored mechanical completion via TOTAL ICAPS.
- Prepared of MTO/ BOQ from Drawings to make database for construction work.
- Prepared of Technical Query in case of discrepancy between Drawings/Materials and Site.
- Prepared of Field Shop Drawings & As Built Drawings.
- Prepared of Final Project Documents (MC Dossier) at the end of project.
o Project:
Gas Compressor Station (MAN Ferrostaal);
Main Process Units of this Site are: Oil Associated Gas (2 LP Pipelines - UG Slug Catcher -
Filter Separators - LP/MP Compressors) And Natural Gas (1 HP Pipeline - UG Slug Catcher - Filter Separators - 4 HP Compressors) And DPCU (Dew Point Control Units) for Gas.
o Responsibilities:
- Had Site Supervision and Reviewed of Project /Vendor documents.
- Supervised of Calibration and Test of E&I activities on Site and Record as per QC/QA Formats.
- Prepared of Final Project Documents (MC Dossier) at the end of project.
Electronic Engineering