Piping Designer
TAM Iran Khodro
Total years of experience :14 years, 2 Months
Preparing designs and drawings using project specifications.
Generating 2D drawings and 3D Computer Aided Design (CAD) design models.
Then ensured of accuracy and compliance with codes and design data.
TAM Iran Khodro Co., Tehran, Iran
July 2013 - Present
Project Title: EPC of Shahrood Coal Washing Project
Role: Piping Designer
Client: Shomal Shargh Shahrood Coal Company
Responcibility: - Prepared designs and drawings using project specifications.
- Provided technical guidance and assistance to Designers and Technicians.
- Ensured accuracy and compliance with codes and design data.
- Generated 2D drawings and 3D Computer Aided Design (CAD) design models.
- Worked with Plant designers and Consultant and managed overall design and technical necessities.
- Reviewed and checked design models and sketches.
January 2013 Project Title: Design, Construction and Runnig of Power Transmitter system for cluster buster of furnace
Client: Ardakan Steel Melting Co.
TAM Iran Khodro Co., Tehran, Iran
http://kahanroba.com
July 2013 Project Title: PC of Ardakan direct Reduction Project
Role: Site Engineer (piping & mechanical)
Client: Ardakan Steel Complex Co.
Responcibility: - Supervision of workshop activities for pre-fabrication of associated piping work.
- Experience in construction, installation, commissioning and start-up of process machinery.
- To study the isometric drawing received from the Designer and to identify the pipe lines and carry out the inspection work.
- Check flow direction arrows on valves; verify that they are properly identified and valves are installed in accordance with flow direction.
- Ensure that pipe supports, hangers and guides have been installed in accordance with the piping drawings and the pipe support details.
- Monitoring the QA/QC Documentation of the Contractors and ensure that all the activities are incorporated to their system on daily basis and can be traced according to our requirements.
- Line check to verify the use of correct material fittings, valves, and supports, prior to hydro test and prepare
punch list for incomplete works, check and closing after the work is done.
- Design, Construction and Runnig of Power Transmitter system for cluster buster of furnace
- Design, Construction and Runnig of Concentrate screening plant
Design and Construction of a 200Watt Vertical Wind Turbine
Sadr San'at Pars Co., Yazd, Iran
May-September 2012
Project Title: Design and Construction of a 200Watt Vertical Wind Turbine
Project Title: Writing a book on this title "PDMS Guide Book".
Running
Ardakan Float Glass Co., Ardakan, Yazd, Iran
March 2010 - April 2012
Project Title: Ardakan Float Glass Project
Role: Site Engineer (piping & mechanical)
Client: Ardakan Float Glass Company
Responcibility: - Supervision of workshop activities for pre-fabrication of associated piping work.
- Experience in construction, installation, commissioning and start-up of process machinery.
- To study the isometric drawing received from the Designer and to identify the pipe lines and carry out the inspection work.
- Check flow direction arrows on valves; verify that they are properly identified and valves are installed in accordance with flow direction.
- Ensure that pipe supports, hangers and guides have been installed in accordance with the piping drawings and the pipe support details.
- Monitoring the QA/QC Documentation of the Contractors and ensure that all the activities are incorporated to their system on daily basis and can be traced according to our requirements.
- Line check to verify the use of correct material fittings, valves, and supports, prior to hydro test and prepare
punch list for incomplete works, check and closing after the work is done.
-
Self-projects
Petro Fulad Bandar Co., Ardakan, Yazd, Iran
March 2013 Project Title: Design, Construction and Runnig of Concentrate screening plant
Client: Iranian Ghadir Iron and Steel Co.
Petro Fulad Bandar Co., Ardakan, Yazd, Iran
Supervision of workshop activities for pre-fabrication of associated piping work.
Study the isometric drawing received from the Designer and to identify the pipe lines and carry out the inspection work.
Check flow direction arrows on valves; verify that they are properly identified and valves are installed in accordance with flow direction.
Ensure that pipe supports, hangers and guides have been installed in accordance with the piping drawings and the pipe support details.
Monitoring the QA/QC Documentation of the Contractors and ensure that all the activities are incorporated to their system on daily basis and can be traced according to our requirements.
Line check to verify the use of correct material fittings, valves, and supports, prior to hydro test and prepare punch list for incomplete works, check and closing after the work is done.
Department of Computer Engineering, School of Engineering, Azad Islamic University ( Science and Research Branch) MSc Mechatronics Engineering
- Department of Mechanical Engineering, School of Engineering, Yazd University BSc (Hons) Mechanical Engineering