Project Engineer
MARAFIQ
Total years of experience :18 years, 0 Months
Manage & Execute EPC Projects in Power & Water production plants.
Execution of EPC Projects @ SWTP, IWTP plants & Sales Gas Distribution Network.
Being Incharge of Electrical & Instrument Yanbu Region I am responsible of
Business Generation of E & I Unit in Western Region of Saudi Arabia.
Responsible for all projects, E & I Shutdown and valve testing awarded in this region
Responsible for Handling & utilizing effectively the E & I Manpower in Olayan Descon Yanbu Unit.
Leading from Front some of the Critical Jobs in parallel with Multiple Clients and meeting their satisfaction.
Some of the currently Projects
YANPET:
Implement the Recommendation of Deep Dive for Instrument Reliability related to Olefins Major Machinery at Ethylene-10 AF-1113009.
Execute 39 Engineering Packages for Plant Change “MOCs” Related to YANPET-2014 T/A.
Olefin-1 ESD Upgrade AF-1313004.
Olefin-1 SIL Validation Design Changes AF-1313000.
Replacement of Pneumatic Level by DCS Level Controller for Ethylene Elevated Flares AF-1313005.
Vacuum System Upgrade Project AF-0613022.
2G-1205 A/C/F Quench Oil Pump upgrade Project AF-1013034.
YANSAB:
Density Flow Meter on ML Transfer Pump “P-4622B” Discharge AF-1218020.
New 12” On Off Valve for Wax Wash Flash Vessel “V-4616” Top Vapor Line AF-1218021.
Standby for Warm Flare Blow down Pump P-1901S AF-1018029.
MV Cable Replacement job in YANSAB.
Auto Stroke System for Amine Dosing Pumps AF-1118012.
New Sampling Points for Cryogenic Tanks TK-7501/02/03 AF-1018028.
Additional Lighting for Illumination at Olefin Plant AF-1018026.
IBN RUSHD:
Upgrading CTA/PTA Piping AF-1334001.
Replacement of Acetic Acid Columns C-141, C-142 & Re-Boiler E-142 Up-gradation AF-1034025.
NIGC:
Control Valves Overhauling @ NIGC-Yanbu
SAMREF:
WE-1 FCC Reactor and Regenerator Upgrade Project. WE-3 Waste Heat Boiler Economizer Project ( Mech T2 & T5 packages of SAMREF-2013 Major Turn Around )
2013 Turn Around Pressure Safety Valves Overhauling ( Samref-2013 Major Turn Around )
MARAFIQ:
On Call Contract for Medium & Low Voltage Cables, Transformers, Switchgears PO # 7300004208 (Marafiq T & D Department-Yanbu; It’s a long form contract of 3 Years starting 2012).
Valve Testing in ODICO Workshop:
Testing of Manual Valves, ON OFF Valves and MOVs for Yanbu Export Refinery Project YASREF.
Shop Hydro Testing of ZV Valves for SKEC/YASREF ( EPC-2 ) Project.
Valve Hydro Testing of YASREF with Dielim EPC-3
Some Of the Major Jobs Executed as Project Incharge are
Electrical and Instrument Job Of EPC LSTK Reactor R-4 and Utility Upgrade project @ SABIC R & T Riyadh.(Nov 10-June 12)
Electrical and Instrument Job @ Magnesite Mine Facility & Process Plant, Madina.(Sept 09-Sept 10)
Unit 64 Panel Up gradation Project @ Yanpet, Yanbu (June 09-Aug 09)
Instrument Work @ NUYYIM ASL Crude Increment Facilities, Riyadh (Dec 07-May 09)
Calibration of Field Instrument of PE Plant @ SHARQ, Jubail. (Nov 07-Dec 07)
DCS Up-grade Project @ Al-BAYRONI, Jubail. (Oct 07-Nov 07)
AR-RAZI 1 Control System Up-grade Project, Jubail. (Feb 07-Oct 07)
Software trainings on Primavera Project Planner P3, in house software’s as Document Control System DCS, Gainful Deployment of Manpower System GDMS, Gainful Deployment of Equipment System GDES, PROCESS.
Training assignment to Projects as KOHAT CEMENT FACTORY & MANGLA DAM RAISING PROJECTS
Nazeer Humaira Gold Medal during Engineering. Internship at PAKISTAN TELEVISION