saifur rahman sauqlain, Saudi Aramco Project Quality Supervisor

saifur rahman sauqlain

Saudi Aramco Project Quality Supervisor

TUV Rheinland

Lieu
Inde
Éducation
Baccalauréat, electronics and communication
Expérience
12 years, 6 Mois

Partager Mon CV

Empêcher usager


Expériences professionnelles

Total des années d'expérience :12 years, 6 Mois

Saudi Aramco Project Quality Supervisor à TUV Rheinland
  • Arabie Saoudite - Dhahran Al Janoub
  • Je travaille ici depuis septembre 2022
Qa/qc Manager à MMR
  • Arabie Saoudite - AlKhafji
  • juillet 2022 à septembre 2022
Saudu Aramco Telecom PID inspector à intertek
  • Arabie Saoudite - AlKharj
  • février 2022 à juin 2022
Saudi Aramco GIS Quality Supervisor à Intertek
  • Arabie Saoudite - Khobar
  • mai 2018 à septembre 2019

Main objective of job was to coordinate and Monitoring to ensure correct implementation of QC activities by contractor on field, To lead the team of QC Inspectors for monitoring the on‐going daily construction activities by contractor, Reviewing and approving Project Quality Plan, Method of statement, Inspection and Test Plan, Project Operating Procedures and technical submittals., Coordination with SAPMT about any non-conformance and ensuring its correction before its ACD., Approving Contractor Quality Personals, and ensuring their proper involvement on projects. Monitoring RFI’s raised by the Contractor to verify the work as per Project specification, Approved IFC, Applicable standards & Schedule Q. Direct participation on QMS audit, and evaluating its finding and ensuring proper implementation of CARs, Monitoring Regular surveillances of the team assigned for construction progress as per the requirements of project specifications & applicable standards, Escalation of non-compliance by the Contractor / SAPMT observed on site by issuing Pro-active Notification, standard Violation, NCR’s, Worksheets depending on the criteria of violation as per SAEP 381, Preparing monthly Contractor’s PQI, Design phase PQI, IAI, PII. Consolidating the unit reports for section meeting (Monthly) Consolidating the weekly accomplishment report. Preparing & consolidating weekly highlights for conference calls with senior management.

Telecommunication QC Supervisor à ARKAD Engineering and Construction
  • Arabie Saoudite - Khobar
  • novembre 2015 à mars 2018

To lead the team of QC Inspectors for monitoring the on‐going daily construction activities.
Reviewing the construction method statements and making comments per project specifications, Procedures & ITPs.
Regular site visits for foreseeing the potential deficiencies based on his physical experience to share with construction crew and guidance to QC Inspectors.
Close Supervision to Telecommunication QC Inspectors with regards to installation, testing & pre‐commissioning of all telecommunication scope of works.
Monitoring and updating the calibration of all Telecommunication testing Equipment.
Coordination to Client’s Telecom connection lines with regards to Outside & inside Plant interconnections as well as Premise Distribution System (PDS) installation.
Imitating internal Log Book Entries/NCR’s to construction crew for effective implementation of project quality plan, ITP’s, written procedures, project specifications, IFC drawings etc.
Coordination with Clients inspectors for getting the feedback for open log book entries and preparations of corrective actions to close those violations.
Emphasizing on the control of documents and records by advising the document controllers, QC Inspectors.
Conducting routine internal meetings with QC inspectors for further vigilance to the potential problems which must be tackled accordingly to avoid non‐conformities.

Telecommunication QC Engineer à Binquraya
  • Arabie Saoudite - Dammam
  • septembre 2014 à septembre 2015

Preparing two week look-ahead inspection Schedule & weekly Quality report to submit to Saudi Aramco inspection department.
Raising RFI (Request for Inspection) through QMIS (Quality Management Information System) to Notify PID for Inspection.
Authorized by SAPMT/PID to issue NCR (Non-conformance Report) to Construction department for non-conformities.
Reviewing material Requisition (MR), Technical Submittal & Technical queries.
Controlling & ensuring the implementation of Project quality plan and Schedule “Q” at site.
Controlling quality documents and Materials Certificates
Conducting materials receiving inspection of all equipment and Materials required for the project, verifying SATIP (Saudi Aramco Typical Inspection Plan), SAIC, Material Request (MR), Non-material requirement (NMR), Test report, Technical Submittal, Purchase order, Delivery note and ensure that the equipment & Materials are complying with the requirements SAMSS, Schedule Q, IFC drawing and Construction Specification & Scope of work issue for Project.
Installation of MDF and laying of copper communication cable

Telecommunication and instrumentation QC à Energy and Power contracting company Ltd.
  • Arabie Saoudite - Khobar
  • décembre 2011 à juillet 2014

End to end fiber testing, Checking Power loss in fiber, Splicing of fiber,
Network Connectivity, Loop testing. Detection of signaling through FIBRE by the use of OTDR (Optical Time Domain Reflector meter) for exact location of the point where FIBRE breaks and communication fails,
Maintenance of FDF (Fiber Distribution Frame).and Drawing of the path where the fiber is to be laid i.e. ROUTE MAP
Installation, Testing and commissioning of SYMPLEX Fire Alarm System for smoke detector, beam detector, and SF6 gas detector and shutdown of HVAC system
Installation, Testing and commissioning of Gas detection system integrated with OSAS system.
Installation, Testing and commissioning of ‘SAUTER EY module 2’ building automation system for HVAC, battery charger, and exhaust fan based on EY3600 and NOVANET.
8 km long FOC laying and its splicing and termination in substation and control center for power line protection relays, Open Substation Automation System (OSAS), Power distribution department, RTU monitoring, LAN system
Stretching of 1.2 km long NMFOC with overhead transmission lines
Construction of 8 Km long FOC duct bank
Laying of fiber optic cable in underground conduit and its splicing at different pedestal, junction box and patch panels.
Power Meter and OTDR test of NMFOC & OPGW Fiber optic
Providing open transport network (OTN) fiber optic transmission system for Voice and PDD RTU monitoring and control application
Providing telephone line through OTN fiber optic transmission system
Preparation of grounding grid for an area of 1500 SQ meter in substation vicinity.
Installation of 13.8 and 480Kv Switchgear and its peripheral

SCADA In-Charge à Al-Watania poultry power plant ( Al-Rajhi group Saudi Arabia )
  • Arabie Saoudite - AlQasim
  • mars 2010 à avril 2011
Quality control Engineer à Max balaji group
  • Inde - Bengaluru
  • juillet 2008 à décembre 2009

Éducation

Baccalauréat, electronics and communication
  • à MS.engineering college
  • juillet 2008

we made automated rifle project based on VHDL

Specialties & Skills

ethernet ip
Fiber Optics
Quality Tools
Auditing
Quality control & Quality Assurance

Langues

Anglais
Expert
Hindi
Expert
Arabe
Débutant

Formation et Diplômes

ISO lead auditor (Certificat)
Date de la formation:
November 2021
Diploma in SCADA and PLC programming (Certificat)
Certified Quality Manager (Formation)
Institut de formation:
ASQ
Date de la formation:
May 2022
Durée:
40 heures