Salabat Lone, Supply Chain Manager

Salabat Lone

Supply Chain Manager

Imperial Chemical Industries (ICI) Pakistan Limited

البلد
باكستان - لاهور
التعليم
بكالوريوس, Mechanical Engineering
الخبرات
9 years, 1 أشهر

مشاركة سيرتي الذاتية

حظر المستخدم


الخبرة العملية

مجموع سنوات الخبرة :9 years, 1 أشهر

Supply Chain Manager في Imperial Chemical Industries (ICI) Pakistan Limited
  • باكستان
  • مارس 2013 إلى يوليو 2014

Heading the Supply Chain function and responsible for procurement, distribution and warehousing operations worth
52 million USD. Also responsible for developing and managing a team of over 100 members to achieve key strategic
business objectives and delivering top/bottom line growth plans. Main responsibilities include:

• Effective sourcing of raw materials and engineering spares to maximize profitability and decrease variable cost
• Ensuring raw material availability through effective demand forecasting and monitoring production plans
• Managing operating working capital, revenue and budgeting for the overall Supply Chain function
• Managing relations with 1200 suppliers, conducting vendor evaluation, audits and code of conduct compliance
• Managing receipts of raw material from suppliers/ports and dispatch of finished goods to national and international customers through an effective network of transporters
• Maintaining warehouses in compliance with HSE standards
• Monitoring stock levels, warehousing processes and activities (FIFO, stock issue, receipt and dispatch)
• Developing projections of raw material prices to enable the Finance function to carry out short and medium
term profitability analysis
• Development and sourcing of packaging material to meet production demands
• Managing all contracted services for dispatch and warehouse operations

Maintenance Manager Power Services في Imperial Chemical Industries (ICI) Pakistan Limited
  • باكستان
  • مارس 2010 إلى مارس 2013

Responsible for maintaining rotary and stationary equipment of the utilities plant in a safe and reliable
manner. Main responsibilities include troubleshooting, investigating equipment failures, vibration analyses,
preventive maintenance, developing and implementing capital and reliability improvement plans, condition
monitoring, oil analysis and training and development of maintenance team. Major assignments completed during this role are:
• Implemented condition monitoring and reliability audit system in the power and services areas.
• Prepared reliability improvement plans for critical equipment and implemented them in SAP.
• Ensured inspection and maintenance of pressure vessels as a nominated Pressure Systems Engineer.
• Performed failure analysis of major breakdowns and incorporated recommendations for the same.
• Developed maintenance and capital expense plans for rotary and stationary equipment.
• Conducted major overhauling of Typhoon and Solar Centaur T40 gas turbines.
• Carried out HP blade life enhancement project on Typhoon gas turbine.
• Carried out boiler refurbishment and tube replacement project of16 tph boiler.
• Planned and executed overhauling of screw compressors and positive displacement blowers.
• Overhauled centrifugal and reciprocating compressors and pumps.
• Trained managerial and contractor staff on technical, managerial and safety related subjects.

Manager Projects & Planning في Imperial Chemical Industries (ICI) Pakistan Limited
  • باكستان
  • يناير 2009 إلى مارس 2010

Involved in designing, cost estimation, feasibility analysis and execution of various projects at the polyester
plant. Was also responsible for generating and completing work packs, conducting daily maintenance
planning and scheduling, executing shutdowns and managing manpower and maintenance contracts.
Major assignments completed during this role were:
• Steered plant maintenance module of SAP and created and updated task lists and functional locations.
• Designed and fabricated flash vessels according to ASME section VIII for optimizing steam system.
• Designed and fabricated warehouse structures and performed stress analysis using Ansys.
• Conceptualized and made solar water heating system for the administration building of the site.
• Performed reliability analysis and calculated Mean Time to Repair and Total Availability of critical units.
• Planned and executed major shutdowns of the plant.
• Prepared work packs, arranged support and issued status / deviation reports for the shutdowns.
• Steered daily maintenance planning & scheduling meetings and planned daily maintenance activities.

Assistant Manager Maintenance في Imperial Chemical Industries (ICI) Pakistan Limited
  • باكستان
  • أكتوبر 2006 إلى ديسمبر 2008

Ensured maximum availability of plant by conducting predictive and preventive maintenance of the equipment. Supported maintenance manager in meeting the departmental KPIs. Also conducted various
projects to improve efficiency and productivity of the assembly line. Major assignments completed during this role were: WORK EXPERIENCE

• Reduced energy cost by optimizing the insulation design of process lines.
• Developed and implemented a comprehensive preventive and predictive maintenance program.
• Assisted maintenance manager in developing maintenance and capital expense plans.
• Conducted a project to reduce electrical load of variable speed machines.
• Designed and fabricated HVAC system for production hall assembly line.

Team Leader Operations & Supply Chain في Pakistan Tobacco Company
  • باكستان
  • يوليو 2006 إلى أكتوبر 2006

Pakistan Tobacco Company also known as British American Tobacco Pakistan (Jul - Oct 2006)

Team Leader Operations & Supply Chain
• Supervised production team in shift operations in order to give timely production according to QA standards.
• Participated in removing bottle necking issues in the production line in order to enhance the production.

Well Completion and Productivity Islamabad, Summer Intern في Schlumberger
  • باكستان
  • يناير 2005 إلى ديسمبر 2005

Schlumberger, Well Completion and Productivity Islamabad, Summer Intern 2005

• Developed hands-on experience of preventive maintenance of Oil & Gas production equipment.
• Participated in the well exploration and completion activities on a rig.

الخلفية التعليمية

بكالوريوس, Mechanical Engineering
  • في Ghulam Ishaq Khan Institute of Engineering Sciences & Technology
  • يونيو 2006

Ghulam Ishaq Khan Institute of Engineering Sciences & Technology Bachelor of Science in Mechanical Engineering

الثانوية العامة أو ما يعادلها, Pre Engineering
  • في Crescent Model Higher Secondary School
  • يناير 2002

Crescent Model Higher Secondary School, Shadman Colony, Lahore 1st Division

Specialties & Skills

Maintenance Management
Project Management
Procurement
Contract Management
Logistics
Contracts Management
COMPRESSORS
ENGINEER
FAILURE ANALYSIS
GAS TURBINE
INDUSTRIAL MACHINERY
MAINTENANCE
PREVENTIVE MAINTENANCE

اللغات

الانجليزية
متمرّس
الهندية
متمرّس
الأوردو
متمرّس

العضويات

American Society of Mechanical Engineers (ASME), GIKI Chapter
  • President
  • January 2003
American Society of Heating Refrigeration and Air Conditioning Engineers (ASHRAE)
  • Member
  • January 2005
Tennis (Member Lahore Gymkhana Club Tennis Team)
  • Member
  • January 2010

الهوايات

  • Tennis
    Played Tennis in Gymkhana and Winnigton Clubs. Participated in various tournaments and won Men's doubles tournament in 2012.