Total Years of Experience: 15 Years, 3 Months
February 2011
To October 2017
Senior Roads & Bridges And Infrastructure Engineer
at Saudi Consultant Engineering Company (Khatib & Alami)
Location :
Saudi Arabia - Riyadh
• Follow up all approved projects according to consultant agreement with ministry of transport to complete items regarding its specification
• Arrangement between consultant members and requests advanced from contractors according to schedule program approved
• Organizing and managing design review, workshops and reports during design phases and construction in site.
• Follow up construction of two simply supported box section prestressed Interchange bridges with length 150 m & 80 m and width 36.5 m
• Construction Five kilometer highway double road with its Infrastructure utilities like storm water pipe lines & sewer pipe line and electrical cables remove.
• Organizing and managing design review, workshops and reports during design phases and construction in site
• Arrangement between consultant members and requests advanced from contractors according to schedule program approved
• Organizing and managing design review, workshops and reports during design phases and construction in site.
• Follow up construction of two simply supported box section prestressed Interchange bridges with length 150 m & 80 m and width 36.5 m
• Construction Five kilometer highway double road with its Infrastructure utilities like storm water pipe lines & sewer pipe line and electrical cables remove.
• Organizing and managing design review, workshops and reports during design phases and construction in site
September 2008
To February 2011
Roads &Bridge And Infrastructure Contractor Engineer
at Saudi Pan Kingdom For Contracting (SAPAC)
Location :
Saudi Arabia - Riyadh
• Construction of two pre-tension bulb tee girder Interchanges as follow.
• Main bridge 4 Spain with 120m length and width 25 m two way with 152 board pile
• Train bridge 1 Spain with 30m length and width 25 m two way with 150 board pile
• Reinforced earth wall(FREYSSINET PANEL) with length1000 m and area 7000 m2
• Follow up the project progress & material supply with manufacturer brochure after approve.
• preparation of owner & subcontractors invoices
• Main bridge 4 Spain with 120m length and width 25 m two way with 152 board pile
• Train bridge 1 Spain with 30m length and width 25 m two way with 150 board pile
• Reinforced earth wall(FREYSSINET PANEL) with length1000 m and area 7000 m2
• Follow up the project progress & material supply with manufacturer brochure after approve.
• preparation of owner & subcontractors invoices
May 2007
To November 2008
Site Inspector
at Geology & Engineering Consultant (SAUDI TECH CO.)
Location :
Saudi Arabia - Riyadh
• Construction of six Voided slab prestress Interchanges.
• Following all Construction stages from excavation to finishing.
• Check shop drawings & bar bending schedules for all elements (foundations & piers & abutments & deck slab & back wall & parapet).
• Check kind of bearing (free, guided and fixed) and location at pier & abutment (dimensions, vertical load, transverse load, movement, rotation) according to articulation layout.
• Following the waterproofing membrane working above deck slab.
• Construction of 60 km High way doubling road 10.8 m width.
• Construction of many Culverts (Box & Pipe) normal and skew.
• Following all Construction stages from excavation to finishing.
• Check shop drawings & bar bending schedules for all elements (foundations & piers & abutments & deck slab & back wall & parapet).
• Check kind of bearing (free, guided and fixed) and location at pier & abutment (dimensions, vertical load, transverse load, movement, rotation) according to articulation layout.
• Following the waterproofing membrane working above deck slab.
• Construction of 60 km High way doubling road 10.8 m width.
• Construction of many Culverts (Box & Pipe) normal and skew.
September 2002
To October 2007
Site Engineer
at AL-MOBITY CO. FOR CONTRACTIN
Location :
Saudi Arabia - Riyadh
• Follow all Construction stages from excavation to finishing..
• Study all projects ( roads & box culverts &pipe culverts & reduce ground water level & retaining walls &Arch crossing …… ) and discus with engineering of deputy ministry for technical affairs
• Construction all maintains works (slope protection & second layer asphalt & traffic paints &sign boards & …… )
• Follow up obstacles in my project (private property, Electric Columns, Telephone Cables …….)
• Study all projects ( roads & box culverts &pipe culverts & reduce ground water level & retaining walls &Arch crossing …… ) and discus with engineering of deputy ministry for technical affairs
• Construction all maintains works (slope protection & second layer asphalt & traffic paints &sign boards & …… )
• Follow up obstacles in my project (private property, Electric Columns, Telephone Cables …….)