Senior Electrical Project Engineer
National Drilling Company
مجموع سنوات الخبرة :36 years, 4 أشهر
in the Engineering & Project Dep. In which I:-
Was part of NDC project team who participated in Engineering & Commissioning phases, for manufacturing 10 Fast moving full automated land rigs from CHINA.(2010-2012).
Was part of NDC project team who participated in Engineering & Commissioning phases, for manufacturing 7 Cluster full automated artificial island rigs from CHINA.(2012-2014).
Was part of NDC project team who participated in Engineering & Commissioning phases, for RIAP (Rig Integrity Assurance Project) 2 offshore rigs ALYASAT & DIYINA.(2014-2016).
Responsible for new EPC projects for supporting Drilling Rigs (Offshore and Onshore Rigs), for the power and control systems ( Top Drives- SCR - VFD - Drilling Watch Systems and all the related control stations).
Responsible for establishing new service contracts for periodic calibration drilling instrumentation systems (H2S, MD/Totco, Swaco, F&G, SLI … etc.)
I was responsible for SCR (Silicon Control Rectifier) DC control upgrading for many Rigs.
I have participated in many PMS (Preventive Maintenance System) tasks creation, to generate daily maintenance tasks, and planed schedule repairs for drilling equipment such as Top Drives, VFD (Variable Frequency Drives) & new computerized control systems of Drilling Rigs.
I have participated in many major maintenance projects offshore & onshore as project engineering management.
I had participated in Turn -Key project of H.V international connection between Syria and Jordan and between Syria and Turkey in the new 230 Kv and 400 Kv Substations and Overhead Power Lines.
I was part of the team who prepared the technical offer of the new N.C.C (National Control Center) of Syria for connecting 52 substations with the power plants and monitor the power flow of the Syrian power network.
I was in the team who executed a full Automation system for 3 Sugar Factories in Syria using Siemens PLC Simatic Step 7 400 system.
During that period I had been trained in Germany and England on Automation Systems involved in such projects ( PLC’s, DCS, Wincc …etc
Responsible for Chemical Injection Control Systems, Water Treatment Systems, and Power & Control Panels for factories and industrial applications.
During this period I had participated with abroad training courses and conferences.
which I was responsible for the H.V transformers and generators of the power station using American Bush control and Siemens control System.
,