RO / Waste Water Treatment Plant Operator
Suido kiko Middle east
مجموع سنوات الخبرة :23 years, 7 أشهر
At Present I Am Working As A Waste Water Treatment Plant Operator In Operation & Maintenance Department On STP (Sewage Treatment Plant) & MBR (Membranes Bio Reactor Plant) At Suido Kiko Middle East Water Company, (National Water Company Project), Jeddah, Saudi Arabia w.e.f 19th December 2011 to Till Date.
Responsibilities under taken in Operation of STP plant:
1. Performed chemical feed, pump adjustments and preventative maintenance.
2. Operated and maintained water plants and the wastewater plant.
3. Conducted process adjustments and change of flow.
4. Managed the daily operation of a Wastewater Treatment Plant.
5. Daily problem solving.
6. Co-ordinate plant operation through & MMI(Man Machine Interface)
7. Fully conversant of process control, flow adjustment, sludge return, sludge wasting, odor control, D.O, B.O.D, Mixed liquor and sludge settle ability etc.
PROJECTS:
1. Al khumra NWC project Jeddah Saudi Arabia- capacity 50000 m³/day(STP)
2. Al Baha valley Ministry of water & Electricity project capacity 300 m³/day (MBR
Worked As A RO Plant Operator In Operation Department On RO (Reverse Osmosis Plant) At Water & Environment Technologies Co. Ltd. (WETICO), Saudi Arabia .w.e.f 2nd October 2004 to 10th October 2011.
Installation and Operation & Maintenance of STP and Reverse Osmosis Plants. Working as an installation, Operation & Maintenance Operator cum Technician.
PROJECTS:
1. RO Treatment Plant Prince Sultan Air Base Al Kharj Riyad, Capacity 8400 m3/day.
2. RO Treatment Plant Doosan Heavy Industrial ( SWC Project) Jeddah Cap 25 m3/day.(Pilot plant)
3. RO Treatment Plant Prince Sultan Walid bin Talal Wadi laban Riyad, Capacity 5000 m3/day.
4. RO Treatment Plant Salwa Qatar Border Capacity 5000 m3/day.
5. RO Treatment Plant Ministry of water & Electricity Abha Aseer. Capacity 5000 m3/day.
6. RO Treatment Plant & Waste Water MBR System Industrial City Development Jeddah. Capacity 10000 m3/day.
Responsibilities under taken in Operation of R.O Plants:
• Installation of Pumps, R.O. Skids and all mechanical equipments related to R.O. Plants
• To detect any deficiency in any of the treatment stages
• Operation and Trouble shooting of Reverse Osmosis Plants
• Preventive Maintenance and Trouble shooting of pumps, Air Compressors, Solenoid Valves, Vacuum Pumps, Air Blowers, Dosing Pumps and PVC and GI lines etc.,
• Initiating manual and automatic Sand Filters Backwashing.
• Initiating Maintenance clean and Recovery clean cycles for MBR’s
• Initiating R.O. Membranes chemical cleaning (whenever required)
• Maintaining the quality parameter and discharging standards
• Manually Backwashing Softeners
• Handling pre and post treatment chemicals
• Reporting to Operations Engineer
• Preparation of weekly, monthly, annual and maintenance reports
• Leading a team of maintenance and supervision of plant operators
• Maintaining daily log sheets and quality systems
• Operation of SCADA systems and PLC’s
Worked As A RO & Waste Water Treatment Plant Operator In Operation & Maintenance Department On STP (Sewage Treatment Plant) & RO (Reverse Osmosis Plant) At Asian Heart Institute & Hospital, Mumbai India. w.e.f 2000 to 2003.
ARTS SUBJECTS
Completed 6 months Vocational Training on Sewage & Water treatment from Ideal Technical Institute Tata, Jamshedpur, India in September 1999