Involved in the Basic as well as Detailed Design Review of Mechanical Systems mentioned hereunder:
• Fuel Oil System, Fuel Gas System, Plant Drainage System, Cooling Water System, Canal
Water Discharge System, Closed Circuit Cooling Water System, Chemical Dosing System,
Cooling Water System, Hot & Cold Reheat Steam System, Compressed Air System,
Condenser Air Removal System, Condenser Cooling System, Condensate System, Cooling
Tower System, Demineralized Water Treatment System, Potable & Service Water Systems,
Feed Water System, Fire Fighting System, Gas Turbine Services System, Hydrogen
Generation System, Heat & Mass Balance Diagrams, HP & LP Steam Systems, HRSG Blow-
down System, Sodium Hypochlorite Generation System, Neutralization System, Water &
Steam Sampling Systems and Well Water Supply Systems.
ASSIGNMENT # 11
WORKED AS MECHANICAL PROPOSAL / ESTIMATION ENGINEER ON CONSTRUCTION OF WAAD AL-
SHAMAL COMBINED CYCLE POWER PLANT PROJECT (960 MW) WITH SAUDI SERVICES FOR ELECTRO
MECHANIC WORKS CO. (SSEM)
MAIN PLANT FUEL: NATURAL GAS (METHANE)
BACK-UP PLANT FUEL # 1: CRUDE OIL (ARABIAN SUPER LIGHT TYPE)
BACK-UP PLANT FUEL # 2: DISTILLATE OIL
PROJECT CLIENT

SSEM HEAD OFFICE at WAAD AL-SHAMAL
  • United Arab Emirates
  • March 2015 to August 2015

• Conducted the surveys of entire project site and surrounding areas to fully assess the
requirements of project and to gather necessary information required for the preparation of
bid.
• Represented SSEM in Pre-Bid and Post Bid Clarification Meetings with Client and prepared
the Minutes of Meetings.
• Preparing Process Flow Diagrams (PFD’s), Piping & Instrumentation Diagrams (P&ID’s),
Mechanical Equipment Layouts, Piping Layouts, Piping Isometric Drawings, Piping Weld-Map
Drawings, Mechanical Equipment Sizing Calculations, Pipe Sizing Calculations, Pipe Thickness
Calculations, Finalization of BOM’s, Selection of Appropriate Valves and Strainers.
• Development of Complete Design Criteria of Oily Water Drainage System wherein all
Drainage Pits Sizing had been justified. Additionally, I have also worked on the selection of
appropriate drainage pumps. Process Flow Diagrams (PFD’s) and Piping & Instrumentation
Diagrams (P&ID’s) were also developed based on Design Criteria Document. Pipe Routing
had been finalized based on which the Head Loss Calculations had been done which became
the basis of Sizing of Drainage Pumps.
2
• Embedded the Addenda issued by Client in Project Technical Specifications and updated the
technical and commercial documents accordingly. Also raised relevant Technical
Clarifications to Client, if required.
• Worked on the Design of Truck Unloading Systems of Arabian Super Light Oil, Distillate Oil
and Raw Water.
• Worked on Pipe Sizing Calculations by executing Head Loss Calculations of Arabian Super
Light Oil Piping, Distillate Oil Piping, Water Piping and Chemicals Piping. Also worked on Pipe
Thickness Calculations.
• Worked on Sizing of Horizontal / Vertical Centrifugal Pumps based on NPSHA Calculations
considering specified NPSHA redundancy over NPSHR, the Flow Rate and Discharge Head
Requirements.
• Worked on the Selection and Sizing of appropriate Strainers depending on the quality of fuel
/ water required at terminal points as specified in the Operation & Maintenance Manuals of
Manufacturers.
• Reviewed the P&ID’s, General Arrangement Drawings and Piping Layouts of Water Pre-
Treatment System including Water Clarifiers, Flocculation, Filtration, Ultra-Filtration,
Chemicals Injection Equipment and Water Storage as well as Pumping Systems.
• Reviewed the P&ID’s, General Arrangement Drawings and Piping Layouts of Reverse Osmosis
Demineralized Water Treatment Plant submitted by vendors and ensured that the sizing of
each equipment in Demineralized Water Treatment Plant is sufficient to fulfill the water
requirements of Power Plant with an operational redundancy as per Project Technical
Specifications and ensured that the DW Treatment Plant produces the water quality as per
specified requirements.
• Determined the Mechanical Equipment and Piping requiring Thermal Insulation and Metallic
Cladding, worked on the selection of an appropriate Insulation Material, calculated Thermal
Insulation Thicknesses varying from system to system and finalized the BOM’s accordingly to
request Techno-Commercial Offers from vendors.
• Reviewed, in detail, the General Arrangement Drawings, Test Procedures, Sizing Calculations
and Inspection & Test Plans of 2 x 20, 000 m³ IFR Arabian Super Light Oil Storage Tanks, 1 x
500 m³ IFR Distillate Oil Storage Tank, a Distillate Oil Day Tank and Water Storage Tanks
designed and constructed in accordance with API Standard 650 and Recommended Practices
specified by API.
• Based on coordinated agenda, I have attended a number of meetings with different vendors
to discuss and finalize, in detail, all technical as well as commercial issues. Based on the said
meetings, I used to raise Pre-Bid Clarifications to Client in order to make the Scope of Work
clear before the submission of bid.
• I had been a part of SSEM Delegation which held a Consortium Meeting with M/S SAMSUNG
C&T held in SEP.2014 in Seoul, South Korea, to discuss and finalize the Division of
Responsibility Document, Technical Bid Documents specifically pertaining to Design.
• Prepared the Lists of Technical Deviations to clearly identify which particular specified
technical requirements couldn’t be satisfied by providing satisfactory justifications of
technical deviations.
• Designed 35 km long AG/UG Natural Gas Supply Pipeline from Interface Point of Saudi
ARAMCO to the Power Plant in accordance with Engineering Code ASME B31.8 (Gas
Transmission and Distribution Piping Systems).
• Designed 10 km long Above Ground Raw Water Supply Pipeline from Interface Point of
National Water Company (NWC) to the Power Plant in accordance with Power Piping Code
ASME B31.1. Also, worked on the Sizing and Selection of Main Raw Water Feed Pumping
Station, Buffer Tank, Booster Raw Water Feed Pumping Station and Water Metering Skids.
• Determined the Types of Electric Overhead Travelling Cranes and of Electric Monorail Hoists
in accordance with the requirements of heavy equipment installed in different power plant
buildings. In addition to this, worked on Sizing of Cranes and Hoists as per Project Technical
Specifications and calculated the Operating Spans, Lifting Heights and Travelling Lengths in
coordination with Civil Drawings.
• Developed the P&ID and Piping Layout of Main Compressed Air System, worked on the
Sizing of Air Compressors and on Sizing of Instrument Air & Service Air Piping.
3
• Worked on the Design and Sizing of Chemical Storage Tanks, Chemicals Feed Pumps and
Chemicals Feed Piping.
• Determined the Piping Systems requiring Protective Coating, calculated the volume of
protective coating required to be applied based on DFT’s specified by the Client and reviewed
the Technical Data Sheets of different types of coatings like Primer Epoxy Coating,
Intermediate Epoxy Coating and Top Polyurethane Coating. In addition to this, proposed
different color schemes for different Mechanical Piping Systems for proper system
identification.
• Developed the P&ID and Piping Layout of Distillate Oil Supply Piping from Distillate Oil Day
Tank to Black Start Diesel Generator (BSDG) System and Fire Fighting Diesel Driven Standby
Pumping System, also worked on Feed Pumps’ NPSHA Calculations and Head Loss
Calculations as well.
• Developed Piping Isometric Drawings and Piping Isometric Weld-Maps of all Mechanical
Systems.
• Worked on the Selection of Valves, reviewed in detail the General Arrangement Drawings of
Ball Valves, Gate Valves, Flow Control Valves, Butterfly Valves and Non-Return Valves and
finalized the BOM’s.
• Developed the P&ID’s and General Arrangement Drawings of Arabian Super Light Oil and
Distillate Oil Truck Unloading System, Storage System, 60 m³/hr Capacity Treatment
System, Tank to Tank Transfer System and Forwarding System. The detailed drawings of
Unloading System, Treatment System and Forwarding Systems had been received from
vendors and incorporated in the Main P&ID’s of Fuel Oil System.
• Analyzed the Piping Systems with respect to flexibility and stress relieving.
• Reviewed the P&ID’s and General Arrangement Drawings of Gas Filtration System, Gas
Heating System and Gas Compression System submitted by different vendors and developed
the Technical as well as Commercial Comparisons to select the most appropriate vendor.
• Reviewed the P&ID and General Arrangement Drawings of Nitrogen Generation System,
Nitrogen Skid Mounted Cylinder Storage System, Nitrogen Supply System for the purpose of
Nitrogen Blanketing of Tanks and Heat Recovery Steam Generators (HRSG’s) and also
Nitrogen Purging of Natural Gas Pipelines.
• Reviewed the General Arrangement Drawings of Indoor as well as of Outdoor Elevators in
accordance with ASME A17.
• Prepared the Technical and Commercial Comparisons of Workshop Equipment submitted by
different vendors.
ASSIGNMENT # 10
WORKED AS MECHANICAL PROPOSAL / ESTIMATION ENGINEER ON CONVERSION OF PP9 “BLOCKS C &
D” EIGHT (8) GTG UNITS FROM SIMPLE CYCLE TO COMBINED CYCLE POWER PLANT PROJECT (704 MW)
WITH SAUDI SERVICES FOR ELECTRO MECHANIC WORKS CO. (SSEM)
MAIN PLANT FUEL # 1: NATURAL GAS (METHANE)
MAIN PLANT FUEL # 2: LIGHT ARABIAN CRUDE OIL
BACK-UP PLANT FUEL: DISTILLATE OIL
PROJECT CLIENT: SAUDI ELECTRICITY COMPANY (SEC)
CONSORTIUM PARTNER: INITEC ENERGIA

SSEM HEAD OFFICE at SAUDI ELECTRICITY COMPANY (SEC)
  • Saudi Arabia
  • December 2013 to February 2013

2015
NOTE: SSEM-INITEC CONSORTIUM DECLARED AS THE LOWEST
PROSPECTIVE BIDDER BY SAUDI ELECTRICITY COMPANY (SEC).
• Worked on the systems mentioned under CONSTRUCTION OF WAAD AL-SHAMAL COMBINED
CYCLE POWER PLANT PROJECT except for Natural Gas Supply System as this system had
been existing and therefore not included in the Scope of Work.
ASSIGNMENT # 9
WORKED AS MECHANICAL PROPOSAL / ESTIMATION ENGINEER ON QURAYAT POWER PLANT EXT. III
PROJECT (154 MW) WITH SAUDI SERVICES FOR ELECTRO MECHANIC WORKS CO. (SSEM)
4
MAIN PLANT FUEL: LIGHT ARABIAN CRUDE OIL
BACK-UP PLANT FUEL: DISTILLATE OIL
PROJECT CLIENT

SSEM HEAD OFFICE at SAUDI ELECTRICITY COMPANY (SEC)
  • Saudi Arabia
  • December 2013 to February 2013

2015
NOTE: SSEM HAD BEEN DECLARED AS THE LOWEST PROSPECTIVE BIDDER
AND EXECUTED QURAYAT POWER PLANT EXT. III PROJECT AS A
MAIN CONTRACTOR.
• Worked on the systems mentioned under CONSTRUCTION OF WAAD AL-SHAMAL COMBINED
CYCLE POWER PLANT PROJECT except for Natural Gas Supply System and Raw Water Supply
System as these systems had not been included in the Scope of Work.
ASSIGNMENT # 8
WORKED AS MECHANICAL PROPOSAL / ESTIMATION ENGINEER ON RAFHA POWER PLANT # 2 EXT. I
PROJECT (77 MW) WITH SAUDI SERVICES FOR ELECTRO MECHANIC WORKS CO. (SSEM)
MAIN PLANT FUEL: LIGHT ARABIAN CRUDE OIL
BACK-UP PLANT FUEL: DISTILLATE OIL
PROJECT CLIENT

SSEM HEAD OFFICE at SAUDI ELECTRICITY COMPANY (SEC)
  • Saudi Arabia
  • December 2013 to February 2013

2015
NOTE: SSEM HAD BEEN DECLARED AS THE LOWEST PROSPECTIVE BIDDER
AND EXECUTED RAFHA POWER PLANT # 2 EXT. I PROJECT AS A
MAIN CONTRACTOR.
• Worked on the systems mentioned under CONSTRUCTION OF WAAD AL-SHAMAL COMBINED
CYCLE POWER PLANT PROJECT except for Natural Gas Supply System and Raw Water Supply
System as these systems had not been included in the Scope of Work.
ASSIGNMENT # 7
WORKED AS MECHANICAL PROPOSAL / ESTIMATION ENGINEER ON CONVERSION OF RABIGH V & VII
SIMPLE CYCLE TO COMBINED CYCLE POWER PLANT PROJECT (MW) WITH SAUDI SERVICES FOR ELECTRO
MECHANIC WORKS CO. (SSEM)
MAIN PLANT FUEL: LIGHT ARABIAN CRUDE OIL
BACK-UP PLANT FUEL: DISTILLATE OIL
PROJECT CLIENT

SSEM HEAD OFFICE at SAUDI ELECTRICITY COMPANY (SEC)
  • Saudi Arabia
  • December 2013 to February 2013

2015
• Worked on the systems mentioned under CONSTRUCTION OF WAAD AL-SHAMAL COMBINED
CYCLE POWER PLANT PROJECT except for Natural Gas Supply System and Raw Water Supply
System as these systems had not been included in the Scope of Work.
ASSIGNMENT # 6
WORKED AS MECHANICAL PROPOSAL / ESTIMATION ENGINEER ON CONVERSION OF QASSEEM CENTRAL
POWER PLANT EXT. II & III TO COMBINED CYCLE POWER PLANT PROJECT (MW) WITH SAUDI SERVICES
FOR ELECTRO MECHANIC WORKS CO. (SSEM)
MAIN PLANT FUEL: LIGHT ARABIAN CRUDE OIL
BACK-UP PLANT FUEL: DISTILLATE OIL
PROJECT CLIENT

SSEM HEAD OFFICE at SAUDI ELECTRICITY COMPANY (SEC)
  • Saudi Arabia
  • December 2013 to February 2013

2015
• Worked on the systems mentioned under CONSTRUCTION OF WAAD AL-SHAMAL COMBINED
CYCLE POWER PLANT PROJECT except for Natural Gas Supply System and Raw Water Supply
System as these systems had not been included in the Scope of Work.
ASSIGNMENT # 5
5
WORKED AS MECHANICAL PROPOSAL / ESTIMATION ENGINEER ON CONVERSION OF HAIL-2 POWER
PLANT SIMPLE CYCLE EXT. III TO COMBINED CYCLE POWER PLANT PROJECT (MW) WITH SAUDI
SERVICES FOR ELECTRO MECHANIC WORKS CO. (SSEM)
MAIN PLANT FUEL: LIGHT ARABIAN CRUDE OIL
BACK-UP PLANT FUEL: DISTILLATE OIL
PROJECT CLIENT

SSEM HEAD OFFICE at SAUDI ELECTRICITY COMPANY (SEC)
  • Saudi Arabia
  • December 2013 to February 2013

2015
• Worked on the systems mentioned under CONSTRUCTION OF WAAD AL-SHAMAL COMBINED
CYCLE POWER PLANT PROJECT except for Natural Gas Supply System and Raw Water Supply
System as these systems had not been included in the Scope of Work.
ASSIGNMENT # 4
WORKED AS MECHANICAL DESIGN ENGINEER ON CONSTRUCTION OF FOUR FUEL TANKS IN QASSEEM
POWER PLANT PROJECT WITH SAUDI SERVICES FOR ELECTRO MECHANIC WORKS CO. (SSEM)
MAIN PLANT FUEL: LIGHT ARABIAN CRUDE OIL
BACK-UP PLANT FUEL: DISTILLATE OIL
PROJECT CLIENT

SSEM HEAD OFFICE at SAUDI ELECTRICITY COMPANY (SEC)
  • Saudi Arabia
  • February 2012 to December 2012

• Developed P&ID of Crude Oil System starting from Interface Points in existing Power Plant
covering all Scope of Work.
• Developed the Design Criteria of Oily Water Drainage System including the complete
information and calculations of Sizing of Submersible Sump Pumps, Sizing of Drainage Pits,
Sizing of Drainage Piping, Selection of Piping Material, Safety Wrapping of Buried Piping etc.
In addition to this, developed the P&ID and designed the Piping Layout of Oily Water
Drainage System.
• Conducted detailed site surveys to locate Interface Points with existing Piping Systems and
also to finalize Pipe Routing.
• Actively participated in Design Review Meetings with Client held on bi-weekly basis,
discussed, in detail, all relevant agenda items with Client’s Engineers and prepared the
Minutes of Meeting.
• Development of Tanks Filling Procedure and Operational Scenarios in coordination with SEC
Operations & Maintenance Department
• General Arrangement Drawings, Fabrication Drawings, Design Calculations, Inspection & Test
Plans, Test Procedures and Protective Coatings of Double Deck External Floating Roof Crude
Oil Storage Tanks in accordance with API 650 Standard.
• Reviewed the P&ID and General Arrangement Drawings of Truck Loading Skids in accordance
with Saudi ARAMCO Standards and Technical Data Sheets of Duplex Basket Type Suction
Strainers, Lever Operated Ball Valves, Diaphragm Operated Digital Control Valve, Swivel
Joint Fuel Loading & Vapour Arms, Couplers for Fuel Loading Arms & Fuel Vapour Arms as
per API RP 1004 and Vapour Treatment System.
• Reviewed the General Arrangement Drawings of Motor Operated Ball Valves, Gear Operated
Manual Ball Valves, Lever Operated Manual Ball Valves and Swing Type Non-Return Valves.
• Sizing of Pressure / Safety Relief Valves as per API RP 520 Part-I.
• Developed Yard Piping Layout Drawings, Piping Isometric Drawings, Piping Weld Map
Drawings, Pipe Support Drawings, Friction Loss Calculations, Pump & Pipe Sizing
Calculations.
• Prepared Process Flow Diagram (PFD), P&ID, Pump Sizing Calculations, Pipe Sizing
Calculations and Design Criteria for Oily Water Drainage System.
6
• Reviewed Welding Procedure Specifications (WPS) and Welding Procedure Qualification
Records (PQR).
• Reviewed the Technical Catalogues of EPDM Gaskets, NBR Gaskets, Semi Metallic Spiral
Wound Gaskets, Ring Joint Gaskets, Metallic Gaskets.
• Reviewed the Technical Catalogues of Bolts as per ASTM A193 Gr. B7, ASTM A325, Nuts as
per ASTM A194 Gr. 2H and Metallic Washers as per ASTM F436.
• Determined the Piping Systems requiring Protective Coating, calculated the volume of
protective coating required to be applied based on DFT’s specified by the Client and reviewed
the Technical Data Sheets of different types of coatings like Primer Epoxy Coating,
Intermediate Epoxy Coating and Top Polyurethane Coating. In addition to this, proposed
different color schemes for different Mechanical Piping Systems for proper system
identification.
• Developed List of Deliverables, Testing & Commissioning Procedures of Piping, Inspection &
Test Plans, Project Design & Material Monitoring Reports, Verification & Approval of Progress
Invoices of Sub-Contractors.
• Involved in Detailed Correspondence related to Technical as well as Commercial Matters with
Vendors / Sub-Contractors prior to the issuance of Procurement Orders.
• Prepared and Issued the Procurement Orders of Mechanical Systems like Welded Steel Tanks
for Crude Oil Storage, Crude Oil Truck Loading Skids, Metallic Expansion Bellows, Valves,
Gaskets, Fasteners, Pipes & Fittings, Pipe Steel Supports, Protective Coating on Piping and
Drainage Pumps.
• Prepared Project Quality Plan & Project Safety Plan.
ASSIGNMENT # 3
WORKED AS MECHANICAL DESIGN ENGINEER ON RAFHA POWER PLANT # 2 PROJECT WITH SAUDI
SERVICES FOR ELECTRO MECHANIC WORKS CO. (SSEM)
MAIN PLANT FUEL: LIGHT ARABIAN CRUDE OIL
BACK-UP PLANT FUEL: DISTILLATE OIL
PROJECT CLIENT

SSEM HEAD OFFICE at SAUDI ELECTRICITY COMPANY (SEC)
  • Saudi Arabia
  • November 2010 to September 2011

• Developed the P&ID and Piping Layouts of Crude Oil Unloading System, Crude Oil Treatment
System and Crude Oil Forwarding System.
• Worked on Pipe Sizing & Head Loss Calculations.
• Reviewed P&ID, Piping Layout and Design Criteria of Oily Water Drainage System and
General Arrangement Drawings of Submersed Sump Pumps for Oily Water Drainage Pits.
• Reviewed P&ID, Piping Layout, General Arrangement Drawings of Water Treatment System
including General Arrangement Drawings of 250 m³ Potable & 50 m³ Demineralized Water
Storage Tanks.
• Reviewed P&ID, Piping Layout and General Arrangement Drawings of Main Plant Compressed
Air System
• Reviewed General Arrangement Drawings of Ball Valves, Swing Type Non-Return Valves.
• Developed Piping Isometric Drawings & Weld Map Drawings
• Reviewed General Arrangement Drawings of Metallic Expansion Joints and Semi Metallic
Spiral Wound Gaskets for Flanged connections.
• Reviewed the Technical Quotations of Heat Tracing & Pre-Fabricated Thermal Rockwool
Insulation of Crude Oil Piping.
• Prepared Pipeline List, Valves List & Mechanical Equipment List.
• Reviewed Factory Acceptance Test (FAT) and Site Acceptance Test (SAT) Reports of Water
Treatment System, Compressed Air System, Fuel Unloading & Treatment System, Valves,
Expansion Joints.
• Attended Weekly Progress Meetings and Design Review Meetings with Project Client SEC.
• Reviewed Project Quality Plan
• Issued Procurement Orders of Valves, Expansion Joints, Gaskets & Fasteners, Non-
Destructive Testing of Welded Joints, Carbon Steel Pipes & Fittings and Galvanized Pipes.
• Involved in all correspondence with Project Client and Subcontractors.
• Prepared the Minutes of Meetings with Client and Subcontractors.
ASSIGNMENT # 1
WORKED AS MECHANICAL QA/QC ENGINEER ON RIYADH POWER PLANT # 10 PROJECT WITH SINSINA
CORNER CO. FOR CONTRACTING
MAIN PLANT FUEL: LIGHT ARABIAN CRUDE OIL
BACK-UP PLANT FUEL: DISTILLATE OIL
PROJECT CLIENT

SSEM HEAD OFFICE at SAUDI ELECTRICITY COMPANY (SEC)
  • Saudi Arabia
  • October 2011 to January 2011

Prepared / Reviewed the following documents in compliance with Project Technical Specifications:
• Correspondence with Manufacturers of Gas Turbine and Ignition Gas System for Clarification
of Interfacing Issues.
• Technical Data Sheets of Primer, Epoxy and Polyurethane Paints for pipes and Quantity
Estimation of Paints
• Technical Data Sheets of Gaskets and Fasteners
• Technical Specifications of Pre-Fabricated Thermal Rockwool Insulation and Aluminium
Cladding of Crude Oil Piping
• Issued Procurement Orders for Pre-Fabricated Thermal Rockwool Insulation and Aluminium
Cladding, Gaskets and Fasteners, Primer, Epoxy and Polyurethane Paints.
ASSIGNMENT # 2
WORKED AS MECHANICAL DESIGN ENGINEER ON REINFORCEMENT OF QURAYAT POWER PLANT PROJECT
WITH SAUDI SERVICES FOR ELECTRO MECHANIC WORKS CO. (SSEM)
MAIN PLANT FUEL: LIGHT ARABIAN CRUDE OIL
BACK-UP PLANT FUEL: DISTILLATE OIL
PROJECT CLIENT

Main Contractor at NCR
  • United Arab Emirates
  • February 2010 to October 2010

• Coordinated on daily basis with Site Engineers / Zone Supervisors to monitor the progress of
construction / erection activities in order to conduct visual as well as detailed stepwise
inspections.
• Prepared Quality Dossier Documents prior to conduct an inspection in accordance with
approved site documentation procedures.
• Reviewed Piping Isometric Drawings, Piping Weld-Map Drawings, Preparing Red Mark-Up
Drawings and As-Built Drawings as well.
• Monitored Pipe Spools Fabrication at Site Workshop in accordance with Approved Fabrication
Drawings.
8
• Inspected the Installation of Fire Fighting Hydrants.
• Prepared Inspection & Test Plans in accordance with relevant International Standards.
• Inspected the Installation of Foam Chambers and Foam Monitors of Crude Oil Storage Tanks.
• Fit-up and Visual Inspections, Axial Alignments of Welded, Coupled and Threaded Joints.
• Monitored the Non-Destructive Examination (NDE) of welding prominently including
Radiographic Testing (RT) and Dye Penetrant Testing (DPT). Maintained the records of
Radiographic Testing Reports, Dye Penetration Testing Reports, Raised & Approved RFIW’s
and other general official documentation.
• Checked the piping installation thoroughly to verify if the piping installation had been
executed in accordance with approved drawings.
• Inspections of Air Blowing prior to Hydrotest, Air Blowing after Hydrotest and Nitrogen
Purging.
• Prepared the Hydrostatic Testing Procedure complying with the requirements stipulated in
ASME B31.1 Power Piping Code and getting its approval from Client. Also, conducting
Internal as well as Final Inspections of Hydrostatic Testing based on approved procedure.
• Prepared the Pneumatic Testing Procedure complying with the requirements stipulated in
ASME B31.1 Code and getting its approval from Client. Also, conducting Internal as well as
Final Inspections of Pneumatic Testing based on approved procedure.
• Inspected the Air Flushing of Stainless Steel threaded pipeline systems.
• Raising the Requests for Inspection of Work (RFIW) of various systems and getting approval
from Client as per approved Inspection & Test Plan.
• Checking the installation of Fire Fighting Deluge Skids, Fire Water Rings and Foam Water
Rings on Crude Oil Storage Tanks.
• Prepared Project Turnover Packages in accordance with the documentation procedures
established by Client.
• Worked on the closing of comments raised in Punch List / Snag List and ensured that all
Punch List / Snag List Comments have been rectified in light of the Contract. Coordinated
with Construction Personnel to accordingly raise RFIW’s to close Punch List / Snag List
Items.
• Took Corrective & Preventive Actions on Non-Conformance Reports (

PROJECT CLIENT at NATIONAL POWER PARKS MANAGEMENT CO. (PVT.) LTD. (NPPMCL)
  • Pakistan
  • to
at SERVICES PAKISTAN (PVT.) LTD. (NESPAK)
  • to

ASSIGNMENT # 12
WORKED AS MECHANICAL DESIGN REVIEW ENGINEER ON RE-GASIFIED LIQUIFIED NATURAL GAS
BASED BALLOKI COMBINED CYCLE POWER PLANT PROJECT (1, 223 MW) WITH NATIONAL ENGINEERING

Education

Bachelor's degree, Mechanical Engineering
  • at University of Engineering & TechnologyPakistan International SchoolSt. Joseph’s English High School
  • January 2003
High school or equivalent, Mechanical Engineering
  • at University of Engineering & TechnologyPakistan International SchoolSt. Joseph’s English High School
  • January 2003

Specialties & Skills

CONVERSION
CUSTOMER RELATIONS
ENGINEERING
MECHANICAL
OIL PAINTING
QUALITY

Languages

English
Expert
Urdu
Expert