فني كهرباء
شركة الدار للبتروكماويات
Total years of experience :4 years, 2 Months
C- Main work tasks
1- Preventive maintenance, which is done on a daily basis, which contributes to preserving cables from damage, equipment, electrical transformers, and motors, also avoiding risks
2- Corrective maintenance is the replacement of damaged things or the addition of something new in the electrical circuit
3- Troubleshooting
Maintenance of motors Cable test such as insulation test
and winding test and erected cable bearing maske sure
there are no cuts or loosening in the cable Discover faults
inspection periodic maintenance of electrical
transformers such as oil filtration testing of the primary
and secondary coil and protection on the transformer
such as the fan alarms TAP changer nitrogen
Check new electrical equipment Check the machine,
welding machine cable and jacks, if there are cuts or
shorts between the cables or the cable needs to be
replaced