Total des années d'expérience: 11 Années, 7 Mois
août 2012
A À présent
Electrical Engineer
à Valdel Engineers and Constructors pvt Ltd. (S & B India)
Lieu :
Inde
1.Preparation of One/ Single Line Diagram on ETAP.
2.Carrying out Load flow study and Preparing Load Flow Report on ETAP.
3.Carrying out Short Circuit study and Preparing Short Circuit Report on ETAP software.
4.Carrying out Static Motor Starting Studies using ETAP software.
5. Carrying Relay Coordination and preparing TCC STAR on ETAP software.
6. Carrying out Arc Flash Analysis using ETAP software.
7.Carrying out Photometric Calculations by using LUXICON Software, Lighting circuiting
8.Voltage drop Calculation
9.Preparation of Cable and Conduit Schedule and Cable Sizing.
10Cable Tray Sizing
11.Checking of Grounding Plan, Lighting Plan, Cable Tray Plan and Power Plans.
12.Design & Drafting in AUTO-CAD and Microstation and Plant review using Nevisworks.
13.Carrying outHazardous Area classification using API 500 and 505
2.Carrying out Load flow study and Preparing Load Flow Report on ETAP.
3.Carrying out Short Circuit study and Preparing Short Circuit Report on ETAP software.
4.Carrying out Static Motor Starting Studies using ETAP software.
5. Carrying Relay Coordination and preparing TCC STAR on ETAP software.
6. Carrying out Arc Flash Analysis using ETAP software.
7.Carrying out Photometric Calculations by using LUXICON Software, Lighting circuiting
8.Voltage drop Calculation
9.Preparation of Cable and Conduit Schedule and Cable Sizing.
10Cable Tray Sizing
11.Checking of Grounding Plan, Lighting Plan, Cable Tray Plan and Power Plans.
12.Design & Drafting in AUTO-CAD and Microstation and Plant review using Nevisworks.
13.Carrying outHazardous Area classification using API 500 and 505
Partager sur Facebook
Partager sur Twitter
Partager via Email