Technical Support Engineer
DuctSox-MENA
Total years of experience :9 years, 9 Months
New project selection preparation and bidding progress control.
•Monitoring customs progress lead time and cost of out sourcing agent
•Supplier selection and evaluation
•Design of all air conditioning systems using ASHRAE codes, ZFP and SMACNA standards and all Ductworks (fabric, GI)
•Site installation audit and measurement procedure audit.
•Quotation preparation and Customer price negotiation.
•Project follow-up and coordination between sales team and site engineers.
•Reporting to top management of project progress and necessary action to cover delay.
•Customer representative if any inquiry or technical advice.
2015 to 2016
The Judicial Institute of Sudan using Revit program
•Staff Housing compound for Institute of public administration(KSA).
Responsibilities:
•Design of all air conditioning systems using ASHRAE codes, ZFP and SMACNA standards.
•Optimal coordination between project divisions.
Abdullah Project for Development of security Headquarters (KAP01) shop Drawing and site Adaptation for 24 building prototype
•MOI Housing Project-Riyadh (Apartments, sporting Club and admin Blg.)using Revit program
•Prince Naif Airport Al Qassim Project, Airport Terminal (37, 680 m², 1130 TR, District Cooling)
using Revit program
•Plant Teaching Hospital in Taiba University. \[800 beds\], \[B310\]
Plant load: 27650 KW, Floor Area: 280000 m².
•Mega mall. \[TMG\], \[B302\]
Plant load: 16075 KW, Floor Area: 90530 m²
•Pathology Laboratory:
Plant load: 2680 KW, Floor Area: 9575 m
Responsibilities:
•Design of all air conditioning systems (chilled water system, DX package system, VAV system & terminal units) using ASHRAE codes, ZFP and SMACNA standards.
•Responsible for choosing HVAC ventilation equipment’s programs.
•Optimal coordination between project divisions
The Engineering Company for Testing, Balancing services for HVAC systems