Power and Renewable Engineer
MOHAMMED OMAR BIN HAIDER HOLDING GROUP
Total des années d'expérience :5 years, 4 Mois
• Building connections for the group with leading renewable energy companies in the market and starting a bunch of projects for the group facilities and properties. These projects capacities until the moment are 1.954 MWp distributed on 3 projects as below:
- Al Khair Cold stores and Warehouse 1.25 MWp
- Jabal Ali Labors Camp 0.614 MWp
- Family members villas 0.09 MWp
- Sonapur Labor Camp 0.319 MWp
• Managed various aspects of electrical work, including reviewing and refining quotations, build the connection with the end users, revising work plans, timelines, and schedules. Ensured seamless workflow aligned with codes and regulations, culminating in successful project handover. Proficiently engaged in facilities enhancement,
rectification, renovation, and annual maintenance contracts. Demonstrated a successful track record with notable projects under Dubai Municipality, including the National Olympic Committee building, and Dubai Ladies Club.
• Project Engineer / May 2020 - Aug 2020
3.6 MWp, DARAK solar project, Beirin site which is PV mounting and tracking system “AXONE DOU by PV Hardware” under the provider Solstice solar energy solution.
• Project Engineer / Aug 2020 - Oct 2020
1.659 MWp, Fresh Fruits Company, Hanger rooftop, with Shletter system, under the provider ETA-MAX.
• Project Engineer / Nov 2020 - Feb 2021 Remediation works for two projects; Taibeh-Irbid project with a capacity of 5.8 MWp, and Alrabbeh-Karak project with a capacity of 5.3 MWp, with a single access tracking system “ARCTECH SOLAR” system, under the provider BELECTRIC gulf and the client CATALYST to provide ZARA holding group with the electricity.
• Site Engineer / Dec. 2018 - Mar. 2019
“8 MWp out of 22.1 MWp” Orange Jordan Solar Farms project/MDC site which is PV mounting and tracking system "Ideematic System" under the provider KAWAR energy contractor and the supervision of SAMT projects management and the consultancy of CC group.
• Operation and Maintenance Engineer / Mar. 2019 - May 2019
4 MWp, Wadi Al Aash Project which feeding Specialty Hospital and Istiklal Mall, with PV mounting and tracking system "Ideematic System", My job was to watch the operation and the production of the system and to discover if there were any problems and analyze the problems and solve it, depending on a SCADA software; shows the readings of system productivity, weather conditions, and system problems, and also to report the daily production and problems, under the provider Yellow door energy and the supervision of Spectrum For Energy Solutions Co.
• Project Engineer / Jun. 2019 until Dec. 2019 “7.27 MWp out of 46.33 MWp” South Amman Solar Power Plant, ground fixed-tilt racking system “VERSOL SOLAR”, which owned by the Ministry of Energy and Mineral Resources, under the provider BELECTRIC gulf, and the consultancy of ILF consulting engineers.
• Implementation Section: Transformers, switchgear, MDBs, and RMUs operation and periodic maintenance, distribution of medium voltage cables, and perform some tests like the Megger test, VLF test, and Continuity test.
• MV\LV Maintenance Section: Check errors and breakdowns, find problems, and solve them as quickly as possible to provide customers with electricity reliably and without interruption.
Tafila, Jordan) since 2013 to 2018.