Installation and Rollout Engineer
GPI
مجموع سنوات الخبرة :14 years, 9 أشهر
ًWorking for GPI (Geni process )
Team Upgrade:
*Upgrade capacity (from four E1 to “8, 16”E1) for AWY Links.
*Upgrade from LUX to AWY (16E1)
*Upgrade from AWY (1+0) to AWY (1+1)
* Dismantle Links Alcatel and Alcatel BTS.
* Alignment between two sites and adjust power level
Team Rollout:
*New links alcatel AWY (1+0, 1+1)
*New Micro BTS (install, commission)
*New BTs 9100 alcatel (install, configuration, commission).
*New links Alcatel MPR (1+0, 1+1) (3G)
For Mobinil Sites
Worked for Orascom trading
Mobinil maintenance as a BSS Site engineer in:
- Commissioning and maintenance of Mobinil mobile networks.
- Routing, migration and upgrading actions for the network.
- Troubleshooting and solving Laser and HDSL links problems.
- VSWR measurements and solving using site master.
- Preventive Maintenance (PM) and Under Call duty for Mobinil sites for Radio and environmental alarms.
- 2G and 3G Routes from 3 G device to RNC.
- Responsible for acceptance of new sites.
-Training on Rectifier Power One (Installation & trouble shooting), and Alcatel
Indoor unit Links LUX, AWY 9400, MXC 9500 (Installation, Alarms).
-Knowledge for installing DBS 3900 unit (BBU, RRU)
cairo University Faculty of Engineering/ Communication and Electronics Grade: Very Good with Honor Project : Wireless Sensor Network Hardware and software Grade: Excellent Project with NTI(National Telecommunication Institute Project: Solar Cell Tracking System High School :94% Primary School : I achieve sex level on east cairo management Trainig: • 2006 - Summer training in Fixing television (TV) and repair Satellite (Dish). • 2006 – Satellite Communication And Earth Station Technology • “Egypt Telecom Company • 2003- College Summer Training in electronics and communications. • 2004- College Summer Training in electronics & hardware. • Xerox Training in all Xerox Machines (Hardware and Software). • Xerox Machines are such as (Hana, Captiva, Cheetah, Printer 5500, 5550, 3120 Crossbow, and 58 Family). • 2008 – Solar Cell Tracking System Project. (NTI). • work &training in Customer Care • El-maaly Group Company for Recruitment •