Sandeep Phutane, Manager- Technical

Sandeep Phutane

Manager- Technical

Aircel LTD

البلد
الهند - مومباي
التعليم
بكالوريوس, Electronics and Communication Engineering
الخبرات
20 years, 5 أشهر

مشاركة سيرتي الذاتية

حظر المستخدم


الخبرة العملية

مجموع سنوات الخبرة :20 years, 5 أشهر

Manager- Technical في Aircel LTD
  • الهند - مومباي
  • أشغل هذه الوظيفة منذ يناير 2009

1)Plan, develop and deliver the roll-out strategy to facilitate network OPEX / CAPEX reduction, Strategic roll-out of new sites as per requirement. \n2)Responsible to ensure that the provision of the service is restored as quickly, ensuring the best possible level of service quality and availability and compliance with service levels. \n3) To generate different types of daily, weekly reports/ presentations & Analysis for top management. \n4) End-to-End management of global high severity incidents reported to the Service Desk from the point of initiation to the point of resolution. \n5) Root cause analysis of BTS outages, finding out major contributors of outages, promoting the Field Engineer to come up with recommendations, and planning to remove the snags/ deficiencies of BTS sites in order to enhance the network stability. \n6) Ensure OnM PPP (Policy, Processes & Procedure) updated continuously to improve OnM objectives.

Manager- Technical في Aircel LTD
  • الهند - تانا
  • أشغل هذه الوظيفة منذ يناير 2004

 Plan, develop and deliver the rollout strategy to facilitate network OPEX/CAPEX reduction, Strategic rollout of new sites as per requirement. \n Responsible to ensure that the provision of the service is restored as quickly, ensuring the best possible level of service quality and availability and compliance with service levels \n To generate different types of daily, weekly reports/ presentations & Analysis for top management. \n End-to-End management of global high severity incidents reported to the Service Desk from the point of initiation to the point of resolution \n Root cause analysis of BTS outages, finding out major contributors of outages, promoting the Field Engineer to come up with recommendations, and planning to remove the snags/ deficiencies of BTS sites in order to enhance the network stability. \n Ensure OnM PPP (Policy, Processes & Procedure) updated continuously to improve OnM objectives.

Manager - O&M/ Project في Aircel Ltd
  • الهند
  • يناير 2009 إلى يناير 2013

Currently working in Aircel Ltd. as Manager - O&M/ Project (Jan2009- Till date)
Handling Project / O&M activities of North Mumbai, and responsible for 7 BSC's and 670 sites
JOB RESPONSIBILITIES:
Operations and Maintains:-
☞ Operations, Administration & Maintenance of Cell Sites (670) and 7 BSC, & Ensuring N/W availability within the KPI and SLA.
☞ Undertaking network deployment which includes BSC expansion, TRX capacity expansion, MW expansion, Tx planning
Site Loop Protection.
☞ Timely fault restoration under corrective maintenance and verification of reported faults based on severity along with O&M Vendors and Manage Service Partners.
☞ Daily analysis of BTS, Transmission performance reports
☞ Coordination & Planning for New Site Rollout with Project.
☞ Coordination and Supervision with Manage Service Partner (Nokia Siemens Network, Huawei, Tulip), assive Infra O&M, LL vendors
☞ O&M reports analysis and timely corrective action
☞ Monitoring and capturing data related to routine preventive maintenance as per contract terms with O&M vendors.
Project:-
☞ Rollout - Planning, Implementation during the Launching of Aircel Network for the North Mumbai.
☞ All critical Nodes 10 BSC, 1 MSC Implemented and On Air with Ring protection.
☞ Coordinated with NSN, TSP's and completed AT of all on air sites and bring AT online as per SOP and completed Documentation also.
☞ Capex and Opex Planning in the Network
☞ Supervision of the project implementation: Planning, Land Acquisition / Statutory approvals, scheduling and preparation of project progress report.
☞ Execution - monitor progress, liaison with clients' officials, Building Strong relations with Site owners, trouble shooting Site review for checking conformance with technical specifications, schedules and budget.Co-ordinate on field, effective manpower utilization

☞ Up gradation of power backup, infra depending sharing OPCO requirement.

Team Lead - BSS في Ericson India PVT Ltd
  • الهند - مومباي
  • يوليو 2008 إلى يناير 2009

Ericson India PVT Ltd., Mumbai \nTeam Lead - BSS (Idea Account) (July2008 -Jan2009) \nJOB RESPONSIBILITIES: \n☞ Achieving & maintaining positive Network Quality Index (NQI) for 3 BSC as per SLA from Idea \n☞ Operations, & Maintenance of Cell Sites \n☞ Undertaking network deployment which includes BSC expansion, TRX capacity expansion, MW expansion \n☞ Better Transmission planning & Site Loop Protection for resulting maximum Network Uptime / Radio Network Availability. \n☞ Responsible to manage the maintenance of the all power related issues \n☞ Coordination & Planning for New Site Rollout with Project.

Asst. Manager في BPL mobile comm. Ltd. Mumbai
  • الهند
  • يوليو 2007 إلى يوليو 2008

BPL mobile comm. Ltd. Mumbai
Asst. Manager (BSS-Project / O&M) (July2007-July2008)
JOB RESPONSIBILITIES:
☞ Planning, scheduling, monitoring and controlling all the operation and maintenance activities of cell sites, RBSC.
☞ Managing Technical resources for the best utilization at field.
☞ Coordinating with the other GSM operators, contractors, vendors for faster protection and reducing outages.
☞ Planning & Scheduling of AT for new on-air sites
☞ Controlling & Monitoring of BTS Sites rollout.
☞ Responsible for Hardware upgradation (TRX addition, BTS swapping)
☞ Site Optimization according to Traffic.
☞ Back hand supports to Customer Care for network related problems.
☞ IBS/ Repeater build out as per customer requirements.

Project Team Lead في GTL .Ltd
  • الهند
  • يونيو 2004 إلى يونيو 2007

GTL .Ltd. Project Team Lead. (June 2004- June 2007) RESPONSIBILITIES: ☞ Build up RRT / RTP/ and GBT sites for the TATA ( Mumbai and Maharashtra)
☞ Up gradation of power backup, infra depending sharing OPCO requirement.
☞ Coordinating with other all Sharing operator's representative to resolve sites issues
☞ NOKIA BTS Installation, Commissioning and Integration for AIRTEL (New Sites), Rest Of Maharashtra
☞ Alcatel BTS Installation, Commissioning and Integration for AIRTEL (New Sites), Rest Of Maharashtra
☞ Nokia Cabinet Expansion for Airtel Maharashtra
☞ Motorola to Nokia Swap for the BPL Maharashtra
☞ Testing of VSWR, using site master and power meter.
☞ Antenna Orientation / Tilt changes and Radio Alignment.
☞ Troubleshooting and Solving Mini Link Problem.
☞ Performing of Acceptance test of the SWAP Sites.
☞ Selection and finalization of Sub Contractors and vendors.

Mumbai Project Engineer في Nuteck India Pvt. Ltd
  • الهند - مومباي
  • يناير 2004 إلى يونيو 2004

Nuteck India Pvt. Ltd. Mumbai Project Engineer (JAN 2004- June 2004) \n \nJOB RESPONSIBILITIES: ☞ Lucent 5ESS CDMA switch Installation, for Reliance. \nTraining completed \n☞ Project Management - Aircel.. \n☞ Creative problem solving skills - Aircel \n☞ NOKIA BTS, BSC, GSM - In House Training \n☞ Motorola CP 29:- Basis of Transmission and planning. \n☞ Advance Excel - In house Training. \n☞ Power Plant for Telecom - In House Training,

الخلفية التعليمية

بكالوريوس, Electronics and Communication Engineering
  • في SSGMCE Shegaon Amravati University
  • مارس 2003

Bachelor of Technology in Electronics and Communication Engineering (BE) from SSGMCE Shegaon Amravati University, Maharashtra

Specialties & Skills

Telecommunications
Rollout
TELECOM ROLLOUT
Operation
Maintenance Management
MAINTENANCE
OPERATIONS
ROLLOUT

اللغات

الانجليزية
متمرّس

العضويات

Aircel LTD
  • Manager
  • January 2008

التدريب و الشهادات

Yes (الشهادة)
تاريخ الدورة:
September 2012
صالحة لغاية:
September 2012