سرمد افتاب, Project Engineer

سرمد افتاب

Project Engineer

Chinki Construction PVT LTD

البلد
الهند - باتنا
التعليم
بكالوريوس, MECH
الخبرات
22 years, 0 أشهر

مشاركة سيرتي الذاتية

حظر المستخدم


الخبرة العملية

مجموع سنوات الخبرة :22 years, 0 أشهر

Project Engineer في Chinki Construction PVT LTD
  • الهند
  • أشغل هذه الوظيفة منذ مايو 2019

Project Execution • Installation • Testing & Commissioning
SYNOPSIS
•Around 11 years of experience in Estimation, Execution, Testing & commissioning in MEP- Mechanical services.
•Also take involvement in design of interim systems.
•Proficient in managing Installation and maintenance operations.
•Familiar in system/ equipments as HVAC, Plumbing & sanitary, Fire fighting sprinkler and wet riser systems, Fire suppression systems, FCU, AHU, FAHU, Supply & Return Ducts, Fresh air, LPG, irrigation systems, Hot water generators, pumping systems, etc
•Quantity surveying, Quality control, Forecasting, Labour cost calculation.
•Always ready to work under pressure and to give the best output.
•Always take initiatives to improve the workmanship of labours and quality of works done.
CAREER SCAN

Project Engineer في BILT Middle East LLC
  • الإمارات العربية المتحدة
  • ديسمبر 2011 إلى مارس 2019
في EQUIPMENTS & SYSTEMS FAMILIAR WITH
  • نوفمبر 2017 إلى مارس 2019

HOT & COLD WATER PIPING SYSTEMS.
•DRAINAGE U/G & H/L & STACKS
•SANITARY INSTALLATIONS.
•PUMPS (BOOSTER PUMPS, TRANSFER PUMPS, CIRCULATION & DOSING PUMP)
•VALVES & ACCESSORIES.
•FILTRATION (ACF, SAND FILTER, MULTIMEDIA FILTER) & SOFTENER
•HEAT EXCHANGER (PLATE, SHELL & TUBE)
•IRRIGATION SYSTEMS
•BMS INTERFACING WITH SYSTEM

HOT WATER GENERATION:
•HOT WATER BOILERS (WATER TUBE AND SMOKE TUBE TYPE)
•CALORIFIER, WATER HEATERS, HEAT PUMPS
•HYDRAULIC SEPARATOR
•CORROSION INHIBITOR
•EXHAUST/ CHIMNEY
•BMS & FIRE ALARM INTERFACING WITH SYSTEM

FIRE FIGHTING:
•FIRE PUMPS (DIESEL ENGINE, ELECTRICAL & JOCKEY)
•VALVES & HOSE REELS
•SPRINKLER AND WET RISER SYSTEM
•FIRE HYDRANT NETWORK
•BREECHING POINTS
•FIRE SUPPRESSION SYSTEMS (PRE-ACTION, DELUGE, FM200, ETC)
•FIRE ALARM SYSTEM (CAUSE AND EFFECTS)

HVAC:
•CHILLED WATER AND DUCTING NETWORK
•DAMPERS, PHE, VALVES,
•AIR HANDLING SYSTEMS (FAHU, AHU, FCU)
•BMS AND FIRE ALARM INTERFACING WITH SYSTEM

في Al Maktoum International Airpor
  • الهند
  • مارس 2015 إلى يونيو 2016

Cost of Project 135 Million Dirhams (AED) for MEP
Role Looking over the Execution/Installation, T&C and Handing over of Plumbing (WS & DR) and Fire Fighting services overall under the scope of Mechanical works (Plumbing & Fire Fighting).
PreviousProject Sky Cargo Project

  • أبريل 2014 إلى فبراير 2015

Cost of Project 88 Million Dirhams (AED) for MEP
Role was responsible for overall Infrastructure (external) piping under the scope of Plumbing and Fire Fighting.
Installation of services/Pipeline (soil, waste, storm, water supply & Fire Fighting) from government provided stub outs/provisions to run entirely along the whole cargo compound in a ring for pressurized systems with various tap outs from the compound & connecting Drains to provided government Manholes as per rule and regulations of the authority.
Previous Project 38-Villa & Retail Development

في AL WASL
  • الهند
  • ديسمبر 2012 إلى مارس 2014

Cost of Project 37 Million Dirhams (AED) for MEP
Role Looking over the Execution/Installation, T&C and Handing over of Plumbing (WS & DR) and Fire Fighting services overall under the scope of Mechanical works (Plumbing & Fire Fighting).
Previous Project HYATT RESIDENCY HOTEL & RESIDENTIAL APARTMENTS @ DUBAI HEALTHCARE CITY, DUBAI (

في JW MARQUIS MARIOTT HOTEL
  • الهند
  • ديسمبر 2011 إلى يوليو 2012

Cost of Project 300 Million Dirhams (AED) for MEP
Role Testing & commissioning of the Installed systems

في HOTEL RED FOX
  • الهند
  • ديسمبر 2010 إلى أغسطس 2011

Cost of Project Rs. 1.5 Crore
Role looking over the Installation of the Hot Water Generators, Plate type Heat Exchangers, Centrifugal pumps, mixing tanks, water softening unit, all the piping for hot water distribution system and the flue (chimney) for the HWG units.

Mechanical Site Engineer في Sakar India Pvt Ltd
  • الهند
  • أبريل 2009 إلى أغسطس 2011
في HOTEL LEELA PALACE
  • الهند
  • مايو 2009 إلى نوفمبر 2010

Cost of Project Rs. 2.4 Crore
Role Looking over the Execution/Installation, T&C and Handing over of Hot water generator system overall.
Installation of the Hot Water Generators, Plate type Heat Exchangers, Centrifugal pumps, mixing tanks, water softening unit, all the piping for hot water distribution system and the flue (chimney) for the HWG units

الخلفية التعليمية

بكالوريوس, MECH
  • في B.P.U.T (BIJU PATNAIK UNIVERSITY OF TECHNOLOGY)
  • يناير 2009

(

الثانوية العامة أو ما يعادلها, MECH
  • في E.B
  • يناير 2003

(

بكالوريوس, MECH
  • في E.B
  • يناير 2003

(

الثانوية العامة أو ما يعادلها, MECH
  • في C.B.S.E
  • يناير 2001

(

Specialties & Skills

MS Office tools
Plumbing
Fire Protection
MECHANICAL
MICROSOFT WORKS
PLUMBING
MULTIMEDIA
NETWORKING
SHELL SCRIPTING

اللغات

الانجليزية
متمرّس
الهندية
متمرّس
الأوردو
متمرّس