Principal Technical Analyst
Oracle India Pvt Ltd
Total years of experience :18 years, 5 Months
Project Title/Client : MTN ( South Africa ), General Electronics - USA ( GE )
Role : Senior Technical Analyst
Project Duration : Jun’14 to Till Date
Application (modules) : EBS R12.x & Oracle GRC Suite, UPK
Project Description : The project is for EBS R12 implementation & GRC
Implementation.
• Oracle Cloud Instance migration
• Oracle cloud DB Patching & Troubleshooting
• Oracle Cloud Instance Compartment Related issues
• Oracle Cloud VCN related issues
• Oracle Could Dbaas & Exacs Patching and Troubleshooting
• EBS 12.2 cloning using RMAN for RAC to Non-RAC
• EBS 12.2 ADOP Online patching
• EBS 12.2 Installation and Configuration
• EBS R12 Cloning using RMAN for RAC to NON-RAC and Non-Rac to RAC
• SSO Configuration with EBSO & GRC
• EBS R12 DMZ implementation and configuration
• EBS Shared Appl_TOP implementation and configuration
• GRC Application suite ( AACG, TCG, CCG & PCG ) implementation and integration with RAC and NON-RAC environments
• GRC Cloning Concepts.
• GRC Application Upgrade from8.6.3 to 8.6.4.8329
• GRC Integration with TAF/SCAN enabled EBS environments.
• with all integrated including SSO
• Remedy ticket concept for supporting to the client.
• Weblogic Auto restart script implementation
• Database upgrade done from 11.2.0.3 to 11.2.0.4
• Deploying R12 Cemli & Patching and configuration activities involved.
• Installing and configuring the UPK product and integrated with EBS.
Application (modules) : EBS R12.x & Oracle GRC Suite
Project Description : The project was implemented by COE purpose.
Responsibilties:
•Installed and configured Weblogic Server10.3.6 and GRC Suite - EGRC 8.6.4.5 and upgraded to EGRC 8.6.4.8 on OEL6.4
•Installed Fusion Applications & IDM components with integration.
•Involved in upgrade activity from 9.2.0.6 to 11.2.0.1 Database, 11.5.10.2 to 12.1.1 Application.
•Implemented the Apex 4.4.1 production instance.
•Configured the RMAN in Production Instance.
•Performed in Cloning from RMAN backup in multi Tier environment.
•Resolved Performance related issues.
•Installed New R12.1.1 instance
•Installed and integrating the OBIEE with EBS 12.1.1
•Installed and configured Weblogic Server and GRC Suite - EGRC 8.6.4.5 on OEL6.
•Installed and configured GRC Suite - PCG 7.3.2 and upgraded to 7.3.3 on OEL5.
•Involved in Hardware Sizing for GRC Suite Env.
•Installed and configured SOA suite 11.1.1.4, RCU 11.1.1.4, Weblogic 10.3.4
•Installed Apex 4.1.1 in OEL 6 and integrated with EBS R12.1.1.
•Installed and configured Peoplesoft HCM9.1, People Tools and related prerequisites including Tuxedo, data mover and others.
•Installation of Oracle BI / OBIEE components and also administration of GRC Intelligence
The project was dba support purpose.
Responsibilties :
•Cloning of applications system and database in dev/prod environments.
•Creating Application users and assigning responsibilities.
•Troubleshooting the application system includes login issues, concurrent request
errors.
•Applying Patches ( Adpatch & Opatch) in multimode environment.
•Scheduling and taking daily, weekly and monthly backups using tar.
•Developed shell scripting for instance of Pro-Active.
•Upgraded the Jinitiator to Sun JRE for Win7 & Windows XP Clients.
Project Description : The project was implemented for internal purpose.
Responsibilties :
•Involved in Database upgrade from 9.2.0.6 to 10.2.0.5
•Cloning of applications system and database in Test/Dev/prod in Multi Tier environments.
•Production Instance Recovered from RMAN backup.
•Applying Patches ( Adpatch & Opatch) in multimode environment.
•Involved in Discoverer upgrade from 4i to 10g ( IAS, Apache )
•Creating the filesystem in AIX Operating systems.
•Monitoring the CPU, Memory, Disk space on the Database and Apps Servers.
•Scheduling the backups using tar.
•Configuraing RMAN in Production Environment.
Oracle
courses: Information systems •C++ Programming Language –