Work Experience

Total years of experience :17 years, 7 Months

Piping Engineer at Jacobs Zate
  • Saudi Arabia - Khobar
  • My current job since February 2019

Validation of all (GRP/GRV/GRE Piping) Engineering deliverables like A/G & U/G Piping Longitudinal Section drawings, Stress Analysis, Datasheets, TBE, Mechanical G.A drawings for Marafiq project SWTP-9 Jubail.
Preparation of MR’s for bulk items, valves (Manual & MOVs) & services etc. Preparation and handling Technical clarification, Technical bid evaluation for each item from different vendors listed in RVL.
NMR 601, 602 & 603 documents reviewal & approval for Aramco projects.
Preparation of Safety Instruction sheet, Valve datasheets, PMS, Scraper datasheets etc.
As a checker for package deliverables for these mentioned projects.
Resolving Technical query from vendors, clients etc.

Piping Engineer at PDO- Petroleum Development of Oman
  • Oman
  • June 2017 to February 2018

Validation of all Engineering deliverables like Piping Longitudinal Section drawings, Stress Analysis, Datasheets, TBE, Mechanical G.A drawings for Marafiq project.
Preparation of MR’s for bulk items, valves (Manual & MOVs) & services etc. Preparation and handling Technical clarification, Technical bid evaluation for each item from different vendors listed in RVL.
NMR 601, 602 & 603 documents reviewal & approval for Aramco projects.
Preparation of Safety Instruction sheet, Valve datasheets, PMS, Scraper datasheets etc.
As a checker for package deliverables for these mentioned projects.
Resolving Technical query from vendors, clients etc.
Project Co-ordination with Engineering Consultant, Client for the allotted Projects.
Engineering deliverables (EDR) from consultant, Ordering construction materials through PDO- SAP system (Bulk & Special items ) from MTO and focusing to complete the project within schedule and its cost budget. Full support to construction site for their technical clarifications, procurement of materials etc.

Control & Applications Emirates (UAE)

Field Engineer
  • March 2014 to December 2016

Maaden Umm-Wu’al Phosphate Project

Client Ma’aden (Turaif) PMC Fluor

Carrying Engineering activities required at site. Reviewing & approval of drawings, datasheets for Valves etc. for Fire water Network piping & plant piping.
Resolving site & technical issues/ clarification raised by contractors through RFI.
Checking of Pipe wall thickness calculations, AWWA M45 Buried calculations for Non-Metallic piping, Amiantit-vendor Isometrics etc.
Co-ordination with the vendor ‘Amiantit’ Engineering team for expedition of GRV/GRE Pipes & fitting materials.
Checking of stress analysis reports from REDA/FPI Fire water isometrics & U/G GRE, GRV piping from Amiantit.

Jacobs Zate (KSA)

Senior Piping Engineer at KSA
  • United Arab Emirates
  • March 2014 to May 2015
Piping Engineer at Saudi Aramco GGM
  • March 2014 to May 2015

GES Plus (MPP) & FEED on ‘Gas Gathering Manifold’ for 8 stations for Saudi Aramco

Consultant at Petrofac Saudi Arabia Ltd
  • Saudi Arabia
  • January 2013 to March 2014

PipingEngineer- Materials
Petro Rabigh Phase-II

Piping Engineer
  • January 2011 to January 2013

Stress Ind. Waste Water Treatment Plant-Marafiq, TAACA Project
Consultant: SETE ENERGY & Marafiq

Responsible for Pipe Stress Analysis for Nonmetallic piping systems like GRP/GRE as per the code BS7159/UKOOA/ISO 14692.
Responsible for providing Conceptual Pipe Support Design for GRP/GRE Systems.
Conversant with Buried Pipe Modeling considering thrust anchors and able to conduct stress analysis with Soil inputs.
Conversant with Checking Nozzle Loads (API 610) with the active pump loads provided by the Pump Vendor.
Well conversant with the codes and standards like ASME/API/ASTM/BS/ISO/AWWA/EJMA etc

Piping Engineer at VAtech Wabag Ltd
  • India
  • June 2008 to November 2010

DELHI JAL BOARD (12, 20, 40 &45MGD STPs)
Ind. Waste Water Treatment Plant-Marafiq, TAACA Project
Consultant: MWH & STUP CONSULTANTS, DELHI



Preparation of piping specifications and submitting the document for their approval category.
Preparation of line list and valve list.
Checking of P&ID’s for pipe size calculation & mechanical & piping G.A drawings.
Development of Valve datasheets, Technical Evaluation of valves and discussion with various vendors

Piping Engineer at ManTech Synergies Pvt Ltd
  • India
  • September 2007 to May 2008

Various Thermal Projects

Checking of support drawings.
Preparation and checking of Isometrics and BOQ extraction.
Abdullah H. Al Shuwayer Trading and Contracting Company - KSA

at V3 Power Petro Engg Pvt Ltd
  • August 2006 to August 2007

JuniorEngineer-Construction


Various Engineering Projects & M/s ALSA TECHNICAL SUPPLIES, FISIA

Involved in Mechanical Estimation for various shutdown & maintenance works. Comfort in checking of isometric drawings and experience in proper documentation.
Involved in Technical discussions with customers like M/s ALSA TECHNICAL SUPPLIES, FISIA etc

Site Engineer at Tata Chemicals Ltd (TCL)
  • India
  • June 2005 to July 2006

High pressure Boiler (HPB-4)

Education

Bachelor's degree, Piping Engineering
  • at PMPSuvidya Institute of Technology
  • February 2021

courses: Project Management Professional -

High school or equivalent, Piping Engineering
  • at I.D.E.A
  • February 2021

courses: Holding Fiber Reinforcement Piping Technology Training Certificate. •Holding CAESAR II Certificate by COADE

Master's degree, Production Management
  • at Annamalai University
  • January 2008

Bachelor's degree, Mechanical Engineering
  • at Anna University
  • January 2005

Specialties & Skills

Materials
Oil and Gas
Engineering
Stress Analysis
CUSTOMER RELATIONS
MECHANICAL
CONSULTING
DOCUMENTATION
MATERIALS MANAGEMENT
MICROSOFT WORKS
SPECIFICATION
FILE MANAGEMENT
IMMIGRATION AND NATIONALITY DIRECTORATE

Languages

Arabic
Expert
English
Expert
Hindi
Expert