Electrical Engineer à STFA Engineering & Construction Company
  • Koweït - Al Ahmadi
  • Je travaille ici depuis septembre 2014

Role:
• Making significant contributions by deploying and setting systems
• Ramping up projects within defined time, cost and quality parameters
• Maintaining close cross-functional coordination and liaison with external bodies/ agencies for smooth project execution
• Preparing technical evaluations of material specifications and submitting for client approval
• Creating detailed BOM for material procurement and manufacturing
• Calculating size of the cables considering the allowable voltage drop, current carrying capacity, etc.
• Generating load schedule for the electrical equipment building, and selection of the main incomer breaker size of the 440V Switchboard
• Preparing Lighting & Power Layout shop drawings for the all electrical equipment’s buildings
• Computing Load flow analysis, Relay coordination study and short circuit calculation using ETAP Software
• Guiding draftsman’s in preparation of overall single line diagram including specification details of all electrical equipments
• Analyzing civil structural and architectural drawings and provide comments based on the suitability of equipment erection and cable laying
• Preparing TBA & RMA Submittals, As-built drawings for final submission
• Coordinating with other departments, outside agencies, contractor for engineering activities

Highlights:
• Contributed in preparation of Key Single Line Diagram for the 440V Switchgear, 11KV Switchgear, 11 KV RMU and UPS, Lighting DBs for Electrical Equipment Buildings
• Significantly contributed in Calculate size of the Cables considering the allowable voltage drop, current carrying capacity & short circuit withstand capacity
• Working out:
- Calculations to maintain good Earthing Protection System, considering the soil resistivity around the substation.
• Computing Load flow analysis, Relay Coordination Study and short circuit calculation using ETAP Software
• Substation layout preparing with Small Power, Lighting systems & Substation Conduit Layout & Cable Tray Layout.
• Working on a Integrated Security Systems for all KOC Facilities, KOC
• Undertook meetings with the PMC before submitting for obtaining faster document & drawing approvals from clients

Project Engineer Electrical à Mitsubishi electric corporation
  • Koweït - Al Koweït
  • Je travaille ici depuis février 2020

Working for 300/132/11Kv and 132/11kV HV GIS substation.
Responsible for Cost, Time schedules.
Responsible for Risk, stakeholder and procurements management.
Project closoeouts.
Engineering clarification to client.
Project review meeting participation

Project Engineer Electrical à Siemens electrical and electronics services company
  • Koweït - Al Koweït
  • novembre 2015 à janvier 2020

Sucessfully completed several HV GIS substation.
Responsible for Cost, Time schedules.
Responsible for Risk, stakeholder and procurements management.
Project closoeouts.
Engineering clarification to client.
Project review meeting participation.

Electrical Design Engineer à IMCO Engineering & Construction Company
  • Koweït - Al Ahmadi
  • février 2011 à août 2014

Role:
• Making significant contributions by deploying and setting systems
• Ramping up projects within defined time, cost and quality parameters
• Maintaining close cross-functional coordination and liaison with external bodies/ agencies for smooth project execution
• Preparing technical evaluations of material specifications and submitting for client approval
• Creating detailed BOM for material procurement and manufacturing
• Calculating size of the cables considering the allowable voltage drop, current carrying capacity, etc.
• Generating load schedule for the electrical equipment building, and selection of the main incomer breaker size of the 440V Switchboard
• Operating activities like generator sizing, transformer sizing and UPS Sizing calculations
• Working out calculations, to maintain good earthling protection system considering the Soil resistivity
• Computing Load flow analysis and short circuit calculation using ETAP Software
• Guiding draftsman’s in preparation of overall single line diagram including specification details of all electrical equipments
• Analyzing civil structural and architectural drawings and provide comments based on the suitability of equipment erection and cable laying
• Preparing TBA & RMA Submittals, As-built drawings for final submission
• Coordinating with other departments, outside agencies, contractor for engineering activities
• Working out:
- Calculations to maintain good Earthing Protection System, considering the soil resistivity around the substation.

Highlights:
• Contributed in preparation of Key Single Line Diagram for the 440V Switchgear, 11KV Switchgear, 11 KV RMU and UPS, Lighting DBs for Electrical Equipment Buildings
• Significantly contributed in Calculate size of the Cables considering the allowable voltage drop, current carrying capacity & short circuit withstand capacity
• Working out:
- Calculations to maintain good Earthing Protection System, considering the soil resistivity around the substation.
• Computing Load flow analysis and short circuit calculation using ETAP Software
• Substation layout preparing with Small Power, Lighting systems & Substation Conduit Layout & Cable Tray Layout.
• Working on a Integrated Security Systems for all KOC Facilities, KOC
• Undertook meetings with the PMC before submitting for obtaining faster document & drawing approvals from clients
• Successfully handled two projects, at a single same time

Executive Electrical and DCS Engineer à M/S DHARANI SUGARS AND CHEMICALS LTD
  • Inde - Chennai
  • septembre 2009 à janvier 2011

PREVIOUS JOB EXPERIENCE: 1. ORGANIZATION: M/S DHARANI SUGARS AND CHEMICALS LTD, \n \nVILLUPURAM. \nDURATION: September 2009 to January 2011. \nDESIGNATION: Executive Electrical and DCS Engineer.

Éducation

Baccalauréat, BE - ELECTRICAL AND ELECTRONICS ENGINEERING
  • à ANNA UNIVERSITY
  • avril 2008

High School - 88%,
Higher secondary - 73%,
BE - 64%.

Specialties & Skills

Microsoft Office
AutoCAD
Primavera P6
MS Project
AUTO CAD
DESIGN ENGINEER
DRAWING
ELECTRICAL DESIGN
ENGINEER
LIGHTING

Langues

Malayala
Débutant
Anglais
Expert
Tamil
Expert
Telugu
Moyen
Hindi
Moyen

Adhésions

TEF(TAMILNADU ENGINEERS FORUM)
  • ELECTRICAL ENGINEER
  • January 2015

Formation et Diplômes

Project Management knowledge Test@Siemens (Certificat)
Date de la formation:
June 2019
PMP (Formation)
Institut de formation:
PMI
Date de la formation:
June 2015
Durée:
35 heures
ETAP (Certificat)
Date de la formation:
April 2012
Valide jusqu'à: