Electrical Engineer
STFA Engineering & Construction Company
Total des années d'expérience :14 years, 8 Mois
Role:
• Making significant contributions by deploying and setting systems
• Ramping up projects within defined time, cost and quality parameters
• Maintaining close cross-functional coordination and liaison with external bodies/ agencies for smooth project execution
• Preparing technical evaluations of material specifications and submitting for client approval
• Creating detailed BOM for material procurement and manufacturing
• Calculating size of the cables considering the allowable voltage drop, current carrying capacity, etc.
• Generating load schedule for the electrical equipment building, and selection of the main incomer breaker size of the 440V Switchboard
• Preparing Lighting & Power Layout shop drawings for the all electrical equipment’s buildings
• Computing Load flow analysis, Relay coordination study and short circuit calculation using ETAP Software
• Guiding draftsman’s in preparation of overall single line diagram including specification details of all electrical equipments
• Analyzing civil structural and architectural drawings and provide comments based on the suitability of equipment erection and cable laying
• Preparing TBA & RMA Submittals, As-built drawings for final submission
• Coordinating with other departments, outside agencies, contractor for engineering activities
Highlights:
• Contributed in preparation of Key Single Line Diagram for the 440V Switchgear, 11KV Switchgear, 11 KV RMU and UPS, Lighting DBs for Electrical Equipment Buildings
• Significantly contributed in Calculate size of the Cables considering the allowable voltage drop, current carrying capacity & short circuit withstand capacity
• Working out:
- Calculations to maintain good Earthing Protection System, considering the soil resistivity around the substation.
• Computing Load flow analysis, Relay Coordination Study and short circuit calculation using ETAP Software
• Substation layout preparing with Small Power, Lighting systems & Substation Conduit Layout & Cable Tray Layout.
• Working on a Integrated Security Systems for all KOC Facilities, KOC
• Undertook meetings with the PMC before submitting for obtaining faster document & drawing approvals from clients
Working for 300/132/11Kv and 132/11kV HV GIS substation.
Responsible for Cost, Time schedules.
Responsible for Risk, stakeholder and procurements management.
Project closoeouts.
Engineering clarification to client.
Project review meeting participation
Sucessfully completed several HV GIS substation.
Responsible for Cost, Time schedules.
Responsible for Risk, stakeholder and procurements management.
Project closoeouts.
Engineering clarification to client.
Project review meeting participation.
Role:
• Making significant contributions by deploying and setting systems
• Ramping up projects within defined time, cost and quality parameters
• Maintaining close cross-functional coordination and liaison with external bodies/ agencies for smooth project execution
• Preparing technical evaluations of material specifications and submitting for client approval
• Creating detailed BOM for material procurement and manufacturing
• Calculating size of the cables considering the allowable voltage drop, current carrying capacity, etc.
• Generating load schedule for the electrical equipment building, and selection of the main incomer breaker size of the 440V Switchboard
• Operating activities like generator sizing, transformer sizing and UPS Sizing calculations
• Working out calculations, to maintain good earthling protection system considering the Soil resistivity
• Computing Load flow analysis and short circuit calculation using ETAP Software
• Guiding draftsman’s in preparation of overall single line diagram including specification details of all electrical equipments
• Analyzing civil structural and architectural drawings and provide comments based on the suitability of equipment erection and cable laying
• Preparing TBA & RMA Submittals, As-built drawings for final submission
• Coordinating with other departments, outside agencies, contractor for engineering activities
• Working out:
- Calculations to maintain good Earthing Protection System, considering the soil resistivity around the substation.
Highlights:
• Contributed in preparation of Key Single Line Diagram for the 440V Switchgear, 11KV Switchgear, 11 KV RMU and UPS, Lighting DBs for Electrical Equipment Buildings
• Significantly contributed in Calculate size of the Cables considering the allowable voltage drop, current carrying capacity & short circuit withstand capacity
• Working out:
- Calculations to maintain good Earthing Protection System, considering the soil resistivity around the substation.
• Computing Load flow analysis and short circuit calculation using ETAP Software
• Substation layout preparing with Small Power, Lighting systems & Substation Conduit Layout & Cable Tray Layout.
• Working on a Integrated Security Systems for all KOC Facilities, KOC
• Undertook meetings with the PMC before submitting for obtaining faster document & drawing approvals from clients
• Successfully handled two projects, at a single same time
PREVIOUS JOB EXPERIENCE: 1. ORGANIZATION: M/S DHARANI SUGARS AND CHEMICALS LTD, \n \nVILLUPURAM. \nDURATION: September 2009 to January 2011. \nDESIGNATION: Executive Electrical and DCS Engineer.
High School - 88%,
Higher secondary - 73%,
BE - 64%.