Principal Designer Structure
Wood group
Total years of experience :37 years, 7 Months
Job involved are site survey, collection of data from site, developing & designing Structural Steel fabrication shop drawings & details, RCC structure and foundation drawings. Plot plan & Area plot plan, grading Plan, underground services, Bill of materials, Quantities of Steel and R.C Structure, bar bending schedule, checking of drawings done by others designers for going projects.
Jobs involved are designing, bill of materials, Steel and R.C Structure quantities, checking of design and fabrication drawings for running national and international projects done by draughts mans and designers. I was handling the team of 5 draughts mans and providing them technically guidance
Job involved are site survey, collection of data from site, developing & designing Structural Steel fabrication shop drawings & details, RCC structure and foundation drawings. Plot plan & Area plot plan, grading Plan, underground services, Bill of materials, Quantities of Steel and R.C Structure, bar bending schedule, checking of drawings done by others designers for going projects.
• Deputed to SNC-Lavalin at Project construction site office in Al-Taweelah, Abu Dhabi, and UAE. For Emirates Aluminum for Aluminum Smelter Project for construction support.
• Jobs involved are developing & designing, steel structural detail drawings, RCC structure and equipment foundations drawings for Reduction Area Unit in Aluminum Plant. Checking of drawings done by other D/Man’s & Designers. Project details given below.
• (Phase-1) Reduction Area Superstructures: Equipment Maintenance shop, Pot line Superstructure & Equipment Maintenance shop, Cathode sealing, Lining shop, PTM Maintenance shop, Reduction Control room, Pot rooms, Gas treatment center, Substations, Electrical rooms, Control room & Management offices.
• KNPC being operating company, majority of time it is revamping, upgrading, and modifications in the existing facilities at its existing refineries (Mina Abdulla, Mina Al Ahmadi and Shuaiba Refinery)
• Job involved are site survey, collection of data from site, developing structural details and fabrication shop drawings, RCC structure and foundation drawings. Operating platforms, cable tray supports, sheds, Pipe supports, structural pipe racks, Heavy equipment operating floors, . Bill of materials, Bar bending, Quantity and checking of drawings. Some of the Brown filed Project
Job involved were to Prepare detail and design drawings for Civil/Structural and RCC details, Fabrication drawings, Bridges, Trusses, Beams, Purlins, Louvers, Monitors, Monorails, Crain beams, heavy Equipment floors, Pipe Rack, Cable Supporting Structure, Plant layout, Pipe way bridge, Box culverts, Surface Drainages, bill of material, bar bending schedules and checking of drawings
Responsible for the preparation of Structural steel detail and fabrication drawings for 90T/EOT Crain Shed of Steel
Rolling mills, Columns, Roof Trusses, Roof Purlins, Louvers, Side Cladding, Monitors, Monorails, Girders, Stairs,
Ladders, Bracing’s, Heavy Equipment Floor Beams, Bill of Materials and checking of Drawings done by other
Draughts mans. Some of the projects in which I was involved are listed below
Preparation of Civil & Structural R.C.C, details drawings, Fabrication drawings, Plant Layout, Combined drainage, rain water discharge and pavement layout plan, bill of material, bar bending schedules of running projects.
Job involved were to prepare the detail design and fabrication drawings for Industrial Steel structure Such as
Bridge, Columns, Roof Trusses, Roof Purlins, Monorails, Girders, Stairs Ladders, Bracing’s, Heavy Equipment
Floor Beams, Pipe & Cable Supporting Structures, Towers, Conveyors, Jackets, Vessels/Columns & Loading
Delhi, India
Responsible for the preparation of Civil and structural steel detail and fabrication shop drawings for Steel Rolling mills sheds, trusses, building e.g. Equipment Foundations for process equipment’s, Compressors, Rolling, wire Rod, C.C. & Stretch Reducing Mills, Furnaces, Chimney, Cooling Tower, Conveyor, Lubrication Cellar, Control Pulpit, Overhead & Under Ground Water Tanks, Pipe Sleepers, Pipe Racks, Boilers, Pipe Way Bridge Steel Column Foundations, bar bending schedule bill of material.
Preparation of architectural submission drawings, Multistory Buildings, details drawings for development of Plot
Plan, Plant Layout, Area Plan, Road Layout, Site Grading, Pavements, Culverts, Storm Water drainage & sanitary
sewerage, Under Ground Piping, Caustic Sewer, ERC/IRC, WS, PWS Raw/ Drinking/ Cooling Water Systems,
Fire Fighting Facilities. I was involved in ARDEE Group’s Housing and office complex in New Delhi.
.