BASHIR SAYYAD, Marine Engineer (Construction Supervision)

BASHIR SAYYAD

Marine Engineer (Construction Supervision)

CWP ENGINEERING

Lieu
Émirats Arabes Unis - Dubaï
Éducation
Baccalauréat, Civil Engineering
Expérience
20 years, 6 Mois

Partager Mon CV

Empêcher usager


Expériences professionnelles

Total des années d'expérience :20 years, 6 Mois

Marine Engineer (Construction Supervision) à CWP ENGINEERING
  • Émirats Arabes Unis - Abu Dhabi
  • Je travaille ici depuis février 2022

Project: Islands Construction and Canal Excavation Works - Qasr Al Jurf, Abu Dhabi, UAE
Client: Crown Prince Court, Abu Dhabi
Job profile:
Overall supervision of Marine works as a Supervision consultant for: 2 Islands Construction involving dredging, reclamation, Groynes, Revetments and 4.3Km Canal Construction.
Assisting Resident Engineer, co-ordination with Contractor, document reviews.

Civil Marine Engineer à CGGC (China Gezhouba Group Company Ltd.)
  • Émirats Arabes Unis - Umm Al Quwain
  • juin 2020 à janvier 2022

Project: 150MIGD IWP SWRO Desalination Project, UAQ, UAE (June’2020 - present)
Client: NAQA’A Desalination Plant LLC, UAQ
Job profile: Supervision for Marine works - Intake channel rock work/GRP Intake & outfall Pipeline works
Actively handling the review of all documents, co-ordination with associated sub-contractor/colleagues/Client, etc. for the progress of works, assisting the Management in preparation of documents. Also assisting the QA/QC department for monitoring quality, records.

Civil Marine Engineer à JACOBS (Halcrow,Ch2m is now JACOBS)
  • Émirats Arabes Unis - Dubaï
  • novembre 2014 à mai 2020

Project: 22MIGD SWRO Desalination Project, Al Hamra - Ras Al Khaimah, UAE (Mar’2020 - May 2020, 3mo)
Client: Al Hamra Water Company (AHWC), RAK
Job profile:
Overall supervision for civil works for SWRO Desalination Project, Intake/outfall HDPE line and Main Plant area including DAF/MMF/UF & RO/Chemical/Product Water/Admin.Buildings, etc and document review.

Project: Deira Island “A” Six marina construction, Dubai, UAE (Dec’18 - Feb 2020, 1yr 5mo)
Client: NAKHEEL
Job profile:
Overall supervision for six marina construction (736 Berths, 472 piles, 652 pontoons, platform 2x500 Sq.m)
Pile testing, pilling, survey, pre-casting of concrete pontoons, installation of pontoons with all furniture, slipway, rock works, civil/MEP works, testing/commissioning, document review as per project Specifications.

Project: Saqr port phase 1 extension works, RAK-UAE (June’17 - Nov’18, 1yr 6mo)
Client: SAQR PORT
Job profile:
Supervision for construction of 770m quay wall with -18m dredged level.
Precast concrete blocks production and installation, capping beam construction, installation of furniture, dredging survey work, civil works on yard side including misc.MEP works and review of all documents.

Project: Container Terminal 4, Dubai, UAE (Nov’14 - May’17, 2yr 7mo)
Client: DP WORLD
Job Profile:
Overall supervision for 2.3Km quay wall works including dredging to -18/-20m level, precasting and installation
of quay wall blocks, capping beam, scour protection, marine furniture fixing, service gallery, crane rail beam incl.

pilling/rail installation and topside infrastructure wok. Revetment works including stabits for causeway construction connecting to Island.
Bridge construction involving 40m pre-tensioned I-girders and marine installation work. Reclamation and Vibro-
compaction work, Road works and slope protection works. Survey work inspections- marine, land survey.

Marine Engineer à Sogreah Gulf
  • Émirats Arabes Unis
  • mars 2013 à octobre 2014

Project: Jumana Island, Dubai, UAE for
Client: MEERAS
Job profile: overall supervision for the precast yard, quarry rock inspections, sampling/testing for
rocks at the quarry, site, lab and verifying barge draft survey quantity of rock delivery, precast block casting and delivery. Partly assisted the site team during capping beam casting, rock revetment, rock gryone work.

Project Engineer à Bilal Marine Contracting L.L.C
  • Émirats Arabes Unis
  • septembre 2012 à novembre 2012

overall in-charge for balance rocks works near bridge, handing over of temporary causeway for
Island access (rock-36, 000ton), earthwork (135, 000cum) and 86, 000ton excess rock shifting via marine from PJI
to Island 2, rock segregation/testing, barge deck concreting, quantity take-off andestimation.

Project Engineer à Waagner Biro
  • Émirats Arabes Unis
  • mars 2008 à août 2012

Project: Construction of 2 # Groynes - Coastline Stabilization at Jumeirah, Dubai - UAE (Dec’11 -Aug’12)
Client: DM Coastal Management Section
Job profile: Overall execution for construction of 2 # Groyne’s 120m+90m which includes marine/land base
pilling, sand removal from piles by airlifting, installation of timber logs in piles, u/w concreting and beach
profiling, material testing
Project: Modify existing breakwater and creation of new entrance to Fishing Harbour (Feb’12 -May’12)
Client: DM Coastal Management Section
Job profile: overall execution for removal of an existing breakwater, dredging to -4m at the entrance,
construction of new revetment and breakwater, installation of Aid to Navigation, signboard.
Project: Construction of reporting wharf at Dubai creek entrance (Feb’11 -Dec’11)
Client: DM Coastal Management Section
Job profile: overall execution for construction of 219m quay incl. Port/Customs office, construction of
anchored sheet piled quay wall, rock revetment and dredging to -5.1DMD, removal of existing sheet piles,
installation of capping beam incl. complete marine furniture, Fencing, paving, car park shed, etc.
Ground improvement by stone columns over an area of 800m2
at ports/customs office building location
Project: Coastal protection works/improvement to marine structure (Mar’08-’June’11)
Client: DM Coastal Management Section & RTA Marine Section
Job profile: overall execution various work orders for marine works all over Dubai Coastline
o Extension of existing breakwater for protection of beach erosion and beach profiling at Diyafahpalace
o Revetment at al Sufouh 2, near Sheraton Beach, Dubai & soft Gryone/breakwater at Umm-suqeim-1
o Beach reclamation/nourishment and profiling of various beaches within Dubai coastal zone
o Pilling, pontoon installation at Gubaiba Ferry Station, 4 stations across Dubai for waterbus/water taxi and
modification to 7 existing pontoons to accommodate water taxi
o Installation of various types of buoy’s/rope floater lines for demarcations at beaches, Jetksi areas, etc
Project: Floating Bridge Waiting Marina (Golf Club, Al Boom), Police Aid Post (June’08 -Dec’08)
Client: RTA Marine Section
Job profile: overall execution of Marina construction - pilling, pontoon installation with complete marine
furniture incl. breakwater, gangway, Water Bus & Water Taxi Station, ticketing kiosks (both sides of the
floating bridge), slope protection. Police Aid Post building and berthing pontoons for their
boats/Jetski’s.Assisting project manager during the tendering process, planning and execution of new projects.

Engineer (Site Engineer) à Afcons Infrastructure Ltd
  • Inde
  • août 2004 à février 2008

Project: Railway over Bridge at Kalamna Area-Nagpur, (July’06 - Feb’08)
Client: Maharashtra State Road Development Corporation Ltd. - Nagpur
Job profile: overall in charge of the precast yard, construction of casting yard including casting beds/stacking beds, RMG crane fabrication/installation, and mold fabrication for I-girders/piers, execution for foundations, piers, pier cap, deck slab. Casting of 130 nos precast pre-tensioned & 8 nos. post-tensioned I-girders.

Project: Tata Coal Unloading Jetty at Trombay, Mumbai (Mar’06 - June’06)
Client: Tata Power Company
Job profile: overall in charge for capping beam and topside work incl. backfilling, Top-slab concreting (capping beam) including marine furniture, concrete paving & foundation for conveyor belt line and drainage, placement of quay walls blocks and screeding for base block.

Project: Lube oil Base stock and tank foundations at BPCL refinery, Mumbai (Aug’04 - Feb’06)
Client: Bharat Petroleum Corporation Ltd., Mahul - Mumbai
Job profile: Civil & foundation work, execution for construction of Pipe racks, various types of foundations for reactors, heat exchangers, pumps, generators, grouting, pipe/cable trenches, manholes, drainage and paving work, follow up of concrete, concreting, material reconciliations. Construction of 2 tank foundations - 58m dia, 107 piles /tank, 1m dia.15m depth, dynamic pile load test. Preparation of BBS, sub-contractors bill & co-ordination with subcontractors, consultant & client

Site Engineer à S.S. Consultant-Hyderabad
  • Inde
  • août 2003 à juillet 2004

Complete in charge for construction of G+5 story apartment building, hospital expansion project
from foundation to finish and Preparation of BBS, verification of Sub-contractor’s bill.

Éducation

Baccalauréat, Civil Engineering
  • à Dr.B. Ambedkar Marathawada University
  • janvier 2003
Diplôme, Civil Engg
  • à Govt. Polytechnic, Nanded
  • janvier 2000

,

Tests de Bayt.com

IQ Test
IQ Test
Score 109%

Specialties & Skills

Civil Works
On Site
Quantity Surveying
Execution Skills
MICROSOFT OFFICE
MANAGEMENT
QUAYWALL
MARINE CONSTRUCTION
PROBLEM SOLVING
BREAKWATER
TEAM WORK
DECISION MAKING
CREATIVITY
RECLAMATION
CIVIL CONSTRUCTION
DREDGING
REVETMENT
PORT CONSTRUCTION

Langues

Anglais
Expert
Hindi
Expert
Marathi
Langue Maternelle

Adhésions

SOCIETY OF ENGINEERS,UAE
  • CIVIL ENGINEER
  • June 2012

Formation et Diplômes

QMS Internal Auditor - ISO 9001-2008 (Formation)
Institut de formation:
BUREAU VERITAS, Dubai - U.A.E
Date de la formation:
September 2014
Training for “Practical Guide - FIDIC Conditions of contract - 1999” (Formation)
Institut de formation:
MRE Academy, Dubai - U.A.E
Date de la formation:
October 2012