superintendent mechanical.
Nigerian National Petroleum Corporation.
مجموع سنوات الخبرة :25 years, 5 أشهر
-Ensuring availability of pipelines for evacuation of refined petroleum products ppmc storage facilities at the depots to prevent refinery shut-down.
-Ensure availability of mainline, booster pumps and ancillaries to avoid down-time.
-carry out a viral maintenance programme
-Ensure availability of loading facilities.at the depots.
-Effect repair on break-down of mechanical equipments.
-Effect repair on vandalized pipelines .
-Preparation of budget for the department.
-Ensure availability of back-up Power generators.
- carried out maintenance of turbine(drivers) and mainline line /booster pumps.
- carried out operation/maintenance of Atlas-Cove terminal.
-Supervised the installation of flexibox mechanical seal pilot project.
-Re-modified 2EX Aba depot station inlet line .project.
-